Rogue River - Siskiyou National Forest |
Today's Fire Manager: | BC21 |
Comments: |
Project Name Unit Number Type |
Est. Date/Time of Ignition |
Planned Acres Tons per Acre |
Legal | Descriptive Location | Burn Boss | County | Comments | Updated |
---|---|---|---|---|---|---|---|---|
BKS FR13 Underburn |
|
88 10 |
37S-8W-13 | SLATE CR | Josephine | 8-May-2018 12:07:41 | ||
Page CR Roadside Piles |
4/4/2019 08:00 |
20 6 |
41S-8W-2 | Takilma | GrayBack | Josephine | Shelly Steiner PI Completed 15 Ac 4/4/49 | 5-Apr-2019 7:06:14 |
BKS TS3-9 & FR1-2 Underburn |
|
44 8 |
37S-8W-23 | ON FS25 RD OFF HWY199 | Josephine | 9-May-2019 13:28:19 | ||
BKS TS8 Underburn |
|
4 8 |
37S-8W-23 | OFF 25RD | Josephine | 9-May-2019 13:30:39 | ||
BKS TS11 Underburn |
|
32 8 |
37S-8W-13 | BUTCHER KNIFE CR | Josephine | 9-May-2019 13:32:27 | ||
BKS TS4 & FR22 Underburn |
|
71 10 |
37S-8W-12 | SLATE CR | Josephine | 9-May-2019 13:33:35 | ||
BKS TS5 & FR23 Underburn |
|
118 10 |
37S-8W-12 | SLATE CR | Josephine | 9-May-2019 13:34:21 | ||
BKS TS10 & FR11 Underburn |
|
98 10 |
37S-8W-23/24 | 306RD OFF 25RD | Josephine | 9-May-2019 13:37:36 | ||
BKS OHA/ODFW/TS2 &FR5 Underburn |
|
211 10 |
37S-8W-24 | 25RD | Josephine | 9-May-2019 13:41:13 | ||
BKS TS1 & FR9 Underburn |
|
54 10 |
37S-8W-24 | 199 HAYES HILL | Josephine | 9-May-2019 13:42:07 | ||
BKS FR12 & FR19 Underburn |
|
183 10 |
37S-8W-13 | BUTCHER KNIFE CR | Josephine | 9-May-2019 13:50:43 | ||
BKS FR14 & FR20 Underburn |
|
131 10 |
37S-8W-13 | BUTCHER KNIFE CR | Josephine | 9-May-2019 13:51:52 | ||
BKS FR17 & FR18 Underburn |
|
59 10 |
37S-8W-14/15 | 25RD | Josephine | 9-May-2019 13:53:33 | ||
BKS FR25 Underburn |
|
112 10 |
37S-8W-1 | SLATE CR | Josephine | 9-May-2019 13:54:25 | ||
Spalding Pond Piles |
11/14/2019 0900 |
3 1.2 |
37s-9w-13 | Spalding Pond | Gallego | Josephine | 11/14: 2 AC completed | 16-Nov-2019 8:48:23 |
BKS TS12 & FR3 Underburn |
11/18/2019 1000 |
50 10 |
37S-8W-14 | 25 RD | Josephine | Completed 17 of 50 11/18/2019 | 19-Nov-2019 14:50:36 | |
BKS FR15 & 16 Underburn |
11/18/2019 0900 |
113 8 |
37S-8W-14 & 23 | 25 RD NEAR HAYES HILL | DIVS 2 | Josephine | 10/16: completed 70 Ac 11/18/2019 completed all of unit 16 for 56acres 57acres still left in unit 15 | 19-Nov-2019 14:53:12 |
BKS TS6 Underburn |
11/18/19 0900 |
88 8 |
37S-8W-24 | OFF 25RD | DIVS 2 | Josephine | completed 51 acres of second entry burning 11/18/2019 section above the 306 road | 19-Nov-2019 14:54:53 |
BKS FR9 Underburn |
|
54 |
37s 8w s24 | Hays Hill | Josephine | 15-Sep-2021 12:59:43 | ||
BKS FR 11 Underburn |
|
76 |
37s-8w-24 | Slate Creek | Josephine | 15-Sep-2021 13:07:01 | ||
BKS FR7 Underburn |
|
19 |
37S-8W-14 | 25RD | Josephine | 15-Sep-2021 13:11:27 | ||
BKS TS13 Underburn |
|
120 |
37S-8W-13 | SLATE CR | Josephine | 15-Sep-2021 13:12:17 | ||
BKSTS7 & FR21 & FR8 Underburn |
|
121 |
37S-8W-23 | OFF 25RD | Josephine | 15-Sep-2021 13:13 | ||
Waters FR 10 Underburn |
|
315 |
36S-7W-33 | 620/681 RD | Josephine | 15-Sep-2021 13:19:45 | ||
Waters FR 12 Underburn |
|
41 |
36S-7W-30 | 018RD | Josephine | 15-Sep-2021 13:20:14 | ||
Waters FR 13 Underburn |
|
116 |
37S-8W-1 | 020RD | Josephine | 15-Sep-2021 13:20:39 | ||
Waters FR 4 Underburn |
|
165 |
36S-7W-30 | 630RD | Josephine | 15-Sep-2021 13:21:24 | ||
Waters FR 7 Underburn |
|
140 |
36S-7W-28 | 620RD | Josephine | 15-Sep-2021 13:28 | ||
Waters FR 8 Underburn |
|
35 |
36S-7W-32 | 018RD | Josephine | 15-Sep-2021 13:28:38 | ||
Waters FR 9 Underburn |
|
70 |
36S-7W-32 | 602/018RD | Josephine | 15-Sep-2021 13:29:04 | ||
Waters FR11 Underburn |
|
295 |
36S-7W-32/33 | WATERS CR | Josephine | 15-Sep-2021 13:29:36 | ||
Waters FR15 Underburn |
|
91 |
36s-7w-28 | Waters Cr | Josephine | 15-Sep-2021 13:30:12 | ||
Waters FR16 Underburn |
|
46 |
36s-7w-33 | Waters Creek | Josephine | 15-Sep-2021 13:30:37 | ||
Waters FR17 Underburn |
|
24 |
36S-7W-30 | Water creek | Josephine | . | 15-Sep-2021 13:31:18 | |
Waters FR2A Underburn |
|
166 |
36S-7W-31 | Waters Creek | Josephine | 15-Sep-2021 13:31:52 | ||
Waters FR2B Underburn |
|
33 |
36S-7W-31 | Waters Creek | Josephine | 15-Sep-2021 13:32:17 | ||
Waters FR6 Underburn |
|
45 |
36s-7w-28 | Waters creek | Josephine | 15-Sep-2021 13:33:12 | ||
Waters PTFR1 Underburn |
|
124 |
36s-7w-30/31 | waters creek | Josephine | 15-Sep-2021 13:33:55 | ||
Caves Hwy Piles |
|
1 1 |
39s-6w-31 | 4613 Junction | Josephine | 19-Oct-2021 12:50:43 | ||
Briggs Unit 2 Piles |
5/9/2022 11:45 |
0.25 |
T35S 8W Section 27 | Briggs Valley Road/ Tin Can | James Taylor | Josephine | 0.1 Ac. completed 5/9 (SRC Training) | 10-May-2022 7:47:18 |
Waters FR 5 Underburn |
4/28/2023 1000 |
64 4 |
36S-7W-29 | Waters Creek | Felsen/Gallego(Trainee) | Josephine | Planned ignitions for 20 of total acres. Completed 20 acres on 4/28/2023. | 28-Apr-2023 21:00:29 |
Waters FR9 Underburn |
4/28/2023 1000 |
270 4 |
36S-7W-32 | Waters Creek | Felsen/Gallego(Trainee) | Josephine | Completed 143 acres on 4/28/2023. | 28-Apr-2023 21:01:24 |
Waters Creek FR2B Piles |
|
33 4 |
T36S-R7W-Sec 31 | Waters Creek - 42°23.602' N, 123°34.793' W | Josephine | 15-Sep-2023 9:45:53 | ||
Waters Creek FR4A Piles |
|
37 4 |
T36S-R7W-Sec30 | Waters Creek - 42°24.448' N, 123°34.662' W | Josephine | 15-Sep-2023 9:55:03 | ||
WAters Creek 7A Piles |
|
46 4 |
T36S-R7W-Sec28 | Waters Creek - 42°24.130' N, 123°32.165' W | Josephine | 15-Sep-2023 9:59:20 | ||
Waters Creek FR8 Piles |
|
35 4 |
T36S-R7W-Sec32 | Waters Creek - 42°23.507' N, 123°33.220' W | Josephine | 15-Sep-2023 10:00:53 | ||
Waters Creek FR12 Piles |
|
41 4 |
T36S-R7W-Sec30 | Waters Creek - 42°24.438' N, 123°33.980' W | Josephine | 15-Sep-2023 10:05:59 | ||
Waters Creek FR17 Piles |
|
24 4 |
T36S-R7W-Sec30,31 | Waters Creek - 42°24.435' N, 123°33.858' W | Josephine | 15-Sep-2023 11:05:35 | ||
BKS HF9 Piles |
|
119 4 |
T36S-R8W-Sec24 | Butcherknife Creek - 42°20.232' N, 123°35.170' W | Josephine | 15-Sep-2023 11:13:12 | ||
BKS HF10 Piles |
|
111 4 |
T36S-R8W-Sec24 | Butchknife Creek - 42°20.368' N, 123°36.223'W | Josephine | 15-Sep-2023 11:14:46 | ||
BKS HF14 Piles |
|
101 4 |
T36S-R8W-Sec12,13 | Butcherknife Creek - 42°21.288'N, 123°35.910'W | Josephine | 15-Sep-2023 11:16:44 | ||
BKS FR10 Underburn |
|
85 10 |
37S-8W-24 | 162RD HAYES HILL | Josephine | 11-Oct-2023 15:09:51 | ||
Briggs FMZ 10 Piles |
|
60 9 |
36S-8W-Sec22 | Briggs Valley | Josephine | 12-Oct-2023 17:11:59 | ||
Scotch Gulch Dipsite Piles |
10/16/2023 1300 |
1 0.5 |
T41S-R8W-Sec 4 | FS4803 Rd - 032 Spur Road | Osipovich | Josephine | Total of 10 piles or less around water source. | 16-Oct-2023 11:52:08 |
Waters Creek PTFR1 Piles |
11/7/2023 0900 |
136 25 |
T36S-R7W-Sec 30,31 | Waters Creek - 42°24.448 N, 123°34.660' W | Altheide/Alpern(t) | Josephine | Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration within WUI. | 6-Nov-2023 14:43:31 |
Little Falls Campground Piles |
|
5 1.2 |
T38S-R8W-Sec 29 | Illinois River | Josephine | 29-Nov-2023 13:51:32 | ||
Briggs FMZ 27 Piles |
12/05/2023 0900 |
76 3 |
36S-8W-Sec22 | Briggs Valley | Altheide/Alpern(t) | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. Non WUI. Completed 24 acres on 12/5/2023. | 5-Dec-2023 17:49:50 |
Briggs FMZ 6 Piles |
12/13/23 1430 |
36 1.2 |
36S-8W-Sec7 | Briggs Valley | Altheide | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. Non WUI. Completed 4 of 36 acres on 12/13/23. | 13-Dec-2023 17:37:30 |
Slater 48Rd Salvage Piles |
|
216 10 |
T41S-R7W-Sec20,21,28,29,30,31,32,33 | Page Mountain - 450 Spur Rd | Josephine | Machine Piled Decks. Vary in size and frequency along road. Completed 50 Acres 02/13/2024. Completed 25.5 acres on 2/20/2024. Completed 37 acres on 2/21/2024. Completed 27 acres on 3/20/2024. | 20-Mar-2024 15:40:11 | |
Slater AH 2 Piles |
|
33 7.3 |
40S-7W-22 | Althouse Creek - 4703 Rd | Josephine | 24-Jul-2024 15:41:32 | ||
Slater AH 1 Piles |
|
34 7.3 |
40S-7W-22 | Althouse Creek - 4703 Rd | Josephine | 24-Jul-2024 15:41:44 | ||
Slater AH 3 Piles |
|
59 6 |
40S-7W- 22 | Althouse Creek - 4703Rd | Josephine | 24-Jul-2024 15:42:43 | ||
Slater AH 4 Piles |
|
69 6 |
40S-7W-23 | Althouse Creek - 4703Rd | Josephine | 24-Jul-2024 15:43:43 | ||
Slater AH 5 Piles |
|
33 4.9 |
40S-7W-23 | Althouse Creek - 4703Rd | Josephine | 24-Jul-2024 15:44:43 | ||
Slater AH 6 Piles |
|
216 4.9 |
40S-7W-24 | Althouse Creek - 4703RD | Josephine | 24-Jul-2024 15:45:41 | ||
Slater AH 7 Piles |
|
66 4.5 |
40S-7W-26 | Althouse Creek - 4703 Rd | Josephine | 24-Jul-2024 15:47:46 | ||
Slater AH 8 Piles |
|
29 4.5 |
40S-7W-35 | Althouse Creek - 4703 Rd | Josephine | 24-Jul-2024 15:48:40 | ||
Slater AH 9 Piles |
|
25 4 |
40S-7W-35 | Althouse Creek - 4703 Rd | Josephine | 24-Jul-2024 15:49:39 | ||
Slater AH 10 Piles |
|
48 4 |
40S-6W-32 | Althouse Creek - 4703 Rd | Josephine | 24-Jul-2024 15:50:34 | ||
Slater BH 1 Piles |
|
102 4 |
40S-7W-30 | 48 Road | Josephine | 24-Jul-2024 15:56:59 | ||
Slater BH 2 Piles |
|
31 4 |
40S-7W-30 | Buckhorn Ridge - 48Rd | Josephine | 24-Jul-2024 15:57:49 | ||
Slater BH 3 Piles |
|
5 2 |
40S-7W-20 | Buckhorn Ridge - 4804Rd | Josephine | 24-Jul-2024 15:58:35 | ||
Buckhorn FMZ 1 Piles |
|
56 2 |
40S-7W-20 | Buckhorn Ridge - 4804Rd | Josephine | 24-Jul-2024 16:00:36 | ||
Buckhorn FMZ 2 Piles |
|
46 2 |
40S-7W-21 | Buckhorn Ridge - 4804Rd | Josephine | 24-Jul-2024 16:01:23 | ||
Buckhorn Ridge Piles |
|
20 2 |
40S-7W-21 | Buckhorn Ridge - 4804Rd | Josephine | 24-Jul-2024 16:02:27 | ||
Briggs 28 Piles |
|
147 4 |
36S-8W-8 | Briggs Valley | Josephine | 25-Jul-2024 10:58:07 | ||
Briggs FMZ 29 Piles |
|
146 4 |
36S-8W-8 | Briggs Valley | Josephine | 25-Jul-2024 10:58:58 | ||
Briggs FMZ 32 Piles |
|
154 4.9 |
36S-8W-19 | Briggs Valley | Josephine | 25-Jul-2024 11:02:20 | ||
Briggs Valley TS 5 Piles |
|
71 3.2 |
36S-8W-18 | Brushy Creek - 42°26.045', 123°41.227' | Josephine | 10-Aug-2024 13:16:39 | ||
Briggs Valley TS 509 Piles |
|
3 3.2 |
36S-8W-18 | Briggs Creek - 42°26.082', 123°41.098' | Josephine | 10-Aug-2024 13:25:38 | ||
Briggs Valley TS 510 Piles |
|
3 3.2 |
36S-8W-19 | Secret Creek - 42°25.433', 123°41.467' | Josephine | 10-Aug-2024 13:26:56 | ||
Briggs Valley TS 652 Piles |
|
24 4.3 |
36S-8W-19 | Secret Creek - 42°25.618', 123°41.532' | Josephine | 10-Aug-2024 13:28:46 | ||
Briggs FMZ 31 Piles |
11/12/2024 1000 |
73 4.9 |
36S-8W-18 | Briggs Valley - Sam Brown Campground | Gallego | Josephine | Completed 10 acres on 11/6/2024. Completed 30 acres on 11/12/2024 | 12-Nov-2024 18:21:54 |
Project Name Unit Number Type |
Est. Date/Time of Ignition |
Planned Acres Tons per Acre |
Legal | Descriptive Location | Burn Boss | County | Comments | Updated |
---|---|---|---|---|---|---|---|---|
Hogue Roadside Piles |
12/17/2019 10:00 |
20 8.4 |
41S-8W-15 | Takilma area | Keen | Josephine | Completed 2 acres 12/06/2019. Completed 10 acres 12/09/2019. Completed 4 acres 12/10/2019. 4 acres and unit completed on 12/17/2019 | 17-Dec-2019 14:37:36 |
2509 RD Piles |
2/27/2020 10:00 |
5 2 |
36s-7w-16 | Taylor fire | Gallego | Josephine | Completed all acres 02/27/2020. | 27-Feb-2020 14:05:53 |
Taylor HP Piles |
02/27/2020 10:00 |
26 .6 |
36S-7W-7 | 2706 - Shan Cr. RD | Gallego | Josephine | Completed 7 acres on 01/09/2020. Completed all acres on 02/27/2020. | 27-Feb-2020 14:06:20 |
Skagg Creek Piles |
02/26/2021 0900 |
30 5 |
41s-8w-2 | Page Creek | Gallego | Josephine | Completed 02/26/2021. | 26-Feb-2021 13:33:08 |
Waters In-house Piles |
01/15/2021 10:00 |
8 .6 |
36S-7W-30 | 671RD | Gallego | Josephine | Completed all acres. | 16-Mar-2021 9:29:35 |
District Dip sites Piles |
12/7/2020 |
10 1 |
Across district | Across district | Gallego | Josephine | 16-Mar-2021 9:35:34 | |
Big Pine Campground Piles |
12/4/2020 |
8 1 |
Taylor Creek | Gallego | Josephine | 16-Mar-2021 9:41:59 | ||
Waters FR4 Underburn |
4/7/2021 0930 |
165 10 |
36S-7W-30 | 630RD | GRAYBACK | Josephine | Completed 130 acres on 04/06/2021. Completed remaining 35 acres on 04/07/2021. | 9-Apr-2021 8:27:56 |
Illa unit2 pepper camp Piles |
10/7/2021 12:30 |
14 7 |
40S-6W-2 | Pepper camp | Gallego | Josephine | Completed 14 acres 10/07/2021. | 7-Oct-2021 17:52:56 |
25 roadside piles Piles |
10/20/2021 10:00 |
10 .5 |
37s-8w-9 | 25rd | Gallego | Josephine | Completed 10 acres 10/20/2021. | 20-Oct-2021 16:04:59 |
Horse MTN Plantation Piles |
10/20/2021 10:00 |
5 of 16 5 |
37s-9w-2 | Horse MTN | Osipovich | Josephine | Attempted 12/02/20 - too dry. Completed 11 acres on 01/05/2021.Completed 5 acres 10/20/2021. | 20-Oct-2021 16:05:24 |
Ramsey Dip Site Piles |
10/20/2021 11:00 |
1 1 |
37s-8w-3 | 25rd | Gallego | Josephine | Completed 1 acre 10/20/2021. | 20-Oct-2021 16:05:54 |
Rattle Snake springs Piles |
10/20/2021 12:00 |
1 1 |
36s-8w-2 | corner of the 25 and 2509 Rds | Gallego | Josephine | Completed 1 acre 10/20/2021. | 20-Oct-2021 16:06:15 |
ILLA Peppercamp unit1 Piles |
10/22/21 1000 |
6 of 9 7 |
40S-6W-2 | PEPPER CAMP | Gallego | Josephine | In-House burn. Completed 3 acres 10/07/2021. Completed 6 acres 10/22/2021. | 22-Oct-2021 17:16:33 |
I&D Briggs 1 Piles |
1000 11/03/2021 |
61 9.6 |
T35S - R8W - Sec 32 | Briggs Creek | Gallego/Lister(Trainee) | Josephine | Completed 15 acres 10/25/2021. Completed 10 acres 10/26/2021. Completed 10 acres 10/28/2021. Completed 18 acres 11/02/2021. Completed 8 acres on 11/03/2021. | 3-Nov-2021 15:36:58 |
48 Rd Slater Salvage Piles |
11/04/2021 1000 |
20 6 |
T41S-R7W-Sec17 | Page Mountain | Gallego/O'Brien(Trainee) | Josephine | Machine Piles at Page Mountain Snow Park. Completed all acres 11/04/2021. | 4-Nov-2021 13:50:52 |
Waters Creek Trail Maintenance Piles |
03/03/2022 1000 |
25 4.7 |
T36S-R7W-Sec32 | Waters Creek | Gallego/Baird(Trainee) | Josephine | completed 22 acres 3/1/2022 unit complete 3/3/2022 | 3-Mar-2022 15:19:44 |
waters FR2C Piles |
04/13/2022 1000 |
162 9 |
36S-7W-31 | Waters Creek | Gallego | Josephine | completed 28 acres 10/27/2021 completed 32 acres 11/01/2021 completed 36 acres 11/08/2021 completed 8 acres 12/07/2021 completed 17 acres 12/08/2021 completed 12 acres 12/09/2021 completed 15 acres 12/10/2021 Completed 14 acres 04/13/2022. Unit Complete | 13-Apr-2022 13:55:42 |
Briggs FMZ 2 Piles |
11/2/2022 0930 |
51 9 |
35S-R8W-Sec32 | Briggs Valley | Felsen/Baird(trainee) | Josephine | Completed all acres 11/02/2022. | 2-Nov-2022 15:11:59 |
Briggs FMZ 22 Piles |
11/03/2022 0930 |
142 9 |
36S-8W-Sec4 | Briggs Valley - Taylor Creek Rd 9FS2500rd) - 2509rd - N42° 28.083', W123° 39.163' | Felsen/Clayton(Trainee) | Josephine | Fuels generated by hazardous fuels reduction thinning to reduce fuel density and ladder fuels for forest health and prevention of catastrophic wildfire. Hand pile prescribed burn, non WUI. Completed all acres for 142 total 11/03/2022. | 3-Nov-2022 17:14:34 |
Briggs FMZ 3 Piles |
11/3/2022 0930 |
40 9 |
35S-R8W-31 | Briggs Valley - Taylor Creek Rd(FS2500rd) - 2510rd - N42° 28.938', W123° 40.703' | Felsen/Baird(trainee) | Josephine | Fuels generated by hazardous fuels reduction thinning to reduce fuel density and ladder fuels for forest health and prevention of catastrophic wildfire. Hand pile prescribed burn, non WUI. Completed 30 acres on 11/02/2022. Completed remaining 10 acres 11/03/2022. | 3-Nov-2022 17:15:08 |
Briggs FMZ 1B Piles |
11/4/2022 0930 |
42 9 |
36S-R8W-Sec5 | Briggs Valley - Taylor Creek Rd(FS2500rd) near 094 spur - N42° 28.412', W123° 40.263' | Felsen/Clayton(trainee) | Josephine | Fuels generated by hazardous fuels reduction thinning to reduce fuel density and ladder fuels for forest health and prevention of catastrophic wildfire. Hand pile prescribed burn, non WUI.Completed all Acres on 11/4/2022 | 4-Nov-2022 17:24:11 |
Briggs FMZ 19 Piles |
|
180 9 |
36S-8W-Sec17 | Briggs Valley-Taylor Crk Rd (FS-2500RD)- 138 Spur- N 42 25.922', W 123 40.143'. | Josephine | Fuels generated by hazardous fuels reduction thinning to reduce fuel density and ladder fuels for forest health and prevention of catastrophic wildfire. Hand pile prescribed burn, non WUI. Completed 140 Acres on 11/4/2022 Completed 5 Acres on 11/16/2022 Completed remaining 35 acres on 11/29/2022. | 29-Nov-2022 17:22:30 | |
WRRD Compound Piles |
12/01/22 1100 |
20 5 |
T39S R8W S21 | Wild River Ranger District | Andrew Gallego / Dorris (Trainee) | Josephine | Fuels generated by hand pruning and piling within the compound boundary. Small machine pile prescribed burn, within WUI. Total of two piles. 20 acres completed 12/01/2022. | 1-Dec-2022 15:25:42 |
BKS 3&9 Piles |
|
40 1 |
37s-8w-sec23 | Hays Hill 25 Road | Josephine | Completed 5 acres 1/24. Completed 2 acres 1/25. Completed 5 acres 1/26. Completed 14 acres 2/6/2023. Completed 5 acres on 2/7/2023. Completed 9 acres on 2/8/2023 for all acres. | 8-Feb-2023 15:21:29 | |
BKS FR3 Underburn |
4/29/2023 0900 |
40 6 |
37S-8W-SEC23 | Hayes Hill | Felsen/ (t) Jacks | Josephine | Completed 4/29/2023 for a total of 40 acres | 29-Apr-2023 19:42:01 |
Briggs FMZ 17 Piles |
10/11/2023 0930 |
43 6 |
T36S-R8W-S19 | Briggs Valley-Taylor Crk Rd (FS-2500RD)- 138 Spur- N 42 25.922', W 123 40.143' | Gallego | Josephine | Fuels generated by hazardous fuels reduction thinning to reduce fuel density and ladder fuels for forest health and prevention of catastrophic wildfire. Hand pile prescribed burn, non WUI. 35 acres completed 12/7/2022. Completed 90 acres on 2/9/2023. Completed 43 acres on 10/11/2023. Unit complete. | 12-Oct-2023 5:29:55 |
Briggs FMZ 18 Piles |
10/12/2023 0900 |
5 6 |
T36S-R8W-S20 | Briggs Valley-Taylor Crk Rd (FS-2500RD)- 138 Spur- N 42 25.922', W 123 40.143' | Altheide/ Augustadt (t) | Josephine | Fuels generated by hazardous fuels reduction thinning to reduce fuel density and ladder fuels for forest health and prevention of catastrophic wildfire. Hand pile prescribed burn, non WUI. Completed 70 acres on 11/29/2022. 30 acres completed on 12/7/2022. Completed 60 acres on 2/9/2023. Completed 27 acres on 10/11/2023. Completed 5 acres on 10/12/2023. Unit Completed. | 12-Oct-2023 17:13:23 |
Snow Gulch Dipsite Piles |
10/16/2023 1300 |
1 0.5 |
T40S-R7W-Sec 27 SE/NE | Althouse Creek - FS4703 - 018 Spur Road | Steiner | Josephine | Total of 10 piles or less around water source. All acres completed for 1 acre on 10/16/2023. | 16-Oct-2023 14:56:46 |
Hansen Saddle Dipsite Piles |
10/16/23 1300 |
1 .5 |
T35S-R9W-Sec 12 SE/SE | Hansen Saddle on FS2402 Rd | Sianno | Josephine | Total of 10 piles or less around water source. Completed unit for 1 acre on 10/16/2023. | 16-Oct-2023 15:26:39 |
Briggs FMZ 11 Piles |
|
45 9 |
36S-8W-Sec19/20/29 | Briggs Valley - Taylor Creek Road(FS2500Rd) - N42° 25.420', W123° 41.450' | Josephine | Fuels generated by hazardous fuels reduction thinning to reduce fuel density and ladder fuels for forest health and prevention of catastrophic wildfire. Hand pile prescribed burn, non WUI. Completed 50 acres on 11/09/2022. Completed 30 acres on 11/10/2022. Completed 30 acres on 10/12/2023. Completed remaining 45 acres on 10/17/2023. Unit complete. | 17-Oct-2023 13:23:10 | |
BKS HF8 Piles |
|
80 4 |
T36S-R8W-Sec23 | Butcherknife Creek - 42°20.650'N, 123°37.153' W - HWY 199 to FS2500Rd from Hayes Hill | Clayton/ McPherson(t) | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. Non WUI. Completed all 80 acres on 10/24/2023. | 24-Oct-2023 13:28:57 |
BKS FR15 Piles |
10/24/2023 1000 |
97 4 |
T36S-R8W-Sec23 | Butcherknife Creek - 42°20.253' N, 123°36.582' W | Clayton/ McPherson (t) | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. Non WUI. Completed all 80 acres on 10/24/2023. | 24-Oct-2023 14:17:36 |
BKS FR16 Piles |
10/25/2023 1200 |
86 4 |
T36S-R8W-Sec14 | Butcherknife Creek - 42°20.850' N, 123°37.223' W | Dorris/McPherson(t) | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. Non WUI. Completed all acres on 10/25/2023. | 25-Oct-2023 14:22:04 |
BKS FR21 Piles |
10/25/2023 0900 |
43 4 |
T36S-R8W-Sec23 | Butcherknife Creek - 42°20.660' N, 123°37.148' W | Dorris/ McPherson(t) | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. Non WUI. Completed all acres on 10/25/2023. | 25-Oct-2023 14:22:24 |
BKS HF6 Piles |
10/26/2023 0900 |
99 3 |
T36S-R8W-Sec14 | Butcherknife Creek - 42°21.055' N, 123°36.957' W | Baird/McPherson(t) | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. Non WUI. Completed all acres on 10/26/2023. | 26-Oct-2023 12:27:18 |
BKS 26 Piles |
11/2/23 0900 |
51 3 |
T36S R7W Sec31 | Waters Creek | Dorris McPherson (T) | Josephine | Completed all acres for 51 on 11/2/2023. | 2-Nov-2023 14:22:56 |
Scotch Gulch Dip-Site Piles |
11/02/2023 1000 |
5 6 |
T41S-8W-Sec 4 | Scotch Gulch - FS4803Rd to 032 Spur | Altheide | Josephine | Completed all acres for 5 on 11/2/2023. | 2-Nov-2023 14:23:19 |
Waters FR 14 Piles |
11/2/23 1200 |
27 3 |
T36S R7W Sec 30 | Waters Creek | Dorris McPherson (T) | Josephine | Completed all acres for 27 on 11/2/2023. | 2-Nov-2023 14:23:47 |
Waters FR 3 Piles |
11/2/23 1200 |
22 3 |
T36S R7W sec31 | Waters Creek | Dorris McPherson (T) | Josephine | Completed all acres 11/2/2023. | 2-Nov-2023 15:35:49 |
Waters Creek FR2B Piles |
11/3/2023 0900 |
33 4 |
T36S-R7W-Sec 31 | Waters Creek - 42°23.602' N, 123°34.793' W | Dorris/McPherson(t) | Josephine | Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration within WUI. Completed all acres on 11/3/2023. | 3-Nov-2023 13:59:47 |
Waters Creek FR8 Piles |
11/3/2023 1200 |
35 4 |
T36S-R7W-Sec32 | Waters Creek - 42°23.507' N, 123°33.220' W | Dorris/McPherson(t) | Josephine | Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration within WUI. Completed all acres on 11/3/2023. | 3-Nov-2023 14:00:18 |
Waters Creek FR4A Piles |
11/7/2023 1300 |
37 2 |
T36S-R7W-Sec30 | Waters Creek - 42°24.448' N, 123°34.662' W | Altheide/Alpern(t) | Josephine | Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration within WUI. Completed all acres on11/7/2023. | 7-Nov-2023 14:27:30 |
Waters Creek PTFR1 Piles |
11/7/2023 0900 |
136 2 |
T36S-R7W-Sec 30,31 | Waters Creek - 42°24.448 N, 123°34.660' W | Altheide/Alpern(t) | Josephine | Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration within WUI. Completed all acres on 11/7/2023. | 7-Nov-2023 14:28:08 |
Waters Creek FR12 Piles |
11/8/2023 0900 |
41 2 |
T36S-R7W-Sec30 | Waters Creek - 42°24.438' N, 123°33.980' W | Altheide/Alpern(t) | Josephine | Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration within WUI. Completed 10 acres on 11/7/2023. Completed remaining 31 acres on 11/8/2023. | 8-Nov-2023 15:15:09 |
Waters Creek FR17 Piles |
11/8/2023 1100 |
24 4 |
T36S-R7W-Sec30,31 | Waters Creek - 42°24.435' N, 123°33.858' W | Altheide/Alpern(t) | Josephine | Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration within WUI. Completed all acres on 11/8/2023. | 8-Nov-2023 15:15:36 |
WAters Creek FR7A Piles |
11/8/2023 1300 |
46 4 |
T36S-R7W-Sec28 | Waters Creek - 42°24.130' N, 123°32.165' W | Altheide/Alpern(t) | Josephine | Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration within WUI. Completed all 46 acres on 11/8/2023. | 8-Nov-2023 15:16:08 |
BKS HF10 Piles |
11/13/2023 1100 |
111 2 |
T36S-R8W-Sec24 | Butchknife Creek - 42°20.368' N, 123°36.223'W | Altheide/Alpern(t) | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Hand piles consist of slash from regenerated hardwoods and conifers within WUI. Completed 111 Acres 11/13/2023 | 13-Nov-2023 17:50:09 |
BKS HF9 Piles |
11/13/2023 0900 |
119 2 |
T36S-R8W-Sec24 | Butcherknife Creek - 42°20.232' N, 123°35.170' W | Altheide/Alpern(t) | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Hand piles consist of slash from regenerated hardwoods and conifers within WUI. Completed 119 acres 11/13/2023 | 13-Nov-2023 17:51:33 |
Briggs FMZ 24 Briggs 24 Piles |
11/14/2023 1300 |
42 9 |
35S-8W-Sec31 | Briggs Valley | Altheide/Alpern (t) | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. Non WUI. Completed all acres on 11/14/23. | 14-Nov-2023 15:50:03 |
Briggs FMZ 5 Piles |
11/14/2023 1000 |
132 9 |
35S-R8W-Sec30 | Briggs Valley | Altheide/Alpern (t) | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. Non WUI. Completed all acres on 11/14/23. | 14-Nov-2023 15:52:09 |
Briggs FMZ 10 Piles |
11/15/2023 1300 |
60 6 |
36S-8W-Sec22 | Briggs Valley | Altheide/Alpern(t) | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. Non WUI. Completed 25 acres 11/13/2023. Completed remaining 35 acres on 11/15/2023. | 15-Nov-2023 17:21:22 |
Briggs FMZ 4 Piles |
11/15/2023 1000 |
137 9 |
35S-8W-Sec31 | Briggs Valley | Altheide/Alpern (t) | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. Non WUI. Completed all 137 acres on 11/15/2023. | 15-Nov-2023 17:21:45 |
Admin Site (WRRD) Piles |
11/30/2023 1200 |
20 1 |
39s-8w-21 | Cave Junction | Gallego/Alpern(t) | Josephine | Wild Rivers Ranger District - Cave Junction Compound. Miscellaneous fuels generated from: slash and yard debris removal from the past year of maintenence treatments within admin site. 2 total Piles. Completed 11/30/2023. | 30-Nov-2023 12:57:48 |
Briggs FMZ 26 Piles |
12/05/2023 0900 |
108 3 |
36S-8W-Sec22 | Briggs Valley | Altheide/Alpern(t) | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. Non WUI. Completed 45 acres on 11/28/2023. Completed remaining 63 acres on 12/5/2023. | 5-Dec-2023 14:18:05 |
Waters Creek FR18 Piles |
12/7/2023 0900 |
138 1.3 |
T36S-R7W-Sec33 | Waters Creek - 42°23.980' N, 123°32.278' W | Altheide | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. WUI. Completed all acres for 138 on 12/7/2023. | 7-Dec-2023 16:00:33 |
Briggs FMZ 7 Piles |
12/13/23 0900 |
209 3 |
36S-8W-Sec5/6 | Briggs Valley | Altheide | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. Non WUI. Completed 85 of 209 acres on 12/12/23. Completed remaining 124 acres on 12/13/23.. | 13-Dec-2023 14:41:10 |
Briggs FMZ 9 Piles |
12/14/2023 0900 |
130 1.3 |
36S-8W-Sec21 | Briggs Valley | Altheide | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. Non WUI. Completed all 130 acres on 12/14/2023. | 14-Dec-2023 15:46:35 |
Briggs FMZ 8 Piles |
12/14/2023 1300 |
65 2 |
36S-8W-Sec28 | Briggs Valley | Altheide | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. Non WUI. Completed all acres for 65 on 12/14/23. | 14-Dec-2023 18:14:21 |
Star Flat Piles |
02/12/2024 0900 |
14 3 |
38S-8W-Sec8 | Deer Creek | Altheide | Josephine | Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. Completed 12 of 14 acres on 12/13/2022. Completed the last 2 acres. | 12-Feb-2024 18:25:36 |
Waters FR3 Underburn |
5/21/2024 1200 |
22 6.8 |
36S-7W-31 | Waters Creek - 630RD | Gallego/Althiede(t) | Josephine | Full service burn with Grayback. Completed all acres for a total of 22 on 5/21/2024. | 22-May-2024 10:42:20 |
River Bench Campground Piles |
5/30/24 0930 |
5 5 |
38S-9W-Sec 3 | Illinois River Road | Gallego | Josephine | Swamper burn clean-up. Approximately 4 total piles. Completed all 5 acres on 5/30/2024. | 30-May-2024 20:41:59 |
Briggs FMZ 23 Piles |
10/29/2024 0900 |
36 5 |
36S-8W-Sec7 | Briggs Valley | Gallego | Josephine | Full Service Burn with Grayback Forestry. Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. Non WUI. Completed all acres on 10/29/2024 for 36 total acres. | 29-Oct-2024 14:49:58 |
Briggs FMZ 25A Piles |
10/29/2024 1300 |
14 3 |
36S-8W-Sec11 | Briggs Valley | Gallego | Josephine | Full Service Contract - Grayback Forestry. Fuels generated from hazardous fuels reduction thinning and piling. Piles consist of slash from regenerated hardwoods and conifers. Non WUI. Completed all 14 acres on 10/29/2024. | 29-Oct-2024 14:51:15 |
Briggs FMZ 25 Piles |
10/30/2024 0900 |
248 9 |
36S-8W-Sec15/16 | Briggs Valley | Gallego | Josephine | Full Service Burn - Grayback Forestry. Completed all 248 acres on 10/30/2024. | 30-Oct-2024 17:08:33 |
Briggs FMZ 30 Piles |
11/5/2024 1000 |
46 4 |
36S8W-18 | Briggs Valley - Sam Brown Campground | Gallego | Josephine | 5-Nov-2024 16:08:41 | |
Briggs Valley TS 165 Piles |
11/12/2024 1200 |
12 3.2 |
36S-8W-18 | Briggs Creek - 42°27.21', 123°36.67' | Gallego | Josephine | Completed all 12 acres on 11/12/2024. | 12-Nov-2024 18:22:19 |
Briggs Valley TS 4 Piles |
11/12/2024 1200 |
76 3.2 |
36S-8W-18 | Briggs Creek - 42°26.610', 123°41.567' | Gallego | Josephine | Completed all 76 acres on 11/12/2024. | 12-Nov-2024 18:22:40 |
Briggs Valley TS 50 Piles |
11/12/2024 1000 |
14 4.3 |
36S-8W-18 | Dutchy Creek - 42°26.612', 123°41.200' - Sam Brown Campground | Gallego | Josephine | Completed all 14 acres on 11/12/2024 | 12-Nov-2024 18:23:04 |
Briggs Valley TS 508 Piles |
11/12/2024 1300 |
4 3.2 |
36S-8W-7 | Dutchy Creek - 42°27.027', 123°41.767' | Gallego | Josephine | Completed all 4 acres on 11/12/2024. | 12-Nov-2024 18:23:26 |
Briggs Valley TS 6 Piles |
11/12/2024 1000 |
11 4.3 |
36S-8W-7 | Dutchy Creek - 42°27.120', 123°41.720' | Gallego | Josephine | Completed all 11 acres on 11/12/2024. | 12-Nov-2024 18:23:52 |