Rogue River - Siskiyou National Forest |
![]() |
Today's Fire Manager: | DIV2 |
Comments: | DO: DIV2 541-975-4046 |
Project Name Unit Number Type |
Est. Date/Time of Ignition |
Planned Acres Tons per Acre |
Legal | Descriptive Location | Burn Boss | County | Comments | Updated |
---|---|---|---|---|---|---|---|---|
BKS FR13 Underburn |
|
88 10 |
37S-8W-13 | SLATE CR | Josephine | 8-May-2018 12:07:41 | ||
Page CR Roadside Piles |
4/4/2019 08:00 |
20 6 |
41S-8W-2 | Takilma | GrayBack | Josephine | Shelly Steiner PI Completed 15 Ac 4/4/49 | 5-Apr-2019 7:06:14 |
BKS TS3-9 & FR1-2 Underburn |
|
44 8 |
37S-8W-23 | ON FS25 RD OFF HWY199 | Josephine | 9-May-2019 13:28:19 | ||
BKS TS8 Underburn |
|
4 8 |
37S-8W-23 | OFF 25RD | Josephine | 9-May-2019 13:30:39 | ||
BKS TS11 Underburn |
|
32 8 |
37S-8W-13 | BUTCHER KNIFE CR | Josephine | 9-May-2019 13:32:27 | ||
BKS TS4 & FR22 Underburn |
|
71 10 |
37S-8W-12 | SLATE CR | Josephine | 9-May-2019 13:33:35 | ||
BKS TS5 & FR23 Underburn |
|
118 10 |
37S-8W-12 | SLATE CR | Josephine | 9-May-2019 13:34:21 | ||
BKS TS10 & FR11 Underburn |
|
98 10 |
37S-8W-23/24 | 306RD OFF 25RD | Josephine | 9-May-2019 13:37:36 | ||
BKS OHA/ODFW/TS2 &FR5 Underburn |
|
211 10 |
37S-8W-24 | 25RD | Josephine | 9-May-2019 13:41:13 | ||
BKS TS1 & FR9 Underburn |
|
54 10 |
37S-8W-24 | 199 HAYES HILL | Josephine | 9-May-2019 13:42:07 | ||
BKS FR10 Underburn |
|
85 10 |
37S-8W-24 | 162RD HAYES HILL | Josephine | 9-May-2019 13:49:14 | ||
BKS FR12 & FR19 Underburn |
|
183 10 |
37S-8W-13 | BUTCHER KNIFE CR | Josephine | 9-May-2019 13:50:43 | ||
BKS FR14 & FR20 Underburn |
|
131 10 |
37S-8W-13 | BUTCHER KNIFE CR | Josephine | 9-May-2019 13:51:52 | ||
BKS FR17 & FR18 Underburn |
|
59 10 |
37S-8W-14/15 | 25RD | Josephine | 9-May-2019 13:53:33 | ||
BKS FR25 Underburn |
|
112 10 |
37S-8W-1 | SLATE CR | Josephine | 9-May-2019 13:54:25 | ||
Spalding Pond Piles |
11/14/2019 0900 |
3 1.2 |
37s-9w-13 | Spalding Pond | Gallego | Josephine | 11/14: 2 AC completed | 16-Nov-2019 8:48:23 |
BKS TS12 & FR3 Underburn |
11/18/2019 1000 |
50 10 |
37S-8W-14 | 25 RD | Josephine | Completed 17 of 50 11/18/2019 | 19-Nov-2019 14:50:36 | |
BKS FR15 & 16 Underburn |
11/18/2019 0900 |
113 8 |
37S-8W-14 & 23 | 25 RD NEAR HAYES HILL | DIVS 2 | Josephine | 10/16: completed 70 Ac 11/18/2019 completed all of unit 16 for 56acres 57acres still left in unit 15 | 19-Nov-2019 14:53:12 |
BKS TS6 Underburn |
11/18/19 0900 |
88 8 |
37S-8W-24 | OFF 25RD | DIVS 2 | Josephine | completed 51 acres of second entry burning 11/18/2019 section above the 306 road | 19-Nov-2019 14:54:53 |
Admin Site (WRRD) Piles |
|
20 1 |
39s-8w-21 | Cave Junction | Josephine | 15-Sep-2021 12:57:34 | ||
BKS FR9 Underburn |
|
54 |
37s 8w s24 | Hays Hill | Josephine | 15-Sep-2021 12:59:43 | ||
BKS FR 11 Underburn |
|
76 |
37s-8w-24 | Slate Creek | Josephine | 15-Sep-2021 13:07:01 | ||
BKS FR7 Underburn |
|
19 |
37S-8W-14 | 25RD | Josephine | 15-Sep-2021 13:11:27 | ||
BKS TS13 Underburn |
|
120 |
37S-8W-13 | SLATE CR | Josephine | 15-Sep-2021 13:12:17 | ||
BKSTS7 & FR21 & FR8 Underburn |
|
121 |
37S-8W-23 | OFF 25RD | Josephine | 15-Sep-2021 13:13 | ||
Waters FR 10 Underburn |
|
315 |
36S-7W-33 | 620/681 RD | Josephine | 15-Sep-2021 13:19:45 | ||
Waters FR 12 Underburn |
|
41 |
36S-7W-30 | 018RD | Josephine | 15-Sep-2021 13:20:14 | ||
Waters FR 13 Underburn |
|
116 |
37S-8W-1 | 020RD | Josephine | 15-Sep-2021 13:20:39 | ||
Waters FR 14 Underburn |
|
27 |
36S-7W-30 | 630RD | Josephine | 15-Sep-2021 13:21:01 | ||
Waters FR 4 Underburn |
|
165 |
36S-7W-30 | 630RD | Josephine | 15-Sep-2021 13:21:24 | ||
Waters FR 7 Underburn |
|
140 |
36S-7W-28 | 620RD | Josephine | 15-Sep-2021 13:28 | ||
Waters FR 8 Underburn |
|
35 |
36S-7W-32 | 018RD | Josephine | 15-Sep-2021 13:28:38 | ||
Waters FR 9 Underburn |
|
70 |
36S-7W-32 | 602/018RD | Josephine | 15-Sep-2021 13:29:04 | ||
Waters FR11 Underburn |
|
295 |
36S-7W-32/33 | WATERS CR | Josephine | 15-Sep-2021 13:29:36 | ||
Waters FR15 Underburn |
|
91 |
36s-7w-28 | Waters Cr | Josephine | 15-Sep-2021 13:30:12 | ||
Waters FR16 Underburn |
|
46 |
36s-7w-33 | Waters Creek | Josephine | 15-Sep-2021 13:30:37 | ||
Waters FR17 Underburn |
|
24 |
36S-7W-30 | Water creek | Josephine | . | 15-Sep-2021 13:31:18 | |
Waters FR2A Underburn |
|
166 |
36S-7W-31 | Waters Creek | Josephine | 15-Sep-2021 13:31:52 | ||
Waters FR2B Underburn |
|
33 |
36S-7W-31 | Waters Creek | Josephine | 15-Sep-2021 13:32:17 | ||
waters FR3 Underburn |
|
22 |
36S-7W-31 | 630RD | Josephine | 15-Sep-2021 13:32:41 | ||
Waters FR6 Underburn |
|
45 |
36s-7w-28 | Waters creek | Josephine | 15-Sep-2021 13:33:12 | ||
Waters PTFR1 Underburn |
|
124 |
36s-7w-30/31 | waters creek | Josephine | 15-Sep-2021 13:33:55 | ||
Caves Hwy Piles |
|
1 1 |
39s-6w-31 | 4613 Junction | Josephine | 19-Oct-2021 12:50:43 | ||
Briggs Unit 2 Piles |
5/9/2022 11:45 |
0.25 |
T35S 8W Section 27 | Briggs Valley Road/ Tin Can | James Taylor | Josephine | 0.1 Ac. completed 5/9 (SRC Training) | 10-May-2022 7:47:18 |
Briggs FMZ 4 Piles |
|
137 9 |
35S-8W-Sec31 | Briggs Valley | Josephine | 14-Oct-2022 14:45:07 | ||
Briggs FMZ 5 Piles |
|
132 9 |
35S-R8W-Sec30 | Briggs Valley | Josephine | 14-Oct-2022 14:45:57 | ||
Briggs FMZ 6 Piles |
|
36 9 |
36S-8W-Sec7 | Briggs Valley | Josephine | 14-Oct-2022 14:46:55 | ||
Briggs FMZ 7 Piles |
|
209 9 |
36S-8W-Sec5/6 | Josephine | 14-Oct-2022 14:47:41 | |||
Briggs FMZ 8 Piles |
|
65 9 |
36S-8W-Sec28 | Briggs Valley | Josephine | 14-Oct-2022 14:48:35 | ||
Briggs FMZ 9 Piles |
|
130 9 |
36S-8W-Sec21 | Briggs Valley | Josephine | 14-Oct-2022 14:49:21 | ||
Briggs FMZ 10 Piles |
|
60 9 |
36S-8W-Sec22 | Briggs Valley | Josephine | 14-Oct-2022 14:50:06 | ||
Briggs FMZ 23 Piles |
|
36 9 |
36S-8W-Sec7 | Briggs Valley | Josephine | 14-Oct-2022 14:55:26 | ||
Briggs FMZ 24 Piles |
|
42 9 |
35S-8W-Sec31 | Briggs Valley | Josephine | 14-Oct-2022 14:56:10 | ||
Briggs FMZ 25 Piles |
|
248 9 |
36S-8W-Sec15/16 | Briggs Valley | Josephine | 14-Oct-2022 14:56:53 | ||
Briggs FMZ 26 Piles |
|
108 9 |
36S-8W-Sec22 | Briggs Valley | Josephine | 14-Oct-2022 14:57:39 | ||
Briggs FMZ 27 Piles |
|
76 9 |
36S-8W-Sec22 | Briggs Valley | Josephine | 14-Oct-2022 14:58:12 | ||
Slater 48Rd Salvage Piles |
|
216 10 |
T41S-R7W-Sec20,21,28,29,30,31,32,33 | Page Mountain | Josephine | Machine Piled Decks. Vary in size and frequency along road. | 26-Oct-2022 15:14:12 | |
Briggs FMZ 25A Piles |
|
14 9 |
36S-8W-Sec11 | Onion Mountain | Josephine | 1-Nov-2022 8:05:35 | ||
Briggs FMZ 11 Piles |
|
155 9 |
36S-8W-Sec19/20/29 | Briggs Valley - Taylor Creek Road(FS2500Rd) - N42° 25.420', W123° 41.450' | Josephine | Fuels generated by hazardous fuels reduction thinning to reduce fuel density and ladder fuels for forest health and prevention of catastrophic wildfire. Hand pile prescribed burn, non WUI. Completed 50 acres on 11/09/2022. Completed 30 acres on 11/10/2022. | 10-Nov-2022 16:42:39 | |
Star Flat Piles |
|
14 3 |
38S-8W-Sec8 | Deer Creek | Josephine | Fuels generated by hazardous fuels reduction thinning to reduce fuel density and ladder fuels for forest health and prevention of catastrophic wildfire. Hand pile prescribed burn, non WUI. Completed 12 acres on 12/13/2022. | 13-Dec-2022 16:25:45 | |
Briggs FMZ 17 Piles |
2/09/2022 0930 |
168 12 |
T36S-R8W-S19 | Briggs Valley-Taylor Crk Rd (FS-2500RD)- 138 Spur- N 42 25.922', W 123 40.143' | Gallego (Trainee Altheide) | Josephine | Fuels generated by hazardous fuels reduction thinning to reduce fuel density and ladder fuels for forest health and prevention of catastrophic wildfire. Hand pile prescribed burn, non WUI. 35 acres completed 12/7/2022. Completed 90 acres on 2/9/2023. | 10-Feb-2023 5:38:06 |
Briggs FMZ 18 Piles |
2/09/2022 0930 |
192 12 |
T36S-R8W-S20 | Briggs Valley-Taylor Crk Rd (FS-2500RD)- 138 Spur- N 42 25.922', W 123 40.143' | Gallego (Trainee Altheide) | Josephine | Fuels generated by hazardous fuels reduction thinning to reduce fuel density and ladder fuels for forest health and prevention of catastrophic wildfire. Hand pile prescribed burn, non WUI. Completed 70 acres on 11/29/2022. 30 acres completed on 12/7/2022. Completed 60 acres on 2/9/2023. | 10-Feb-2023 5:38:47 |
Waters FR 5 Underburn |
4/28/2023 1000 |
64 4 |
36S-7W-29 | Waters Creek | Felsen/Gallego(Trainee) | Josephine | Planned ignitions for 20 of total acres. Completed 20 acres on 4/28/2023. | 28-Apr-2023 21:00:29 |
Waters FR9 Underburn |
4/28/2023 1000 |
270 4 |
36S-7W-32 | Waters Creek | Felsen/Gallego(Trainee) | Josephine | Completed 143 acres on 4/28/2023. | 28-Apr-2023 21:01:24 |
Waters Creek PTFR1 Piles |
|
136 25 |
T36S-R7W-Sec 30,31 | Waters Creek - 42°24.448 N, 123°34.660' W | Josephine | 14-Sep-2023 16:11:26 | ||
Waters Creek FR2B Piles |
|
33 4 |
T36S-R7W-Sec 31 | Waters Creek - 42°23.602' N, 123°34.793' W | Josephine | 15-Sep-2023 9:45:53 | ||
Waters Creek FR3 Piles |
|
22 4 |
T36S-R7W-Sec31 | Waters Creek - 42°23.962' N, 123°34.827' W | Josephine | 15-Sep-2023 9:53:32 | ||
Waters Creek FR4A Piles |
|
37 4 |
T36S-R7W-Sec30 | Waters Creek - 42°24.448' N, 123°34.662' W | Josephine | 15-Sep-2023 9:55:03 | ||
WAters Creek 7A Piles |
|
46 4 |
T36S-R7W-Sec28 | Waters Creek - 42°24.130' N, 123°32.165' W | Josephine | 15-Sep-2023 9:59:20 | ||
Waters Creek FR8 Piles |
|
35 4 |
T36S-R7W-Sec32 | Waters Creek - 42°23.507' N, 123°33.220' W | Josephine | 15-Sep-2023 10:00:53 | ||
Waters Creek FR12 Piles |
|
41 4 |
T36S-R7W-Sec30 | Waters Creek - 42°24.438' N, 123°33.980' W | Josephine | 15-Sep-2023 10:05:59 | ||
Waters Creek FR14 Piles |
|
27 4 |
T36S-R7W-Sec30 | Waters Creek - 42°24.437' N, 123°34.687' W | Josephine | 15-Sep-2023 10:45:10 | ||
Waters Creek FR17 Piles |
|
24 4 |
T36S-R7W-Sec30,31 | Waters Creek - 42°24.435' N, 123°33.858' W | Josephine | 15-Sep-2023 11:05:35 | ||
Waters Creek FR18 Piles |
|
94 4 |
T36S-R7W-Sec33 | Waters Creek - 42°23.980' N, 123°32.278' W | Josephine | 15-Sep-2023 11:07:25 | ||
BKS HF6 Piles |
|
99 4 |
T36S-R8W-Sec14 | Butcherknife Creek - 42°21.055' N, 123°36.957' W | Josephine | 15-Sep-2023 11:10:08 | ||
BKS HF8 Piles |
|
80 4 |
T36S-R8W-Sec23 | Butcherknife Creek - 42°20.650'N, 123°37.153' W | Josephine | 15-Sep-2023 11:11:49 | ||
BKS HF9 Piles |
|
119 4 |
T36S-R8W-Sec24 | Butcherknife Creek - 42°20.232' N, 123°35.170' W | Josephine | 15-Sep-2023 11:13:12 | ||
BKS HF10 Piles |
|
111 4 |
T36S-R8W-Sec24 | Butchknife Creek - 42°20.368' N, 123°36.223'W | Josephine | 15-Sep-2023 11:14:46 | ||
BKS HF14 Piles |
|
101 4 |
T36S-R8W-Sec12,13 | Butcherknife Creek - 42°21.288'N, 123°35.910'W | Josephine | 15-Sep-2023 11:16:44 | ||
BKS FR15 Piles |
|
97 4 |
T36S-R8W-Sec23 | Butcherknife Creek - 42°20.253' N, 123°36.582' W | Josephine | 15-Sep-2023 11:17:53 | ||
BKS FR16 Piles |
|
86 4 |
T36S-R8W-Sec14 | Butcherknife Creek - 42°20.850' N, 123°37.223' W | Josephine | 15-Sep-2023 11:19:18 | ||
BKS FR21 Piles |
|
43 4 |
T36S-R8W-Sec23 | Butcherknife Creek - 42°20.660' N, 123°37.148' W | Josephine | 15-Sep-2023 11:20:48 | ||
BKS FR26 Piles |
|
51 4 |
T36S-R7W-Sec31 | Waters Creek - 42°24.253' N, 123°34.825' W | Josephine | 15-Sep-2023 11:22:07 |
Project Name Unit Number Type |
Est. Date/Time of Ignition |
Planned Acres Tons per Acre |
Legal | Descriptive Location | Burn Boss | County | Comments | Updated |
---|---|---|---|---|---|---|---|---|
Hogue Roadside Piles |
12/17/2019 10:00 |
20 8.4 |
41S-8W-15 | Takilma area | Keen | Josephine | Completed 2 acres 12/06/2019. Completed 10 acres 12/09/2019. Completed 4 acres 12/10/2019. 4 acres and unit completed on 12/17/2019 | 17-Dec-2019 14:37:36 |
2509 RD Piles |
2/27/2020 10:00 |
5 2 |
36s-7w-16 | Taylor fire | Gallego | Josephine | Completed all acres 02/27/2020. | 27-Feb-2020 14:05:53 |
Taylor HP Piles |
02/27/2020 10:00 |
26 .6 |
36S-7W-7 | 2706 - Shan Cr. RD | Gallego | Josephine | Completed 7 acres on 01/09/2020. Completed all acres on 02/27/2020. | 27-Feb-2020 14:06:20 |
Skagg Creek Piles |
02/26/2021 0900 |
30 5 |
41s-8w-2 | Page Creek | Gallego | Josephine | Completed 02/26/2021. | 26-Feb-2021 13:33:08 |
Waters In-house Piles |
01/15/2021 10:00 |
8 .6 |
36S-7W-30 | 671RD | Gallego | Josephine | Completed all acres. | 16-Mar-2021 9:29:35 |
District Dip sites Piles |
12/7/2020 |
10 1 |
Across district | Across district | Gallego | Josephine | 16-Mar-2021 9:35:34 | |
Big Pine Campground Piles |
12/4/2020 |
8 1 |
Taylor Creek | Gallego | Josephine | 16-Mar-2021 9:41:59 | ||
Waters FR4 Underburn |
4/7/2021 0930 |
165 10 |
36S-7W-30 | 630RD | GRAYBACK | Josephine | Completed 130 acres on 04/06/2021. Completed remaining 35 acres on 04/07/2021. | 9-Apr-2021 8:27:56 |
Illa unit2 pepper camp Piles |
10/7/2021 12:30 |
14 7 |
40S-6W-2 | Pepper camp | Gallego | Josephine | Completed 14 acres 10/07/2021. | 7-Oct-2021 17:52:56 |
25 roadside piles Piles |
10/20/2021 10:00 |
10 .5 |
37s-8w-9 | 25rd | Gallego | Josephine | Completed 10 acres 10/20/2021. | 20-Oct-2021 16:04:59 |
Horse MTN Plantation Piles |
10/20/2021 10:00 |
5 of 16 5 |
37s-9w-2 | Horse MTN | Osipovich | Josephine | Attempted 12/02/20 - too dry. Completed 11 acres on 01/05/2021.Completed 5 acres 10/20/2021. | 20-Oct-2021 16:05:24 |
Ramsey Dip Site Piles |
10/20/2021 11:00 |
1 1 |
37s-8w-3 | 25rd | Gallego | Josephine | Completed 1 acre 10/20/2021. | 20-Oct-2021 16:05:54 |
Rattle Snake springs Piles |
10/20/2021 12:00 |
1 1 |
36s-8w-2 | corner of the 25 and 2509 Rds | Gallego | Josephine | Completed 1 acre 10/20/2021. | 20-Oct-2021 16:06:15 |
ILLA Peppercamp unit1 Piles |
10/22/21 1000 |
6 of 9 7 |
40S-6W-2 | PEPPER CAMP | Gallego | Josephine | In-House burn. Completed 3 acres 10/07/2021. Completed 6 acres 10/22/2021. | 22-Oct-2021 17:16:33 |
I&D Briggs 1 Piles |
1000 11/03/2021 |
61 9.6 |
T35S - R8W - Sec 32 | Briggs Creek | Gallego/Lister(Trainee) | Josephine | Completed 15 acres 10/25/2021. Completed 10 acres 10/26/2021. Completed 10 acres 10/28/2021. Completed 18 acres 11/02/2021. Completed 8 acres on 11/03/2021. | 3-Nov-2021 15:36:58 |
48 Rd Slater Salvage Piles |
11/04/2021 1000 |
20 6 |
T41S-R7W-Sec17 | Page Mountain | Gallego/O'Brien(Trainee) | Josephine | Machine Piles at Page Mountain Snow Park. Completed all acres 11/04/2021. | 4-Nov-2021 13:50:52 |
Waters Creek Trail Maintenance Piles |
03/03/2022 1000 |
25 4.7 |
T36S-R7W-Sec32 | Waters Creek | Gallego/Baird(Trainee) | Josephine | completed 22 acres 3/1/2022 unit complete 3/3/2022 | 3-Mar-2022 15:19:44 |
waters FR2C Piles |
04/13/2022 1000 |
162 9 |
36S-7W-31 | Waters Creek | Gallego | Josephine | completed 28 acres 10/27/2021 completed 32 acres 11/01/2021 completed 36 acres 11/08/2021 completed 8 acres 12/07/2021 completed 17 acres 12/08/2021 completed 12 acres 12/09/2021 completed 15 acres 12/10/2021 Completed 14 acres 04/13/2022. Unit Complete | 13-Apr-2022 13:55:42 |
Briggs FMZ 2 Piles |
11/2/2022 0930 |
51 9 |
35S-R8W-Sec32 | Briggs Valley | Felsen/Baird(trainee) | Josephine | Completed all acres 11/02/2022. | 2-Nov-2022 15:11:59 |
Briggs FMZ 22 Piles |
11/03/2022 0930 |
142 9 |
36S-8W-Sec4 | Briggs Valley - Taylor Creek Rd 9FS2500rd) - 2509rd - N42° 28.083', W123° 39.163' | Felsen/Clayton(Trainee) | Josephine | Fuels generated by hazardous fuels reduction thinning to reduce fuel density and ladder fuels for forest health and prevention of catastrophic wildfire. Hand pile prescribed burn, non WUI. Completed all acres for 142 total 11/03/2022. | 3-Nov-2022 17:14:34 |
Briggs FMZ 3 Piles |
11/3/2022 0930 |
40 9 |
35S-R8W-31 | Briggs Valley - Taylor Creek Rd(FS2500rd) - 2510rd - N42° 28.938', W123° 40.703' | Felsen/Baird(trainee) | Josephine | Fuels generated by hazardous fuels reduction thinning to reduce fuel density and ladder fuels for forest health and prevention of catastrophic wildfire. Hand pile prescribed burn, non WUI. Completed 30 acres on 11/02/2022. Completed remaining 10 acres 11/03/2022. | 3-Nov-2022 17:15:08 |
Briggs FMZ 1B Piles |
11/4/2022 0930 |
42 9 |
36S-R8W-Sec5 | Briggs Valley - Taylor Creek Rd(FS2500rd) near 094 spur - N42° 28.412', W123° 40.263' | Felsen/Clayton(trainee) | Josephine | Fuels generated by hazardous fuels reduction thinning to reduce fuel density and ladder fuels for forest health and prevention of catastrophic wildfire. Hand pile prescribed burn, non WUI.Completed all Acres on 11/4/2022 | 4-Nov-2022 17:24:11 |
Briggs FMZ 19 Piles |
|
180 9 |
36S-8W-Sec17 | Briggs Valley-Taylor Crk Rd (FS-2500RD)- 138 Spur- N 42 25.922', W 123 40.143'. | Josephine | Fuels generated by hazardous fuels reduction thinning to reduce fuel density and ladder fuels for forest health and prevention of catastrophic wildfire. Hand pile prescribed burn, non WUI. Completed 140 Acres on 11/4/2022 Completed 5 Acres on 11/16/2022 Completed remaining 35 acres on 11/29/2022. | 29-Nov-2022 17:22:30 | |
WRRD Compound Piles |
12/01/22 1100 |
20 5 |
T39S R8W S21 | Wild River Ranger District | Andrew Gallego / Dorris (Trainee) | Josephine | Fuels generated by hand pruning and piling within the compound boundary. Small machine pile prescribed burn, within WUI. Total of two piles. 20 acres completed 12/01/2022. | 1-Dec-2022 15:25:42 |
BKS 3&9 Piles |
|
40 1 |
37s-8w-sec23 | Hays Hill 25 Road | Josephine | Completed 5 acres 1/24. Completed 2 acres 1/25. Completed 5 acres 1/26. Completed 14 acres 2/6/2023. Completed 5 acres on 2/7/2023. Completed 9 acres on 2/8/2023 for all acres. | 8-Feb-2023 15:21:29 | |
BKS FR3 Underburn |
4/29/2023 0900 |
40 6 |
37S-8W-SEC23 | Hayes Hill | Felsen/ (t) Jacks | Josephine | Completed 4/29/2023 for a total of 40 acres | 29-Apr-2023 19:42:01 |