BLM - Medford District |
Today's Fire Manager: | None |
Comments: |
Project Name Unit Number Type |
Est. Date/Time of Ignition |
Planned Acres Tons per Acre |
Legal | Descriptive Location | Burn Boss | County | Comments | Updated |
---|---|---|---|---|---|---|---|---|
Deer Willy 25-1 Underburn |
|
30 270 |
38S-6W-25 | 4 Miles NW of Williams | Josephine | 22-Apr-2013 13:32:28 | ||
Angora 11-1C Piles |
|
49 6 |
T34S R7W Sec 11 | West of Sunny Valley | Josephine | 22-Apr-2015 7:26:12 | ||
Deer Willy 19-2 Piles |
|
33 6 |
T39S R5W Sec 19 | Southwest of Williams | Josephine | 22-Apr-2015 7:30:14 | ||
Speaking Coyote 22-1 Piles |
12/05/15 09:30 |
1 10 |
T33S, R5W, Sec. 22 | King Mtn | Osipovich | Josephine | 12-05-15 Handpiles | 5-Dec-2015 12:06:28 |
Deer Willy 11/12 Piles |
12-06-15 1400 |
1 5 |
T39S-R6W Sec 11 | Willams | Main | Josephine | 6-Dec-2015 17:18:10 | |
Deer Willy 20 Piles |
12-06-15 1400 |
1 5 |
T38S-R5W Sec 20 | Willams | Main | Josephine | 6-Dec-2015 17:18:18 | |
Deer Willy 30 Piles |
12-06-15 1400 |
1 5 |
T38S-R5W Sec 30 | Willams | Main | Josephine | 6-Dec-2015 17:18:24 | |
Green Tree Loop Piles |
12-6-2015 1200 |
1 2 |
T35-R7W-S23 | River Banks | Main | Josephine | 6-Dec-2015 17:19:11 | |
Williams 3-6 Piles |
11-30-2016 0800 |
71 375 |
T38s R5w Sec 4 | Water Gap | Mike Main | Josephine | 65 Acres accomplished on 11/28/2016. 11-30-16 6 acres completed. | 2-Dec-2016 7:29:27 |
Cheney Slate TS 13-7 Piles |
12/7/2016 0800 |
42 155 |
T37S R7W Sec 13 | Wilderville | Main | Josephine | 12-7-16 completed 19 acres. | 8-Dec-2016 8:33:11 |
Woodford ROW TS 33 Piles |
|
1 20 |
T32S R5W Sec 33 | Wof Creek | Wallace | Josephine | 11-28-17:tried a test fire, but wasn't able to burn. | 28-Nov-2017 11:46:45 |
Rand Visitor's Center Piles |
|
1 2 |
T34S R8W Sec 24 | Rand Visitor Center | Wallace/Main | Josephine | 1 Acre of piles around the visitor center; completed 10/21/16 | 29-Nov-2017 7:36:29 |
Swamp Divide RS 11 Piles |
|
4 14 |
T33S R4W Sec 11 | Wolf Creek | Josephine | 30-Jan-2018 9:23:25 | ||
Dads Creek 21-3 Piles |
1-30-18 1100 |
23 4 |
T32 R7W Sec21 | Glendale | Wallace | Josephine | 30-Jan-2018 15:26:53 | |
Cheney Slate TS 23-1 Piles |
1-31-18 1400 |
12 7 |
T37S R5W Sec 23 | South Grants Pass | Wallace | Josephine | 1-Feb-2018 6:54:17 | |
Williams 9-8 Piles |
02/01/2019 1100 |
32 6.1 |
T39S R5W Sec 9 | South of Williams | Wallace | Josephine | 28 Acres completed on 2/1/19. 4 Acres left. | 1-Feb-2019 16:31:39 |
Dads Creek 21-1 Piles |
|
1 14 |
T32 R7W Sec21 | Glendale | Josephine | 6-Dec-2019 8:28:49 | ||
Dads Creek 21-2 Piles |
12/6/2019 1200 |
2 17 |
T32 R7W Sec21 | Glendale | Wallace | Josephine | 12/6: Completed 1 Ac. | 6-Dec-2019 16:34:01 |
Deer Willy 25-2 Piles |
12/13/2019 0800 |
289 4.1 |
T38S R6W Sec 25 | Williams | Wallace | Josephine | 15 Acres completed on 2/7/19 140 Acres completed on 12/13/19 | 13-Dec-2019 15:08:48 |
Althouse Clean-up Piles |
12/16/2019 1000 |
6 7 |
T40S R7W Sec 10 | Illinois Valley | Osipovich | Josephine | 12/16/19 Completed 1 Ac 12/5/19: Completed 2 Ac 12-8-17 burned 1 acre | 16-Dec-2019 14:39:20 |
Lucky Pot 5 Piles |
01-08-2020 1400 |
5 8 |
T39S R8W Sec 1 | Illinois Valley | Osipovich | Josephine | 8-Jan-2020 17:34:38 | |
French Flat Meadow Underburn Underburn |
2/12/2020 1000 |
370 1.2 |
T40S R8W Sec 10, 15 | South of Cave Junction | Trevor Wallace | Josephine | 50 acres accomplished on 02/12/2020. | 12-Feb-2020 17:28:58 |
Jumping Bean Piles |
|
|
Josephine | 2-Nov-2022 11:11:19 | ||||
Elk Stew 31-2a Piles |
|
9 80 |
T31S R8W Sec 31 | West Fork Cow Cr | Douglas | 2-Nov-2022 12:07:32 | ||
Coos Coos ROW 1 Piles |
|
5 75 |
41-9W-12 | Oregon Mtn. | Engleson | Josephine | 4-Nov-2022 5:45:30 | |
Silver Butte ROW 1 Piles |
|
5 75 |
32-3W-8 | Cedar springs | Josephine | 4-Nov-2022 5:54:14 | ||
Skyline Ridge landing Piles |
11/04/22 1200 |
3 75 |
31-3W-19 | Galesville reservor | Engleson | Josephine | 1 landing | 4-Nov-2022 18:59:45 |
OH Windy 18-1 Piles |
12/6/22 1000 |
1 8 |
32-5W-18 | windy creek | Engleson | Douglas | 6-Dec-2022 15:57:57 | |
Rum Creek Hazard Piles |
12/12/2024 0900 |
243 5 |
T34S-7W-Sec.4,5,6,7 | 17 miles NW of Grants Pass SSRA | T. Hawkins | Josephine | 15ac burned 11/13/24, 30ac burned 11/14, 10ac burned on 12/9/24. Completed 20 acres 12/12 | 12-Dec-2024 17:21:13 |
Blown Fortune Landing Piles Piles |
12/12/2024 1200 |
98 5 |
T32S-R5W-Sec.3,4,5,8,9,10,17,18 | 22 miles N of Grants Pass SSRA | K. Fukuda | Douglas | 48 Acres completed on 12/12/2024 | 12-Dec-2024 17:33:49 |
Grants Pass Fuels EA Highland Ave. Piles |
12/14/2024 0900 |
85 5 |
T35S-R5W-Sec.31 | 1/4 mile N of Grants Pass SSRA | K. Fukuda | Josephine | 50ac. completed on 12/14/2024 | 14-Dec-2024 18:13:10 |
Project Name Unit Number Type |
Est. Date/Time of Ignition |
Planned Acres Tons per Acre |
Legal | Descriptive Location | Burn Boss | County | Comments | Updated |
---|---|---|---|---|---|---|---|---|
Anderson West 23-1 Underburn |
06/15/2011 1000 |
25 200 |
38S-8W-sec 23 | Reeves Creek | Grayback Forestry | Josephine | 14-Jun-2011 16:03:14 | |
Deer Willy 13-2 Piles |
11/16/10 0:900 |
26 195 |
39S/R6W/S13 | Williams | Grayback | Josephine | PI/ Beck no acers completed 11/15/2010 | 15-Nov-2010 15:37:06 |
Finley Bend East 12-2 Piles |
2/12/11 0800 |
116 300 |
T36S R7W sec 12 | Between Gunnell Rd. and Ferry Hole | Larson | Josephine | 11-Feb-2011 15:06:51 | |
Finley Bend West 11-1 Underburn |
9/29/10 1200 |
45 4 |
T36S R7 W SEC 11 | Near Griffen Park | Mike Appling | Josephine | 45 acres remaining from original 84. burned 44ac unit is has been completed. | 3-Oct-2010 9:29:07 |
Junction Overlook 29-1 Piles |
12/17/2010 0900 |
12 122 |
T39S R8W Sec29 | Woodstock Mountain area 1 mile south of IV state park | Roger Beck | Josephine | In house burn with small BLM crew | 17-Dec-2010 9:00:45 |
Junction Overlook 29-3 Piles |
12/17/2010 0900 |
10 122 |
39S 8W 29 NESW | Woodstock Mountain area 1 mile south of IV state park | Tony Dove | Josephine | Small in house burn with 5 person crew | 17-Dec-2010 9:09:30 |
New Hope 3 Piles |
11/18/11 1200 |
40 5 |
37s-6w-24 | Across from Applegate Golf Course | Contract | Josephine | P.I. Beck | 18-Nov-2011 13:41:20 |
Packer Gulch Piles |
1/11/2011 08:00 |
20 8 |
T37S-R6W-SEC 25 | 5 miles South of Wilderville | Beck | Josephine | 5 misc personnel | 10-Jan-2011 15:39:23 |
Pickett Snake 31A Piles |
02/15/11 0800 |
80 6 |
T35S R6W sec 31 | 3 miles SW of Merlin | Jon Larson | Josephine | completed 80 ac 02/15/11 | 15-Feb-2011 12:27:56 |
Pinnon Hand Piles Piles |
11/12/2010 0800 |
80 600 |
TS36s R6w Sec 05 | 3 Miles South of Merlin | Mitchell | Josephine | Greyback doing work. | 12-Nov-2010 15:27:20 |
Quail Ferry 2A Underburn |
10-8-10 1100 |
5 40 |
T36S R7W sec 2 | 8 miles West of Grants Pass | Roger Beck | Josephine | Burned 60 acres 10-7-10 Completed remaining 5 acres on 10-8-10 | 8-Oct-2010 13:21:41 |
Quail Ferry 35-1 Underburn |
9/29/10 1000 |
9 63 |
T35S R. 7 W Sec 35 | Near Riverbanks rd and Bridge | Yanu Gallimore, Bob Beebe (T) | Josephine | unit has been completed 9 ac burned on 9/29 | 29-Sep-2010 15:53:58 |
Rich and Rocky 9-7 Piles |
11/17/2010 0800 |
65 491 |
34S 8W Sec 9 | 5Miles NW of Rand in the Rum creek Area | Gray Back | Josephine | Tony Dove will be P/I with the Crew | 16-Nov-2010 17:06:33 |
Shiney Queen 23-1 Underburn |
9/30 1100 |
75 3 |
34S-7W-23 | Quartz Creek | Larson | Josephine | 29-Sep-2010 17:15:42 | |
Spencer Wallow 13-20,13-19,13-6a,13-2 Piles |
11-09-2010 0900 |
40 180 |
TS 38s R6 S13 | 3 miles south of Roundtop Mtn. | Roger Beck | Josephine | 10 Person Greyback crw. on site 1 type 6 eng. on site | 8-Nov-2010 16:12:05 |
Water Gap 11-2 Piles |
12/11/10 1200 |
27 12 |
T38S R5W sec 11 | 4 miles N of Williams | Beck | Josephine | 10-Dec-2010 12:09:38 | |
Wolfpup Piles |
01/18/12 1000 |
60 10 |
T33S R7W sec 35 &26 | 9 miles NE of Merlin | PI Beck | Josephine | 18-Jan-2012 13:38:12 | |
Swampwood Piles |
01/18/12 1000 |
15 10 |
T33S R5W sec 5 | 3 Miles NE of Merlin | PI Beck | Douglas | 18-Jan-2012 13:46:42 | |
Dollar Mtn. 2 Piles |
11/16/2011 0800 |
80 468 |
36s-6w-1 | Grayback | Josephine | PI: Larson | 16-Nov-2011 11:31:01 | |
McGindy Thin 1&2 Piles |
11/16/2011 0800 |
47 .5 |
31S4Ws22 | Galsville | Beck | Douglas | 16-Nov-2011 13:07:02 | |
Packer Gulch 2 Piles |
11/18/2011 10:00 |
28 6 |
37s-6w-25 | Murphy (Southside Road) | Grayback Forestry | Josephine | PI: Jon Larson | 18-Nov-2011 13:41:28 |
Stewart Road 5 Piles |
11/19/2011 0800 |
60 600 |
36s-6w-5 | Lower River Rd./ Stewart Rd. | Grayback Forestry | Josephine | PI: Jon Larson Completed 60 acres 11-16-11 | 21-Nov-2011 8:53:39 |
Angora 3A Piles |
1/19/2012 0800 |
13 87 |
T34S-R7W-3 | 4 miles NE of Rand Visitor Center | Beck | Josephine | 20-Jan-2012 12:50:17 | |
Bullwinkle 6 Piles |
1/20/2012 1200 |
10 130 |
T32S-R5W-27 | 4 miles East of Cow Crk Rest Area | Beck | Douglas | 20-Jan-2012 15:52:38 | |
Deer Willy 25-3 Piles |
01/27/12 0900 |
55 280 |
T38S R6W sec 30 | 3 miles NW of Williams | PI Jon Larson | Josephine | Completed unit and entered in Sit reporting. | 27-Jan-2012 16:23:52 |
Deer Willy 31-1A Piles |
02/03/2012 0900 |
30 135 |
39s-5w-31 | Grayback Mountain | Larson | Josephine | 3-Feb-2012 15:00:19 | |
Fortune Run 11 Piles |
2/24/2012 1000 |
30 382 |
32S 5W Sec8 | North of Cow Creek | Beck | Douglas | 24-Feb-2012 16:11:48 | |
Tennesee Ridge 4 Piles |
2/24/2012 1200 |
35 420 |
33S 5W Sec3 | South of Cow Creek | Beck | Josephine | 24-Feb-2012 16:11:14 | |
T. Lime 27-4 Piles |
03/06/12 1200 |
23 149 |
T38S R8W sec 27 | 3 miles N. of Wild Rivers RD | PI Beck | Josephine | 6-Mar-2012 11:29:55 | |
T.Lime 15-1 Piles |
03/06/12 0800 |
41 300 |
T39S R8W sec 15 | 1/2 mile North of WRRD | PI Gallimore | Josephine | 6-Mar-2012 11:31:44 | |
T. Lime 27-1A Piles |
3/6/12 1400 |
7 80 |
T38S R8W S27 | S of Selma | PI Gallimore | Josephine | 6-Mar-2012 14:50:38 | |
Angora 11-1B Piles |
03/07/2012 08:00 |
51 441 |
34S 7W 11 | West of Sunny Valley | Grayback Forestry | Josephine | PI: Gallimore | 7-Mar-2012 13:43:27 |
Deer Willy 29-2 Underburn |
05/11/2012 |
60 6 |
38S-5W-29 | China Basin/Kincad Rd | Larson | Josephine | Completed 5/11/12 | 11-May-2012 15:14:17 |
Tennessee Lime 27-4 Underburn |
05/17/2012 0900 |
23 6 |
38s-8w-27 | Reeves Creek | Grayback Forestry | Josephine | Full service contract burn. P.I. Jon Larson | 17-May-2012 14:53:07 |
Angora 4-3 Piles |
11/9/2011 0900 |
15 124 |
TS 34s R 7w Sec 4 | 5 miles east of Leland | Beck | Josephine | In House burn | 8-Nov-2011 14:55:05 |
Westside 31-1 Piles |
11/10/2011 0900 |
22 198 |
T 32S R 5W Sec 31 SWNE | 1.5 Miles south of Cow Creek rest area | Roger Beck | Douglas | 9-Nov-2011 15:48:56 | |
Angora 4-2 Piles |
11/8/2011 0900 |
46 453 |
34S 7W Sec4 | 5Miles East of Leland | Beckk | Douglas | completed 46ac on 11/08/11 | 8-Nov-2011 15:22:35 |
Slim Jim 17A&B Piles |
11/03/11 0800 |
6 66 |
32s-3w-17 | 3 miles NW of Red Mtn | Beck | Douglas | Piles completed 6 ac on 11/3/11 | 3-Nov-2011 16:08:46 |
Angora 9-4 Piles |
11/08/11 1330 |
23 250 |
T34S R7W sec 9 | 5 miles south of Leland | Beck | Josephine | 8-Nov-2011 13:07:38 | |
Boney Skull 4-2 Piles |
11/09/2011 1000 |
21 9 |
32s-8w-4 | 3 miles NE of Nine Mile Mtn | Gallimore | Douglas | Completed 21 ac on 11/09/11 | 9-Nov-2011 12:19:57 |
Boney Skull 29-2 Piles |
11/09/11 1000 |
26 |
T32S R8Wsec 29 | 2 miles SE of Nine mile mtn | Galimore | Douglas | Completed unit 11-9-11 | 9-Nov-2011 15:08:11 |
Westside 5-3 Piles |
11/17/2011 08:00 |
110 8 |
32s-5w-5 | Grayback | Douglas | PI: Roger Beck | 17-Nov-2011 16:08:24 | |
Angora Goat 15-4A Piles |
10/24/2012 0800 |
17 25 |
34s-7w-15 | top of hog creek | Gallimore | Josephine | completed the unit on 10/24/12 | 24-Oct-2012 13:19:50 |
Eastman Gulch 2 Piles |
10/25/2012 0900 |
15 9 |
34s-5w-3 | Beck | Josephine | 10ac completed on 10/24/12 completed remaining 15ac on 10/25/12 | 25-Oct-2012 15:49:42 | |
Susan Creek 7 Piles |
10/26/12 0900 |
10 72 |
T32S R7W Sec 9 | 6 Miles West of Nine Mile Pk | Beck | Douglas | completed on 10/26/12 | 26-Oct-2012 14:15:01 |
Mini Mule TS Piles |
10/27/12 0800 |
100 50 |
T32S R9W sec 17 | 3 miles NW of Calvert Pk | Josephine | Contract burn Deck Burning | 29-Oct-2012 8:39:14 | |
Buckhorn 10 Piles |
10/30/2012 0800 |
9 12 |
33s-5w-4 | Speaker Road | Beck | Josephine | completed 10/30/12 | 30-Oct-2012 11:42:01 |
Kelsey Whisky 14A Piles |
10/30/2012 0800 |
14 13 |
32s-9w-14 | Calvert | Y.Gallimore | Curry | completed unit on 10/30/12 | 30-Oct-2012 12:24:39 |
Kelsey Whisky 23 E Piles |
10/30/2012 0800 |
14 8 |
32s-9w-23 | Calvert | Y.Gallimore | Curry | completed on 10/30/12 | 30-Oct-2012 16:04:45 |
Deer Willy 21-2 Piles |
11/2/12 0800 |
6 14 |
T38S R5W sec 20 | NW of Provolt | Larson/Beck | Josephine | 11/2/12 completed 6 acres, 0 fires in SIT | 2-Nov-2012 16:30:52 |
Deer Willy 30-1 Piles |
11/2/12 0800 |
8 |
T38S R5W sec30 | NW of Provolt | Larson/Beck | Josephine | 11/2/12 completed 8 acres, 0 fires in SIT. | 2-Nov-2012 16:31:32 |
Silver Hauck ROW 1 Piles |
11/09/2012 0800 |
2 50 |
32S R4W S13 | Hauck Ranch rd | Purchaser | Douglas | Purchaser completed unit for 2 acres | 13-Nov-2012 11:24:01 |
Deer Willy 19-3 Piles |
11/13/2012 08:00 |
54 7 |
39s-5w-19 | Williams | Grayback Forestry | Josephine | 11/13/12 completed for 54 acres | 13-Nov-2012 13:12:56 |
Wagoneer 3-7 Piles |
11/13/2012 08:00 |
22 10 |
T33S R4W 3 | Azalea | Grayback Forestry | Douglas | 13-Nov-2012 14:37:40 | |
Centennial Ridge 9-1D Piles |
11/14/2012 0800 |
40 10 |
34s-7w-9 | 3 miles NE of Rand Recreation area | Grayback Forestry | Josephine | P.I. Roger Beck completed on 11/14/12 | 14-Nov-2012 14:27:41 |
Eastside 3-5 Piles |
11/14/2012 1200 |
16 8 |
33s-5w-3 | 3 miles SE of Barton Co. Park | Grayback Forestry | Josephine | P.I. Beck | 14-Nov-2012 15:01:04 |
Deer Willy 29-3 Piles |
11/15/2012 0800 |
69 5 |
38s-5w-29 | China Gulch (Williams) | Roger Beck | Josephine | Completed 11/15/2012 | 15-Nov-2012 13:43:14 |
McCollum 2-A Piles |
11/16/2012 0900 |
89 684 |
T32S, R5W, Sec. 33 | McCollum Creek Drainage | Main | Douglas | 11-16-12 completed unit | 16-Nov-2012 15:12:50 |
Reuben 17-1 Piles |
11/26/2012 0800 |
10 7 |
32s-7w-10 | Grayback Forestry | Douglas | P.I. Larson completed 11/26/12 | 26-Nov-2012 12:50:54 | |
Rueben 20-1 Piles |
11/26/2012 0800 |
83 7 |
32s-7w-17,20 | Grayback Forestry | Douglas | P.I. Larson Completed 11/26/12 | 26-Nov-2012 12:51:07 | |
Reuben 19-1 Piles |
11/26/2012 0800 |
94 8 |
32s-7w-19 | Grayback Forestry | Douglas | P.I. Larson completed on 11/26/12 | 26-Nov-2012 15:55:56 | |
T. Lime TS 17 Piles |
11/28/2012 0800 |
4 7 |
39s-8w-17 | Kerby (Westside Road) | Grayback Forestry | Josephine | P.I. Yanu Gallimore Completed 11/28/12 | 28-Nov-2012 11:33 |
Wolf Pup TS Piles |
11/28/2012 0800 |
84 3 |
33s-7w-11,13 | Grayback Forestry | Douglas | Timber Sale purchaser burn. Completed on 11/28/12 | 28-Nov-2012 11:35:08 | |
Swampwood TS Piles |
11/28/2012 0800 |
120 0.4 |
33s-5w-31 | Grayback Forestry | Douglas | Timber Sale purchaser burn completed on 11/28/12 | 28-Nov-2012 12:32:59 | |
T. Lime 9-2 Piles |
11/28/2012 0800 |
20 9 |
T39S R8W sec 20 | Kerby Westside Rd | PI - Y.Gallimore | Josephine | Completed on 11/28/12 | 28-Nov-2012 12:45:30 |
Deer Willy 18-1 Piles |
12/13/2012 0800 |
50 6 |
38s-5w-18 | Powell Creek | Gallimore | Josephine | Will take 2 days to complete. 12/12 and 12/13 | 13-Dec-2012 13:43:30 |
Lombardi Piles |
12/14/12 0800 |
8 2 |
T39S R5W sec 6 | Munger Crk of Williams | PI Larson | Josephine | completed 8 acres on 12-14-12 | 14-Dec-2012 10:49:49 |
Jo County Williams 1 Piles |
02/06/2013 0900 |
4 4 |
38SR6WS36 | Williams Mungers Cr | Beck | Josephine | Josephine County 4 miles West of Williams. Completed 8 acres 02/05/2013. Completed 4ac on 2/6/13 | 6-Feb-2013 11:00:33 |
Mackin Gulch 1A Piles |
02/06/2013 1200 |
5 12 |
34s-6w-3 | Sunny Valley | Beck | Josephine | completed 5ac on 2/6/13 | 6-Feb-2013 12:53:54 |
Cheney Slate 23-1,23-5 Piles |
2/14/2012 0800 |
54 6 |
37S 6W Sec23 | 2miles west of Murphy southside Rd. | Beck | Josephine | 54 acres entered in sit | 14-Feb-2013 16:03:42 |
T-Lime 27-1 Piles |
02/21/13 0800 |
71 |
38-8-27 | Reeves Creek | Beck or Galimore | Josephine | Josephine County, 3 miles North of Kerby in the Reeves creek area. Unit completed 2/21/13 | 21-Feb-2013 15:07:59 |
T- Lime 27-2 Piles |
02/21/13 0800 |
76 |
38-8-27 | Reeves Creek | Beck/Galimore | Josephine | Josephine County, 3 miles North of Kerby in the Reeves creek area.Unit completed 2/21/13 | 21-Feb-2013 15:08:54 |
T-Lime - Underburn 27-1 Underburn |
4/23/2013 1000 |
48 288 |
38s 8w 27 | 3 miles N. Of Kerby | PI Y.Gallimore | Josephine | Reeves creek area. Grayback will be burning Unit Completed unit 4/23/13 | 23-Apr-2013 14:45:30 |
T-Lime TS - Underburn 27-12 Underburn |
4/23/2013 1100 |
35 210 |
38s 8w 27 | 3 miles N. of Kerby | PI Y.Gallimore | Josephine | in the Reeves creek area. Grayback is burning Completed unit 4/23/13 | 23-Apr-2013 15:44:17 |
T. Lime 27-3 Underburn |
4/24/2013 1100 |
28 768 |
38s 8w 27 | 3 Miles SW of Selma | BB - Beck | Josephine | Agency Burn with Grayback assisting/Previous burned so 98 acs. left to burn.100 acres completed on 4/23 28acres left per Roger Beck 28 acres acomplished unit complete total 128 acres | 24-Apr-2013 15:47:56 |
T-Lime TS 27-4 Underburn |
4/24/2013 0800 |
23 138 |
38S-8W-27 | 3 miles North of Kerby | Josephine | in the Reeves creek area. Unit completed 2/21/13 complete | 24-Apr-2013 15:52:05 | |
T. Lime TS 17-2 Underburn |
4/24/2013 1100 |
26 156 |
39S-8W-17 | 2 Miles NW of CJ | Galimore | Josephine | 28 acres completed and entered in sit | 24-Apr-2013 16:04:25 |
T-Lime 27-5 Underburn |
04/26/13 0800 |
50 6 |
38-8-27 | Reeves Crk. | Yanu Galimore | Josephine | Josephine County, 3 miles North of Kerby in the Reeves Creek area.unit complete 4/26/13 | 26-Apr-2013 16:18:05 |
Deer Willy 3-1 Underburn |
10/26/13 10am |
38 190 |
39s r6w sec 3 | Near Williams | beck | Josephine | Completed all acres 10/26/13 | 26-Oct-2013 15:05:44 |
Deer Willy 34-1 Underburn |
10/25/13 1000 |
25 500 |
38S-6W-34 | 6 Miles West of Williams | Yanu Gallimore | Josephine | Completed 30 acres 10/23/2013. Completed 45 acres 10/24/2013. Completed 25 acres to complete the Unit 10/25/2013. | 28-Oct-2013 8:15:30 |
Eastside 23-2 Piles |
|
10 5 |
T32S R5W Sec 23 | 1 mile SE Quines Crk | Douglas | 6-Nov-2013 16:03:02 | ||
Fortune Branch Restoration Piles |
11/07/13 1300 |
4 6 |
32S-5W-17 | 2 miles NW of Quines Crk | Douglas | commpleted for 4 acres | 7-Nov-2013 16:28:53 | |
Silver Hauck T.S. Piles |
11/12/13 0900 |
1 100 |
32-4-13 | Galesville | Beck | Josephine | Completed total acres 11/12/13. | 12-Nov-2013 14:42:17 |
Swampwood Decks Piles |
11/15/13 1400 |
5 30 |
T32S R5W Sec 31 | 4 miles East of Glendale | Douglas | completed unit for 5 acres | 15-Nov-2013 9:31:14 | |
Double Rum Decks Piles |
11/15/13 1000 |
41 3 |
T34S R8W Sec 15 | 3 miles NW of Rand Visitor Center | Josephine | completed unit for 41 acres | 15-Nov-2013 12:07:05 | |
Slim Decks Piles |
11/15/13 1000 |
5 20 |
T32S R4W Sec 28,31 | 3 miles SE of Quines Crk | Douglas | completed unit for 5 acres | 15-Nov-2013 12:15:20 | |
Eastside 3-3A Piles |
11/19/2013 08:00 |
49 8 |
T33S R5W Sec 3 | 3 miles South of Quines Crk | Grayback | Josephine | PI: Beck 11-19-2013 completed 49 acres | 19-Nov-2013 11:03:24 |
Eastside 3-3B Piles |
11/19/2013 08:00 |
55 8 |
T33S R5W Sec 3 | 3 miles South of Quines Crk | Grayback | Josephine | PI: Beck 11-19-2013 completd 55 acres | 19-Nov-2013 15:02:47 |
McKnabe Decks Piles |
11/20/13 |
58 1 |
T34S R7W Sec 4 | 4 miles NE of Rand Visitor Center | Josephine | completed 58 on 11-20-2013 | 20-Nov-2013 14:59:35 | |
Eastside 13-1 Piles |
11-20-2013 |
92 7 |
T32S R5W Sec 13 | 1 miles SE of Azalea | Grayback | Douglas | PI: Beck | 20-Nov-2013 15:11:35 |
Eastside 27-2 Piles |
11-20-2013 |
14 8 |
T32S R5W Sec 27 | 3 miles South of Azalea | Grayback | Douglas | PI: Beck | 20-Nov-2013 15:11:56 |
Cathedral Hills 4 Piles |
3/31/2011 0800 |
25 195 |
36s-5w-31 | Grants Pass | Larson | Josephine | Completed 25ac on 3/31/11 | 21-Nov-2013 9:57:28 |
Deer Creek 2 Piles |
11/03/2011 0800 |
39 187 |
39S 6W Sec 9 | On the Northside of Holcomb PK | Roger Beck | Josephine | 39 ac completed 11/03/11 | 21-Nov-2013 13:35:07 |
Fizzleout 1 Piles |
01/28/14 1200 |
5 acres 50 tons |
32S-4W-21 | 4 miles East of Quines Crk | Beck | Douglas | Attempted to Burn 11/12/13 not much luck Completed about 5 of the 10 acres. Completed last 5 acres to complete Unit # 1. | 28-Jan-2014 12:16:19 |
Westside 17-3 Piles |
01/29/2014 09:00 |
3 4 |
T39S 8W Sec 17 | Illinois Valley | Beck | Josephine | completed unit for 3ac on 1/29/14 | 29-Jan-2014 15:16:01 |
Login Mine Piles |
02/06/14 0900 |
3 10 |
40-8-9 | Login cut near CJ | Beck | Josephine | 6-Feb-2014 14:32:38 | |
Crook Creek Piles |
2/6/14 1200 |
1 5 |
T37S R7W Sec 35 | 6 miles NE Selma | Josephine | 6-Feb-2014 14:32:45 | ||
Althouse Sucker 3-1 A1 Piles |
2/7/14 1100 |
27 4 |
T40S R7W Sec 3 | 3 miles North of Buckhorn Ridge | Josephine | 27 Acres completed 2/7/14 | 7-Feb-2014 15:02:39 | |
Althouse Sucker 3-1 A2 Piles |
2/7/14 1100 |
33 4 |
T40S R7W sec 3 | 3 miles North of Buckhorn Ridge | Josephine | 33 acres acomplished 2/7/14 | 7-Feb-2014 15:03:05 | |
Althouse Sucker 9-4A Piles |
2/7/14 1100 |
4 4 |
T39S R7W sec 9 | 6 miles NE of Cave Jct | Josephine | 4 acres acomplished on 2/7/14 | 7-Feb-2014 15:03:58 | |
T Lime 15-3A Piles |
2/7/2014 1130 |
6 ? |
39S 8 W sEC15 | 1.5 MILES SE OF KERBY | APPLING | Josephine | 6 acres acomplished 2/7/14 | 7-Feb-2014 15:06:17 |
Deer North 7-11 Piles |
02/07/14 1200 |
13 5 |
T38S R7W sec 7 | 2 miles East of Selma | Josephine | 13 acres acomplished 2/7/14 | 7-Feb-2014 15:07:20 | |
T Lime 15-4B Piles |
2/7/2014 1130 |
7 ? |
39S 8W Sec15 | 1.5 Miles SE of Kerby | Appling | Josephine | 7 acres acomplished 2/7/14 | 7-Feb-2014 15:08:05 |
Azalea Peak 10 Piles |
2/12/204 1000 |
12 10 |
T32S R4W S7 | Azalea Peak | Beck | Josephine | Completed 12 2/12/14 | 12-Feb-2014 15:27:04 |
Deer Willy 20-1B Piles |
2/12/2014 0830 |
35 8 |
T38S R5W Sec 20 | 3 miles NW of Williams | Galimore (Yanu) | Josephine | Completed 35 Acres 2/12/2014 | 12-Feb-2014 15:36:44 |
Deer Willy 17A Piles |
2/12/2014 1300 |
19 7 |
T38S R5W Sec 20 | 3 miles NW of Williams | Yanu Gallimore | Josephine | completed 19 Acres 2/12/2014 | 12-Feb-2014 15:37:23 |
Meadow Creek #4 Piles |
02/12/2014 08:00 |
18 7 |
T31S R3W Sec 31 | 5 miles North of Cedar Springs Repeater | Beck | Douglas | Completed 2/12/2014 | 12-Feb-2014 15:41:51 |
Eastfork 23-12A Piles |
2/12/14 0900 |
8 5 |
T40S R8W Sec 23 | 2 Miles North of Takilma | Appling | Josephine | Completed 2/12/14 | 12-Feb-2014 16:30:08 |
Eastfork 23-12B Piles |
2/12/14 1100 |
4 5 |
T40S R8W Sec 23 | 2 Miles North of Takilma | Appling | Josephine | Completed 2/12/14 | 12-Feb-2014 16:30:54 |
Eastfork 24-2B Piles |
02/12/14 1300 |
19 5 |
T40S R8W Sec 24 | 2 Miles North of Takilma | Appling | Josephine | Completed 2/12/14 | 12-Feb-2014 16:31:32 |
Azalea Peak 8 Piles |
2/13/2014 0830 |
21 10 |
T31S-R4W-SEC 31 | 3 miles NE of Azalea | Beck | Douglas | completed 2/13/14 | 13-Feb-2014 15:02:07 |
Azalea Peak 7 Piles |
2/13/14 1330 |
12 10 |
T31S-R4W-SEC 31 | 3 miles NE of Azalea | Beck | Douglas | Acomp0lished 12 acres 2/13/14 | 13-Feb-2014 16:33:19 |
Deer Willy 21-1 Piles |
2/14/2014 0800 |
27 4 |
T38S R5W Sec 20 | 3 miles NW of Williams | Josephine | Completed 27 acres 2/14/14 | 14-Feb-2014 14:12:50 | |
Deer Willy 20-1C Piles |
2/14/2014 0800 |
15 4 |
T38S R5W Sec 20 | 3 miles NW of Williams | Appling | Josephine | 15 acre completed 2/14/14 | 14-Feb-2014 14:18:21 |
Eastfork 24-2A Piles |
02/14/14 1200 |
13 5 |
T40S R8W Sec 24 | 2 Miles North of Takilma | Josephine | Completed 13 acres 2/14/14 | 14-Feb-2014 14:21:26 | |
Big Windy 1 Piles |
10/22/2014 10:00 |
1 100 |
T33S R10W 22 | Big Windy Fire Area | Beck | Curry | 22-Oct-2014 16:14:31 | |
Eastside 27-1 Piles |
10/28/2014 1200 |
20 5 |
T32S 5W 27 | South of Azalea | Beck | Douglas | completed 20 acres on 10/28/2014. | 28-Oct-2014 14:20:29 |
Eastside 32-1 Piles |
10/28/2014 1200 |
49 7 |
T31S R4W 32 | Galesville Area | Beck | Douglas | completed 49 acres on 10/28/2014. | 28-Oct-2014 14:20:55 |
Slim TS Piles |
10/28/2014 1200 |
5 15 |
T32S R4W 29 | SE of Azalea | Beck | Douglas | completed 6 acres on 10/28/2014. | 28-Oct-2014 14:23:06 |
Wolf Pup 13-5 Piles |
10/28/2014 0800 |
14 4 |
T33S 7W 13 | West of Glendale | Main | Josephine | burned 14 acres completed unit | 28-Oct-2014 15:20:40 |
Wolf Pup 11-1A Piles |
10/28/2014 0800 |
37 2 |
T33S R7W 11 | West of Glendale | Main | Josephine | Completed 37 acres on 10/28/2014. | 28-Oct-2014 16:11:36 |
Wolf Pup 13-1 Piles |
10/28/2014 0800 |
26 3 |
T33S R7W 13 | West of Glendale | Main | Josephine | Completed 26 acres on 10/28/2014. | 28-Oct-2014 16:12:02 |
Brimstone TS 23-1 Piles |
10/30/14 8:00 |
39 2.6 |
34-7-23 | Quarts Creek | Beck | Josephine | Salvage piles completed 10/30/14 | 30-Oct-2014 14:30:38 |
Brimstone TS 27-24 Piles |
10/30/14 10:00 |
10 1.5 |
34-7-27 | Quarts Creek | Beck | Josephine | 10-30-14 com-leted 10 acres | 30-Oct-2014 14:50:25 |
Brimstone TS 7 Piles |
10/30/14 1400 |
1 2 |
34-6-7 | Quarts Creek | Beck | Josephine | 10-30-014 completed for 1 acres | 30-Oct-2014 14:50:45 |
Sawmill Gap Piles |
11/13/14 08:00 |
10 40 |
T33S R8W 23 | Mount Reuben Area | Main | Josephine | All 10 acres completed 11/13/2014 | 13-Nov-2014 10:14:24 |
Koehler Jones 5A Piles |
11/13/14 1300 |
0 8 |
T32S R4W Sec 17 | 4 miles NE of Quines Crk | Beck | Douglas | completed 11-13-14 for 9 acres. | 13-Nov-2014 15:34:13 |
Deer Willy 5-1 Piles |
11/13/14 08:00 |
123 9 |
T38S R5W 5,7,8 | South of Murphy | Beck | Josephine | burned 123 acres 11-13-14 | 13-Nov-2014 16:24:45 |
Deer North 29-2 Piles |
11/19/14 08:00 |
14 4 |
T37S R7W 29 | NE of Selma | Gallimore | Josephine | Completed all 14 acres 11/19/2014 | 19-Nov-2014 9:25:19 |
Deer North 31-1 Piles |
11/19/14 10:00 |
12 3 |
T37S R7W 31 | NE of Selma | Gallimore | Josephine | Completed all 12 acres 11/19/2014 | 19-Nov-2014 9:25:39 |
Althouse Sucker 9-2A Piles |
11/19/14 0800 |
24 4 |
T39S R7W sec 9 | 6 miles NE of Cave Jct | Beck | Josephine | Completed all 24 acres 11/19/2014 | 19-Nov-2014 13:33:35 |
Althouse Sucker 12-8 Piles |
11/19/14 1000 |
3 4 |
T40S R7W 12 | Illinois Valley | Beck | Josephine | completed 11/19/14 | 19-Nov-2014 14:41:41 |
Tennessee Lime 17-3A Piles |
11/19/14 09:00 |
2 5 |
T39S R8W 17 | Illinois Valley | Beck | Josephine | 11-19-14 2 acres | 19-Nov-2014 15:09:09 |
Lawson 1-4L Piles |
11/18/14 1200 |
33 4 |
T32S R6W 1 | North of Glendale | Main | Douglas | Completed all 33 acres 11/19/2014 | 19-Nov-2014 15:17:05 |
Althouse Sucker 10-8 Piles |
11/19/14 0900 |
8 4.5 |
T40S 7W 10 | 3 mi NE of Buckhorn Ridge | Beck | Josephine | not entered on 2/7/14 | 19-Nov-2014 18:11:33 |
Deer Willy 29-4 Piles |
11/20/14 08:00 |
20 8 |
T38S R5W 29 | West of Williams | Beck | Josephine | Completed 20ac on 11/20/14 | 20-Nov-2014 10:04:55 |
Tennessee Lime 17-4 Piles |
11-20-14 0800 |
38 8 |
T39S R8W 17 | West of Cave Junction | Main | Josephine | completed 38ac on 11/20/14 | 20-Nov-2014 14:02:05 |
Deer Willy 20-1A Piles |
11/20/14 1030 |
41 7 |
T38S R5W 20 | West of Williams | Josephine | completed 41 ac on 11/20/14 | 20-Nov-2014 14:02:30 | |
Rocky East Fork #2 Piles |
11-20-14 1400 |
4 8 |
T39S R5W 21 | South of Williams | Josephine | 4ac completed on 11/20/14 | 20-Nov-2014 15:19:46 | |
Rocky Test SP #12 Piles |
11-20-2014 1415 |
12 18 |
T39S R5w sec 21 | Rocky Crk out of Williams | Gallimore | Josephine | Not done 2/14 unite completed for 12 ac on 11/20/14 | 20-Nov-2014 16:04:19 |
Eastfork 24-5 Piles |
11/20/14 1400 |
3 5 |
T40S R8W Sec 24 | 2 Miles North of Takilma | Main | Josephine | 3 acres completed 2/14/14 3 left completed remaining 3ac on 11/20/14 | 20-Nov-2014 16:20:47 |
Farout #11-2 Piles |
11-21-14 0800 |
35 150 |
T31S R9W Sec11 | 1 1/2 mile east Sixmile Ridge | Beck | Douglas | 35 acre unit completed on 11/21/14 | 21-Nov-2014 14:54:28 |
Farout #11-3 Piles |
11-21-14 0800 |
16 40 |
T31S, R9W, Sec 11 | East of Sixmile Ridge | Beck | Douglas | 16 acre unit completed 11/21/14 | 21-Nov-2014 14:54:42 |
Farout #7-2 Piles |
11-21-14 0800 |
4 30 |
31S,8W, Sec7 | NW Big Dutchman Butte | Beck | Douglas | 30 acre unit 11/21/14 completed | 21-Nov-2014 14:54:55 |
Farout 11-2 Piles |
11-21-14 0800 |
35 150 |
T31S R9W Sec11 | 1 1/2 mile east Sixmile Ridge | Beck | Douglas | 35 acre unit 11/21/14 completed | 21-Nov-2014 14:55:08 |
Farout 11-3 Piles |
11-21-14 0800 |
16 40 |
T31S R9W Sec11 | East of Sixmile Ridge | Beck | Douglas | 16 acre unit 11/21/14 completed | 21-Nov-2014 14:55:22 |
Farout 11-4 Piles |
11-21-14 0800 |
33 150 |
T31S R9W Sec11 | East of Sixmile Ridge | Beck | Douglas | 33 acre unit. 11/21/14 completed | 21-Nov-2014 14:55:42 |
Farout 11-5 Piles |
11-21-14 0800 |
2 15 |
T31S R9W Sec11 | East Sixmile Ridge | Beck | Douglas | 2 acre unit 11/21/14 completed | 21-Nov-2014 14:55:55 |
Farout 11-6 Piles |
11-21-14 0800 |
6 5 |
T31S R9W Sec11 | East of Sixmile Ridge | Beck | Douglas | 6 acre unit 11/21/14 completed | 21-Nov-2014 14:56:21 |
Farout 13-1 Piles |
11-21-14 0800 |
14 35 |
T31S R9W Sec11 | East of Sixmile Ridge | Beck | Douglas | 14 acre unit 11/21/14 completed | 21-Nov-2014 14:56:44 |
Farout 13-3 Piles |
11-21-14 0800 |
3 10 |
T31S R9W Sec11 | East of Sixmile Ridge | Beck | Douglas | 3 acre unit completed 11/21/14 | 21-Nov-2014 15:00:17 |
Farout 15-1 Piles |
11-21-14 0800 |
28 125 |
T31S R9W Sec15 | SE of Sixmile Ridge | Beck | Douglas | 28 acre unit completed 11/21/14 | 21-Nov-2014 15:00:29 |
Farout 15-2 Piles |
11-21-14 0800 |
21 100 |
T31S R9W Sec15 | SE Sixmile Ridge | Beck | Douglas | 21 acre unit completed 11/21/14 | 21-Nov-2014 15:00:44 |
Farout 20-1 Piles |
11-21-14 0800 |
15 75 |
T31S R8W Sec20 | N of Cold Mountain | Beck | Douglas | 15 acre unit completed 11/21/14 | 21-Nov-2014 15:01:01 |
Farout 21-1 Piles |
11-21-14 0800 |
9 50 |
T31S R9W Sec20 | N. Gold Mountain | Beck | Douglas | 9 acre unit completed 11/21/14 | 21-Nov-2014 15:01:12 |
Farout 21-2 Piles |
11-20-14 0800 |
35 75 |
T31S R9W Sec21 | NE Gold Mountain | Beck | Douglas | 36 acre unit completed 11/21/14 | 21-Nov-2014 15:01:20 |
Farout 21-3 Piles |
11-20-14 0800 |
8 50 |
T31S R9W Sec21 | NE of Gold Mountain | Beck | Douglas | 8 acre unit completed 11/21/14 | 21-Nov-2014 15:01:27 |
Farout 23-1 Piles |
11-21-14 0800 |
11 50 |
T31S R9W Sec23 | E. Gold Mountain | Beck | Douglas | 11 acre unit completed 11/21/14 | 21-Nov-2014 15:01:35 |
Farout 23-2 Piles |
11-21-14 0800 |
7 40 |
T31S R9W Sec23 | E. Gold Mountain | Beck | Douglas | 7 acre unit completed 11/21/14 | 21-Nov-2014 15:01:42 |
Farout 23-3 Piles |
11/21/2014 08:00 |
3 10 |
T31S R9W Sec23 | 3 miles East of Gold Mt | Beck | Douglas | 3 acre unit completed 11/21/14 | 21-Nov-2014 15:01:51 |
Farout 23-4 Piles |
11/21/2014 08:00 |
12 35 |
T31S R9W Sec23 | 3 mi east of Gold Mt | Beck | Douglas | 12 acre unit completed 11/21/14 | 21-Nov-2014 15:02 |
Farout 23-5 Piles |
11/21/2014 08:00 |
13 40 |
T31S R9W Sec23 | 3 mi east of Gold Mt | Beck | Douglas | 13 acre unit completed 11/21/14 | 21-Nov-2014 15:02:47 |
Farout 27-1 Piles |
11/21/2014 08:00 |
3 15 |
T31S R9W Sec27 | 3 mi east of Gold Mt | Beck | Douglas | 3 acre unit completed 11/21/14 | 21-Nov-2014 15:04:10 |
Farout 27-2 Piles |
11/21/2014 08:00 |
16 40 |
T31S R9W Sec27 | 3 mi east of Gold Mt | Beck | Douglas | 16 acre unit completed 11/21/14 | 21-Nov-2014 15:04:17 |
Farout 27-3 Piles |
11/21/2014 08:00 |
17 70 |
T31S R9W Sec27 | 3 mi east of Gold Mt | Beck | Douglas | 17 acre unit completed 11/21/14 | 21-Nov-2014 15:04:25 |
Farout 29-1 Piles |
11/21/2014 08:00 |
11 50 |
T31S R8W Sec29 | 2 mi south of Dutchman Butte | Beck | Douglas | 11 acre unit completed 11/21/14 | 21-Nov-2014 15:04:34 |
Farout 31-2 Piles |
11/21/2014 08:00 |
17 75 |
T31S R8W Sec31 | 3 mi south west of Dutchman Butte | Beck | Douglas | 17 acre unit completed 11/21/14 | 21-Nov-2014 15:04:47 |
Farout 31-3 Piles |
11/21/2014 08:00 |
14 70 |
T31S R8W Sec31 | 3 mi southwest of Dutchman Butte | Beck | Douglas | 14 acre unit completed 11/21/14 | 21-Nov-2014 15:04:58 |
Farout 31-4 Piles |
11/21/2014 08:00 |
2 10 |
T31S R8W Sec31 | 3 mi southwest of Dutchman Butte | Beck | Douglas | 2 acre unit completed 11/21/14 | 21-Nov-2014 15:05:06 |
Farout 35-1 Piles |
11/21/2014 08:00 |
7 20 |
T31S R8W Sec35 | 3 mi southeast of Dutchman Butte | Beck | Douglas | 7 acre unit completed 11/21/14 | 21-Nov-2014 15:05:14 |
Farout 7-1 Piles |
11-20-14 0800 |
11 70 |
T31S R8W Sec7 | NW Big Dutchman Butte | Beck | Douglas | 70 acre unit completed 11/21/14 | 21-Nov-2014 15:05:27 |
Farout 7-2 Piles |
11-21-14 0800 |
4 30 |
T31S R8W Sec7 | NW Big Dutchman Butte | Beck | Douglas | 30 acre unit completed 11/21/14 | 21-Nov-2014 15:05:35 |
Douglas #1 Piles |
11-21-14 1542 |
1 10 |
T33S, R8W, Sec 17 | 3 miles NE Horsehoe Bend CG | Main | Josephine | 1 acre unit completed 11/21/14 | 21-Nov-2014 16:04:02 |
Lawson 1-1LC Piles |
11/22/14 0800 |
20 6 |
T32S R6W 1 | North of Glendale | Main | Douglas | completed 11/22/14 | 24-Nov-2014 9:27:01 |
Lawson 1-2 Piles |
11/22/14 1000 |
9 2 |
T32S R6W 1 | North of Glendale | Main | Douglas | 9 acre unit completed 11/22/14 | 24-Nov-2014 9:27:13 |
Lawson 1-1LD Piles |
11/19/14 1000 |
9 3 |
T32S R6W 1 | North of Glendale | Main | Douglas | 9 acre unit completed 11/22/14 | 24-Nov-2014 9:27:26 |
Rattlesnake 1-2R Piles |
11/22/14 1200 |
38 4 |
T33S R7W 1 | West of Glendale | Main | Douglas | completed 11/22/14 | 24-Nov-2014 9:27:36 |
Williams 1 Piles |
11-22-14 0800 |
21 8 |
T38S R5W Sec 13 | 4 miles North of Williams | Beck | Josephine | 91ac total 50ac completed on 11/20/14 20ac completed 11/21/14 completed 21ac on 11/22/14 | 24-Nov-2014 9:28:22 |
Williams 2 Piles |
11-22-14 |
75 8 |
T38S R5W Sec 13 | 4 miles North of Williams | Josephine | 155 total ac 11/21/14 burned 80ac completed 75ac on 11/22/14 | 24-Nov-2014 9:28:43 | |
Tennessee Lime 35-1 Piles |
1/14/2014 0800 |
40 7 |
T38S R8W sec 35 | 3 miles Se of Eight Dollar Mtn | Grayback Forestry | Josephine | PI Roger Beck 40 acres completed 1/14/14. Completed additional 27 acres 12/01/2014 via Beck. | 2-Dec-2014 8:46:57 |
Althouse Sucker 18-1 Piles |
2/7/14 1100 |
5 4 |
T40S R7W Sec 18 | 2 miles NW of Buckhorn Ridge | Josephine | Completed 5 acres 2/7/14. Completed additional 5 acres 12/1/2014 via Beck. | 2-Dec-2014 8:49:23 | |
Althouse Sucker 35-13B Piles |
2/7/14 0900 |
8 4.5 |
T40S 7W 35 | 1 mi N of French Peak | Josephine | 8 acres acomplished 2/7/14. Completed additional 13 acres 12/1/2014 via Beck. | 2-Dec-2014 8:50:32 | |
Althouse Sucker 35-23 Piles |
2/7/14 0900 |
8 4.5 |
T40S 7W 35 | 1 mi N of French Peak | Josephine | 8 acres acomomplished 2/7/14. Completed an additional 7 acres 12/1/2014 via Beck. | 2-Dec-2014 8:51:31 | |
Deer North 7-11 Decks Piles |
12/02/2014 1000 |
18 3 |
T38S R7W sec 7 | 2 miles East of Selma | Beck | Josephine | unit completed on 12/2/14 for 18ac | 2-Dec-2014 15:12:50 |
Deer North 33-1 Piles |
12/02/14 1000 |
54 3 |
T37S R7W 33 | East of Selma | Beck | Josephine | unit completed on 12/2/14 54ac | 2-Dec-2014 15:13:13 |
Althouse Sucker 8-1 Piles |
12/3/14 0800 |
48 4.5 |
T39S 7W 35 | 9 miles NW of Oregon Caves | Beck | Josephine | not entered 2/7/14 48 total ac completed 48ac on 12/3/14 | 3-Dec-2014 12:17:02 |
Speaking Coyote 11-1 Piles |
12/3/14 0800 |
15 75 |
T33S R5W sec 11 | 5 miles East of Wolf Creek | Main | Josephine | 15ac total completed 15ac on 12/3/14 | 3-Dec-2014 12:17:31 |
Speaking Coyote 10-3 Piles |
12/3/14 0800 |
11 50 |
T33S R5W Sec 10 | 5 miles East of Wolf Creek | Main | Josephine | 11ac total completed 11ac on 12/3/14 | 3-Dec-2014 12:17:45 |
Speaking Coyote 10-2 Piles |
12/3/14 0800 |
41 200 |
T33S R5W Sec 10 | 5 Miles East of Wolf Creek | Main | Josephine | 41 total ac completed 41ac on 12/3/14 | 3-Dec-2014 12:18:06 |
Speaking Coyote 17-1 Piles |
12/3/14 0800 |
5 50 |
T33S R5W Sec 17 | 4 miles East of Wolf Creek | Main | Josephine | 5ac total completed 5ac on 12/3/14 | 3-Dec-2014 14:50:34 |
Starving Cow T.S. Piles |
12/3/2014 1550 |
1 100 |
T32S, R4W, Sec. 3 | Whitehorse | Main | Douglas | Hand piles. completed 12/3/13 | 3-Dec-2014 16:34:39 |
Rattlesnake 1-3R Piles |
12/5/14 0900 |
13 12 |
T33S R7W 1 | West of Glendale | Main / Beck | Josephine | 43ac total and 10ac completed on 11/22/14 completed 30ac on12/4/14 12-5-14 completed unit for 1 | 5-Dec-2014 16:03:51 |
Junction Overlook 33-2 Piles |
12/9/2014 08:00 |
15 8 |
T39S R8W 33 | South of Cave Junction | Beck | Josephine | 32ac total 17ac completed on 12/3/14 completed remaining 15ac on 12/9/14 | 9-Dec-2014 13:30:08 |
Deer Willy 12-2 Piles |
12/9/2014 0800 |
12 8 |
T39S R6W 11 | West of Williams | Y. Gallimore | Josephine | completed on 12/9/14 | 9-Dec-2014 15:02:35 |
Deer Willy 12-1 Piles |
12/9/2014 0800 |
1 8 |
T39S R6W 12 | West of Williams | Y. Gallimore | Josephine | 1ac total unit completed on 12/9/14 | 9-Dec-2014 16:08:39 |
Dollar Mountain 3 Piles |
12-10-14 0800 |
119 5 |
T36S R6W 1 | West of GP | Gallimore | Josephine | completed unit on 12/10/14 | 10-Dec-2014 12:32:10 |
Deer Willy 12-3 Piles |
12/10/2014 0800 |
22 8 |
T39S R6W 11 | West of Williams | Main | Josephine | 22ac total completed unit on 12/10/14 | 10-Dec-2014 13:21:16 |
Deer Willy 12-4 Piles |
12/10/2014 0800 |
12 8 |
T39S R6W 12 | West of Williams | Main | Josephine | 17ac total completed 5ac on 12/9/14 completed unit on 12/10/14 | 10-Dec-2014 13:21:35 |
Deer Selmac 1-1 Piles |
12/10/2014 08:00 |
27 10 |
T39S R8W 1 | 3 miles NE Cave Junction | Main | Josephine | 27ac total completed on 12/10/14 | 10-Dec-2014 15:33:54 |
Scottish Verbascum 2D Piles |
2/2/2015 1000 |
7 9 |
T38S R7W 31 | East of Selma | Gallimore | Josephine | 14ac total 7ac completed 12/10/14 7ac completed 2/2/15 | 2-Feb-2015 11:56:51 |
Althouse Sucker 11-15 Broadcast |
2/24/2015 10:00 |
11 12 |
T40S R7W 11 | Southeast of Cave Junction | Gallimore | Josephine | Unit complete for 11 acres 2/24/2015. | 24-Feb-2015 14:02:44 |
Tennessee Lime 1-2 Underburn |
5/1/2015 1100 |
24 6 |
T39S R8W Sec 1 | NE of Cave Junction | Gallimore | Josephine | 5-5-15completed 24 acres, | 1-May-2015 16:08:13 |
French Flat Underburn |
10/23/2015 1200 |
5 .25 |
T40S R8W Sec 10, 15 | South of Cave Junction | M. Main | Josephine | completed all 5 acres 10/23/15 | 23-Oct-2015 16:30:02 |
Deer Willy 22-1 Piles |
11-1-2015 1200 |
1 1 |
T38S-R6WSEC23 | Williams | Main | Josephine | Completed 1 acre 11/1/2015. | 2-Nov-2015 8:29:46 |
Spencer Wallow 14-14 Piles |
11-1-2015 1000 |
24 2 |
T38S-R6WSEC14 | Murphy | Main | Josephine | Completed 24 acres 11/1/2015. | 2-Nov-2015 8:30:01 |
Rogue Cow 13-1 Piles |
11-3-2015 1000 |
17 3 |
T32S-R8W SEC 13 | Glendale | Main | Douglas | 11-3-15; completed unit | 3-Nov-2015 12:35:38 |
Rogue Cow 13A1 Piles |
11-3-2015 0930 |
8 9 |
T32S-R8W SEC 13 | Glendale | Main | Douglas | 11-3-15:n completed unit | 3-Nov-2015 12:36 |
Rogue Cow 13B Piles |
11-3-2015 0900 |
19 .5 |
T32S-R8W SEC 13 | Glendale | Main | Douglas | 11-3-15: completed unit | 3-Nov-2015 12:36:24 |
Rogue Cow 13E Piles |
11-3-2015 1030 |
4 5 |
T32S-R8W SEC 13 | Glendale | Main | Douglas | 11-3-15: completed unit | 3-Nov-2015 12:36:40 |
Rogue Cow 13F Piles |
11-3-2015 1100 |
3 3 |
T32S-R8W SEC 13 | Glendale | Main | Douglas | 11-3-15: completed unit | 3-Nov-2015 12:36:56 |
Rogue Cow 11-2A Piles |
11/3/2015 10:00 |
1 1 |
T32S-R8W SEC 11 | Glendale | Main | Douglas | 11-3-15: completed unit | 3-Nov-2015 12:38:51 |
Rogue Cow Roadside SEC 13 Piles |
11-3-2015 1000 |
10 9 |
T32S-R8W SEC 13 | Glendale | Main | Douglas | 11-3-15: completed unit | 3-Nov-2015 12:40:48 |
Rogue Cow Roadside SEC 12 Piles |
11/3/2015 10:00 |
1 8 |
32S-R8W SEC 12 | Glendale | Main | Douglas | completed unit 11-3-15 | 3-Nov-2015 12:41:54 |
Rogue Cow 12-1 Piles |
11/3/2015 10:00 |
3 1 |
T32-R8W SEC 12 | Glendale | Main | Douglas | completed unit on 11-3-15 | 3-Nov-2015 12:42:54 |
Rogue Cow 3-2A Piles |
11/3/2015 10:00 |
6 9 |
T32S-R8W SEC 3 | Glendale | Main | Douglas | Completed all 6 acres 11/3/2015 | 3-Nov-2015 13:01:21 |
Rogue Cow 11-3A Piles |
11/3/2015 10:00 |
5 10 |
T32S-R8W SEC11 | Glendale | Main | Douglas | Completed all 5 acres 11/3/2015 | 3-Nov-2015 13:58:13 |
Rogue Cow 11-3B Piles |
11/3/2015 10:00 |
11 7 |
T32S-R8W SEC 11 | Glendale | Main | Douglas | Completed all 11 acres 11/3/2015 | 3-Nov-2015 13:58:26 |
Rogue Cow 27-2A Piles |
11-04-15 0900 |
81 4.5 |
T32S-R7W SEC 27 | Glendale | Main | Douglas | Completed 81 acres 11/4/2015 | 4-Nov-2015 12:55:43 |
Rogue Cow 17-1A Piles |
11-04-15 1100 |
3 5 |
T32S-R7W SEC 17 | Glendale | Osipovich | Douglas | Completed all 3 acres 11/4/2015 | 4-Nov-2015 12:56:01 |
Rogue Cow 19-2 Piles |
11-04-15 1100 |
7 15 |
T32S-R7W SEC 19 | Glendale | Osipovich | Douglas | Completed all 7 acres 11/4/2015 | 4-Nov-2015 12:56:25 |
Rogue Cow 9-7A Piles |
11-04-15 1000 |
9 1 |
T32S-R7W SEC 9 | Glendale | Osipovich | Douglas | 11-4-15; completed unit for 9 acres | 4-Nov-2015 15:11:53 |
Rogue Cow 9-2A Piles |
11-04-15 1000 |
1 3 |
T32S-R7W SEC 9 | Glendale | Osipovich | Douglas | 11-4-15: completed unit for 1 acre | 4-Nov-2015 15:12:32 |
Rogue Cow 9-5A Piles |
11-04-15 1000 |
3 2 |
T32S-R7W SEC 9 | Glendale | Osipovich | Douglas | 11-4-15; completed unit for 3 acre | 4-Nov-2015 15:12:52 |
Rogue Cow 9-6A Piles |
11-04-15 1000 |
5 4 |
T32S-R7W SEC 9 | Glendale | Osipovich | Douglas | 11-4-15; completed unit for 5 acres | 4-Nov-2015 15:13:16 |
Rogue Cow Roadside SEC 17 Piles |
11-04-15 1100 |
1 9 |
T32S-R7W SEC 17 | Glendale | Osipovich | Douglas | 11-4-15: completed unit for 1 acre | 4-Nov-2015 15:13:37 |
Burnt Rattler 25-1A Piles |
11/09/15 1030 |
2 10 |
T33S-R7W SEC25 | Glendale | Main | Josephine | Completed 2ac on 11/9/15 | 9-Nov-2015 13:38:28 |
Burnt Rattler 10-1 Piles |
11/09/15 1300 |
26 7.5 |
T33S-R7W SEC 10 | Wolf Creek | Main | Douglas | Completed all 26ac 11/9/2015. | 9-Nov-2015 16:28:09 |
Burnt Rattler 11-2 Piles |
11/09/15 1400 |
14 3.5 |
T33S-R7W SEC11 | Wolf Creek | Main | Douglas | Completed all 14ac 11/9/2015. | 9-Nov-2015 16:28:17 |
Burnt Rattler 13-18 Piles |
11/09/15 0900 |
3 6 |
T33S-R7W SEC13 | Glendale | Main | Josephine | Completed all 3ac 11/9/2015. | 9-Nov-2015 16:28:23 |
Burnt Rattler 13-2 Piles |
11/09/15 0900 |
32 3 |
T33S-R7W SEC 13 | Glendale | Main | Douglas | Completed all 32ac 11/9/2015. | 9-Nov-2015 16:28:31 |
Burnt Rattler 13-6 Piles |
11/09/15 0900 |
5 2 |
T33S-R7W SEC13 | Glendale | Main | Josephine | Completed all 5ac 11/9/2015. | 9-Nov-2015 16:28:38 |
Burnt Rattler 14-2 Piles |
11/09/15 0900 |
2 25 |
T33S-R7W SEC14 | Glendale | Main | Douglas | Completed all 2ac 11/9/2015. | 9-Nov-2015 16:28:44 |
Burnt Rattler 23-10C Piles |
11/09/15 0930 |
3 3 |
T33S-R7W SEC 23 | Glendale | Main | Josephine | Completed all 3ac 11/9/2015. | 9-Nov-2015 16:28:51 |
Burnt Rattler 23-1A Piles |
11/09/15 0930 |
6 2 |
T33S-R7W SEC 23 | Glendale | Main | Josephine | Completed all 6ac 11/9/2015. | 9-Nov-2015 16:28:56 |
Burnt Rattler 23-2A Piles |
11/09/15 0930 |
5 3 |
T33S-R7W SEC 23 | Glendale | Main | Josephine | Completed all 5ac 11/9/2015. | 9-Nov-2015 16:29:02 |
Burnt Rattler 23-2B Piles |
11/09/15 0930 |
13 1 |
T33S-R7W SEC 23 | Glendale | Main | Josephine | Completed all 13ac 11/9/2015. | 9-Nov-2015 16:29:08 |
Burnt Rattler 23-2C Piles |
11/09/15 0930 |
5 6 |
T33S-R7W SEC 23 | Glendale | Main | Josephine | Completed all 5ac 11/9/2015. | 9-Nov-2015 16:29:13 |
Burnt Rattler 23-3B Piles |
11/09/15 1000 |
1 20 |
T33S-R7W SEC 23 | Glendale | Main | Josephine | Completed 1ac 11/9/015. | 9-Nov-2015 16:29:18 |
Burnt Rattler 23-4A Piles |
11/09/15 1000 |
43 3 |
T33S-R7W SEC23 | Glendale | Main | Josephine | Completed all 43ac 11/9/2015. | 9-Nov-2015 16:29:24 |
Burnt Rattler 23-7 Piles |
11/09/15 1000 |
11 4 |
T33S-R7W SEC23 | Glendale | Main | Josephine | Completed all 11ac 11/9/2015. | 9-Nov-2015 16:29:29 |
Burnt Rattler 25-2A Piles |
11/09/15 1030 |
3 14 |
T33S-R7W SEC 25 | Glendale | Main | Josephine | Completed all 3ac 11/9/2015. | 9-Nov-2015 16:29:35 |
Burnt Rattler 27-B Piles |
11/09/15 1130 |
3 3 |
T33S-R7W SEC 27 | Glendale | Main | Josephine | Completed all 3ac 11/9/2015. | 9-Nov-2015 16:29:39 |
Burnt Rattler 9-4 Piles |
11/09/15 1100 |
12 2 |
T33S-R7W SEC9 | Glendale | Main | Douglas | Completed all 12ac 11/9/2015. | 9-Nov-2015 16:29:44 |
Burnt Rattler 9-5 Piles |
11/09/15 1100 |
3 6 |
T33S-R7W SEC 9 | Glendale | Main | Douglas | Completed all 3ac 11/9/2015. | 9-Nov-2015 16:29:49 |
Burnt Rattler 9-9 Piles |
11/09/15 1100 |
7 3 |
T33S-R7W SEC 9 | Glendale | Main | Douglas | Completed all 7ac 11/9/2015. | 9-Nov-2015 16:29:53 |
Burnt Rattler Road Haz Piles |
11/09/15 0900 |
1 40 |
T33S-R7W SEC 13 | Glendale | Main | Josephine | Completed 1ac 11/9/2015. | 9-Nov-2015 16:29:57 |
Rockstar TS 1 Piles |
11/9/2015 1330 |
133 4 |
T33S-R7W SEC 3 | Glendale | Main | Douglas | Completed all 133ac 11/9/2015. | 9-Nov-2015 16:30:02 |
Rogue Cow 15-1 Piles |
11/09/15 1000 |
3 4 |
T32S-R8W SEC 15 | Glendale | Osipovich | Douglas | Completed all 3ac 11/9/2015. | 9-Nov-2015 16:30:07 |
Rogue Cow 25-2 Piles |
11/09/15 1100 |
1 6 |
T32S-R8W SEC 25 | Glendale | Osipovich | Douglas | completed 1ac 11/9/15 | 9-Nov-2015 16:30:13 |
Rogue Cow 25-5 Piles |
11/09/15 1100 |
1 17 |
T32S-R8W SEC 25 | Glendale | Osipovich | Douglas | completed 1ac on 11/9/15 | 9-Nov-2015 16:30:17 |
Rogue Cow 25-6 Piles |
11/09/15 1100 |
12 1 |
T32S-R8W SEC 25 | Glendale | Osipovich | Douglas | completed 12ac on 11/9/15 | 9-Nov-2015 16:30:22 |
Rogue Cow 25-7 Piles |
11/09/15 1100 |
2 .5 |
T32S-R8W SEC 25 | Glendale | Osipovich | Douglas | completed 2ac on 11/9/1/15 | 9-Nov-2015 16:30:26 |
Rogue Cow 27-5 Piles |
11/09/15 1130 |
17 1 |
T32S-R8W SEC27 | Glendale | Osipovich | Douglas | Completed all 17ac 11/9/2015. | 9-Nov-2015 16:30:31 |
Rogue Cow 35-5 Piles |
11/09/15 1030 |
7 2 |
T32S-R8W SEC 35 | Glendale | Osipovich | Douglas | Completed all 7ac 11/9/2015. | 9-Nov-2015 16:30:37 |
Rogue Cow Roadside SEC 19 Piles |
11/09/15 1000 |
1 7 |
T32S-R7W SEC 19 | Glendale | Osipovich | Douglas | Completed 1ac 11/9/2015. | 9-Nov-2015 16:30:44 |
Rogue Cow Roadside SEC 23 Piles |
11/09/15 0900 |
6 7 |
T32S-R8W SEC 23 | Glendale | Osipovich | Douglas | Completed all 6ac 11/9/2015. | 9-Nov-2015 16:30:47 |
Slim TS S28-1N Piles |
11/09/15 1300 |
9 8 |
T32S-R4W SEC 28 | Azalea | Osipovich | Douglas | Completed all 9ac 11/9/2015. | 9-Nov-2015 16:31:04 |
Slim TS S29-1S Piles |
11/09/15 1300 |
58 2 |
T32S-R4W SEC 29 | Azalea | Osipovich | Douglas | Completed all 58ac 11/9/2015. | 9-Nov-2015 16:31:09 |
Wolf Pup 10-1 Piles |
11/09/15 1230 |
46 2 |
T33S-R7W SEC 9/10 | Glendale | Main | Douglas | Completed all 46ac 11/9/2015. | 9-Nov-2015 16:31:14 |
Wolf Pup 11-1 Piles |
11/09/15 1400 |
37 1.5 |
T33S-R7W SEC 11 | Glendale | Main | Douglas | Completed all 37ac 11/9/2015. | 9-Nov-2015 16:31:18 |
Wolf Pup 13-2 Piles |
11/09/15 0830 |
8 4 |
T33S-R7W SEC 13 | Glendale | Main | Josephine | Completed all 8ac 11/9/2015. | 9-Nov-2015 16:31:23 |
Slim TS 30-2 Piles |
111/09/15 1200 |
10 5 |
T32S-R4W SEC 30 | Azalea | Osipovich | Douglas | completed 10ac on 11/9/15 | 9-Nov-2015 16:42:09 |
Boomerang 1-3L Piles |
11-10-15 1100 |
85 1 |
T32S-6W SEC1 | Glendale | Main | Douglas | Completed 85ac on 11/10/15. | 10-Nov-2015 15:18:35 |
Lawson 11-1LA Piles |
11-10-15 1130 |
16 4 |
T32S R6W SEC 11 | Glendale | Main | Douglas | Completed 16ac on 11/10/15 | 10-Nov-2015 15:18:46 |
Lawson 11-1LB Piles |
11-10-15 1300 |
3 6 |
T32S-R6W SEC 11 | Glendale | Main | Douglas | Completed 3ac 11/10/15 | 10-Nov-2015 15:18:52 |
Lawson 11-1LC Piles |
11-10-15 1400 |
6 3 |
T32S-R6W SEC 11 | Glendale | Main | Douglas | Completed 6ac on 11/10/15 | 10-Nov-2015 15:18:58 |
Rockstar TS 2 Piles |
11-10-15 0830 |
37 6.5 |
T33S-R7W SEC 9 | Glendale | Main | Douglas | Completed all 37ac on 11/10/2015. | 10-Nov-2015 15:19:03 |
Rockstar TS 3 Piles |
11-10-15 0930 |
22 9 |
T33S-R7W SEC 9 | Glendale | Main | Douglas | Completed all 22ac on 11/10/2015. | 10-Nov-2015 15:19:08 |
Elk Valley TS Piles |
11-11-15 1000 |
5 50 |
T31S-R9W SEC 27/35 | Glendale | Osipovich | Douglas | Completed all 5ac on 11/11/2015. | 11-Nov-2015 16:22:17 |
Lawson 11-1LD Piles |
11-11-15 0900 |
60 3 |
T32S-R6W SEC 11 | Glendale | Main | Douglas | Completed all 60ac on 11/11/2015. | 11-Nov-2015 16:22:22 |
Lawson 11-2L Piles |
11-11-15 1100 |
68 3 |
T32S-R6W SEC 11 | Glendale | Main | Douglas | Completed all 68ac on 11/11/2015. | 11-Nov-2015 16:22:27 |
Rogue Cow 14-1 A Piles |
11-11-15 1200 |
9 2 |
T32S-R8W SEC 14 | Glendale | Osipovich | Douglas | Completed all 9ac on 11/11/2015. | 11-Nov-2015 16:22:41 |
Rockstar TS 5 Piles |
11-12-15 |
46 9 |
T33S-R7W SEC17 | Glendale | Main | Josephine | Completed all 46ac on 11/12/2015. | 12-Nov-2015 16:27:33 |
Rockstar TS 10 Piles |
1112-15 |
7 7 |
T33S-R7W SEC 21 | Glendale | Main | Josephine | Completed all 7ac on 11/12/2015. | 12-Nov-2015 16:27:39 |
Rockstar TS 6 Piles |
11-12-15 |
59 3 |
T33S-R7W SEC 17 | Glendale | Main | Josephine | Completed all 59ac on 11/12/2015. | 12-Nov-2015 16:27:42 |
Rockstar TS 7 Piles |
11-12/15 |
35 4 |
T33S R7W SEC21 | Glendale | Main | Josephine | Completed all 35ac on 11/12/2015. | 12-Nov-2015 16:27:46 |
Rockstar TS 8 Piles |
11-12-15 |
12 6 |
T33S-R7W SEC 21 | Glendale | Main | Josephine | Completed all 12ac on 11/12/2015. | 12-Nov-2015 16:27:50 |
Rockstar TS 9 Piles |
11-12-15 |
12 6 |
T33S-R7W SEC 21 | Glendale | Main | Josephine | Completed all 12ac on 11/12/2015. | 12-Nov-2015 16:27:54 |
Battle Rattle ROW Piles |
11-15-15 0900 |
40 7 |
T33S-7W- Sec 3 | Glendale | Main | Douglas | 15-Nov-2015 16:35:54 | |
Speaking Coyote 13-1 Piles |
12/2/2015 1200 |
4 20 |
T33S, R5W, Sec. 13 | King Mtn | Main | Josephine | Completed unit on 12/2/15 | 2-Dec-2015 14:50:54 |
Speaking Coyote 23-2 Piles |
12/2/2015 1400 |
14 100 |
T33S, R5W, Sec. 23 | King Mtn. | Main | Josephine | 12-2-15 completed unit for 14 acres | 2-Dec-2015 15:37:43 |
New Hope 1 Piles |
12-04-15 0900 |
90 5 |
T37S R5W 18 | Murphy | Osipovich | Josephine | Completed 60 Ac 11-15-15 Completed 15ac on 12/2/15 12-4-15 for 15 acres | 4-Dec-2015 12:45:17 |
New Hope 2 Piles |
12-04-15 0900 |
115 5 |
T37S R6W 13 | Murphy | Osipovich | Josephine | Completed 65 AC 11-15-15 Completed 25ac on 12/2/15 12-5-15 completed 25 acre | 4-Dec-2015 12:46:04 |
Brimstone 13-6 Piles |
12-04-15 15:00 |
9 1 |
T34S-R7W SEC 13 | Hugo | main | Douglas | 4-Dec-2015 16:52:14 | |
Speaking Coyote 14-1 Piles |
12-05-15 08:00 |
11 11 |
T33S-5W Sec 14 | King MTN | Osipovich | Josephine | 5-Dec-2015 12:05:10 | |
Speaking Coyote 14-2 Piles |
12-05-15 09:00 |
18 8 |
T33S-5W sec 14 | King MTN | Osipovich | Josephine | 5-Dec-2015 12:05:23 | |
Rattlesnake 11-1R Piles |
12-05-15 0800 |
72 8.5 |
T33S-R7W SEC 11 | Glendale | Main | Douglas | 11/17/15 completed 22 acres. | 6-Dec-2015 6:09:17 |
Deer Creek Education Piles |
12/6/2015 1000 |
1 1 |
T38S-R7W-S12 | Selma | Main | Josephine | 6-Dec-2015 17:17:39 | |
French Flat 2 Piles |
12/6/2015 0900 |
5 2.5 |
T40S-R8W-10 | Cave Junction | Main | Josephine | 6-Dec-2015 17:17:59 | |
Rough&Ready 1 Piles |
12-06-15 0800 |
1 20 |
T40S-R8W Sec 7 | Cave Junction | Main | Josephine | 6-Dec-2015 17:19:19 | |
Cheney Slate 5-1 Piles |
12-07-15 0900 |
47 7 |
T37S-R7W Sec 5 | Wonder | Main | Josephine | 12-7-15, completed unit for 47 acres | 7-Dec-2015 11:33:19 |
Cheney Slate 19-10 Piles |
12-07-15 1100 |
10 5 |
T37S-R7W Sec 19 | Wonder | Main | Josephine | 12-7-15 completed unit for 10 acres | 7-Dec-2015 13:32:31 |
Jumping Bean 21S-2 Piles |
12-08-15 1000 |
6 5 |
T35S-R5W Sec 21 | Hugo | Osipovich | Josephine | 12-8-15 completed unit for 6 acres | 8-Dec-2015 10:49:09 |
Jumping Bean 21-13 Piles |
12-08-15 1000 |
11 6 |
T35S-R5W Sec 21 | Hugo | Osipovich | Josephine | 12-8-15 completed unit for 11 acres | 8-Dec-2015 10:49:40 |
Jumping Bean 20-2 Piles |
12-08-15 0930 |
12 7 |
T35S-R5W Sec 20 | Hugo | Osipovich | Josephine | 12-8-15 completed unity for 12 acres | 8-Dec-2015 12:10:34 |
Jumping Bean 21-15 Piles |
12-08-15 1000 |
9 4 |
T35S-5W Sec 21 | Hugo | Osipovich | Josephine | Completed 9ac on 12/8/15 | 8-Dec-2015 12:58:43 |
French Flat 1 Piles |
12/6/2015 0900 |
3 4.5 |
T40S-R8W-S10 | Cave Junction | Main | Josephine | 12-8-15 completed unit fo3 acres | 8-Dec-2015 14:39:19 |
French Flat 2A Piles |
12/6/2015 0900 |
2 1 |
T40S-R8W-S10 | Cave Junction | Main | Josephine | 12-8-15c completed unit for 2 acres | 8-Dec-2015 14:39:32 |
French Flat 3 Piles |
12/6/2015 0900 |
15 1 |
T40S-R8W-S15 | Cave Junction | Main | Josephine | 12-8-15 completed unit for 15 acres | 8-Dec-2015 14:39:52 |
Jumping Bean 15-15A Piles |
12-08-15 0800 |
20 5 |
T35S-R5W Sec 15 | Hugo | Osipovich | Josephine | completed 20 acres 12-8-15 | 8-Dec-2015 16:19:38 |
Jumping Bean 15-15B Piles |
12-08-15 0900 |
9 5 |
T35S-R5W Sec 15 | Hugo | Osipovich | Josephine | 12-8-15 completed 9 acres | 8-Dec-2015 16:19:58 |
East Fork 10-1 Piles |
12/9/2015 0900 |
13 5.5 |
T41S, R8W, Sec. 10 | Takilma | Main | Josephine | 12-9-15 completed unit for 13 acres | 9-Dec-2015 12:23:03 |
Deer Willy 17-1 Piles |
12/9/2014 0800 |
19 7 |
T38S R5W 17 | Powell Creek | Y. Gallimore | Josephine | completed unit for 20ac on 12/9/14. | 9-Feb-2016 12:49:42 |
Deer Willy 17-1A Piles |
2/9/16 0800 |
19 8 |
38-5-17 | Powell Creek | Y. Gallimore | Josephine | Grayback Full Service. 19 Acres completed at 11:30 | 9-Feb-2016 12:50:16 |
Cheney Slate 19-1A Piles |
2/17/16 0900 |
49 7 |
T37S-R7W Sec 19 | Hayes Hill | Gallimore | Josephine | Grayback Full Service. Completed all 49 acres 2/17/16. | 17-Feb-2016 15:31:53 |
Tennessee Lime 34-2 Piles |
2-18-16 08:00 |
34 7.5 |
T38S-R8W SEC 27/34 | Selma | Main | Josephine | Grayback Full Service. Completed 34 acres 2/18/16. | 18-Feb-2016 15:54:08 |
Tennessee Lime 3-1A Piles |
2-18-16 1200 |
37 7 |
T39S-R8W SEC 3 | Cave Junction | Main | Josephine | Grayback Full Service. 37 acres completed 2/18/16. | 18-Feb-2016 16:04:34 |
Roberts Mountain 1 Piles |
2/24/16 10:00 |
29 11 |
T34S-R5W SEC 28/33 | Hugo | Gallimore | Josephine | Grayback Full Service. Completed Unit 1 for 29 acres 2/24/16. | 24-Feb-2016 15:00:10 |
Burnt Rattler/Wolf Pup 15 Piles |
10/13/2016 0800 |
95 Acres 3.6 per Ac |
T33S 7W Sec 15 | Glendale | Trevor Wallace | Douglas | 344 Tons Total. 10-13-16 completed unit for 95 acres | 13-Oct-2016 16:57:38 |
Regor 1 & 2 Piles |
10/13/16 1200 |
70 3.1 |
T33S R8W Sec 12 | Sawmill Gap | Trevor Wallace | Josephine | completed 70 acres 10-13-16, 220 tons total | 13-Oct-2016 16:58:07 |
French Flat 7 Piles |
10/20/2016 0900 |
24 2.6 |
T40S R8W Sec 15 | Illinois Valley: Rockydale Road | Main/Wallace | Josephine | Unit is 24 Acres, 63 tons total | 20-Oct-2016 16:11:13 |
Galice Road SFP Piles |
10/21/2016 0800 |
1 1 |
T35S R7W Sec 14 | Galice Road | Wallace/Main | Josephine | 1 acre of handpiles; completed 10/21/16 | 21-Oct-2016 17:05:11 |
Phantom 21-1 Piles |
10/25/2016 0730 |
10 6 |
T35S R5W 21 | North of GP | Main / Wallace | Josephine | 10ac total | 25-Oct-2016 15:48:23 |
Lawson 1-1LA Piles |
10-27-16 0730 |
64 7 |
T32S-R6W Sec 1 | Glendale | Main | Douglas | 10-27-16:completed unit for 64 acres | 27-Oct-2016 16:55:47 |
Lawson 1-1LB Piles |
10/28/2016 0730 |
27 5 |
T32S-R6W SEC 1 | Glendale | Main | Douglas | Completed all 27ac 10/28/2016 | 28-Oct-2016 15:30:52 |
Eastside 1-1B Piles |
11/01/2016 0800 |
82 5.8 |
T32S R5W Sec 1 | Glendale | Pete Osipovich | Josephine | 62 Acres accomplished on 10/28/2016. 11-1-16 completed 20 acres. | 1-Nov-2016 11:22:57 |
Tennesee Lime 34-1 Piles |
11/01/2016 0800 |
73 3.1 |
T38S R8W Sec 27/34/35 | Kerby | Wallace | Josephine | Completed 80 of the 153 total acres 10/31/16. 11-1-16completed 73 acres | 1-Nov-2016 15:14:59 |
Tennessee Lime 17-5 Piles |
11/2/16 0800 |
56 5 |
T39S-R8W SEC 17 | Cave Junction | Wallace | Josephine | Unit Completed 11/2/2016 | 2-Nov-2016 15:53:18 |
Tennessee Lime 3-1B Piles |
11/3/2016 1000 |
22 4.9 |
T39S R8W Sec 3 | Illinois Valley | Wallace | Josephine | Completed all 22ac 11/3/2016 | 3-Nov-2016 13:31:27 |
Jumping Bean TS 23-4 Piles |
11/3/2016 0800 |
7 5.7 |
35S R5W Sec 23 | Hugo | Main | Josephine | Completed all 7ac 11/3/2016 | 3-Nov-2016 16:48:16 |
Jumping Bean TS 25-17 Piles |
11/3/2016 0800 |
7 1.1 |
T35S R5W Sec 25 | Hugo | Main | Josephine | Completed all 7ac 11/3/2016 | 3-Nov-2016 16:48:26 |
Jumping Bean TS 4-3 Piles |
11/3/2016 0800 |
5 6 |
T35S R5W Sec 4 | Hugo | Main | Josephine | Completed all 5ac 11/3/2016 | 3-Nov-2016 16:48:32 |
Jumping Bean TS 4-4 Piles |
11/3/2016 0800 |
13 8.6 |
T35S R5W Sec 4 | Hugo | Main | Josephine | Completed all 13ac 11/3/2016 | 3-Nov-2016 16:48:42 |
Jumping Bean TS 8-2 Piles |
11/3/2016 0800 |
6 6 |
T35S R5W Sec 8 | Hugo | Main | Josephine | Completed all 6ac 11/3/2016 | 3-Nov-2016 16:48:47 |
Jumping Bean TS 9-14 Piles |
11/3/2016 0800 |
9 5.9 |
T35S R5W Sec 9 | Hugo | Main | Josephine | Completed all 9ac 11/3/2016 | 3-Nov-2016 16:48:56 |
Jumping Bean TS 9-15 Piles |
11/3/2016 0800 |
12 5.8 |
T35S R5W Sec 9 | Hugo | Main | Josephine | Completed all 12ac 11/3/2016 | 3-Nov-2016 16:49:02 |
Jumping Bean TS 9-2 Piles |
11/3/2016 0800 |
13 4.4 |
T35S R5W Sec 9 | Hugo | Main | Josephine | Completed all 13ac 11/3/2016 | 3-Nov-2016 16:49:10 |
Indian Hill Piles |
11/11/2016 1100 |
14 5 |
T40S R8W Sec 17 | Illinois Valley | Wallace | Josephine | Completed 11/11/2016 | 13-Nov-2016 8:24:20 |
Deer Willy 19-5 Piles |
11/14/2016 0800 |
81 8.2 |
T38S R5W Sec 19 | Williams | Wallace | Josephine | Completed 18ac 02/2016; completed 20ac 11/2/2016. Unit Complete: 11/14/2016 | 14-Nov-2016 16:44:59 |
London Peak 27-1 TS Piles |
11/14/2016 1200 |
18 8 |
T33S, R8W, Sec 27 | Wolf Creek | Main | Josephine | 12-11-15:burned 12 acres of landing piles Unit Complete 11/14/2016 | 14-Nov-2016 16:45:20 |
London Peak 27-2 TS Piles |
11/14/2016 1200 |
7 4 |
T33S, R6W, Sec. 27 | Wolf Creek | Main | Josephine | 12-11-15:completd 5 acres of landing piles Unit Completed: 11/14/2016 | 14-Nov-2016 16:45:43 |
London Peak 27-3 TS Piles |
11/14/2016 1200 |
27 8 |
T33S, R6W, Sec. 27 | Wolf Creek | Main | Josephine | 12-11-15: completed 20 acres of landing piles Unit Completed: 11/14/2016 | 14-Nov-2016 16:45:53 |
London Peak 27-4 TS Piles |
11/14/2016 1200 |
42 9.5 |
T33S, R6W, Sec. 27 | Wolf Creek | Main | Josephine | 12-11-15: completed 30 acres of landing piles. Unit Completed: 11/14/2016 | 14-Nov-2016 16:46:05 |
Speaking Coyote 15-5 Piles |
11/14/2016 0800 |
5 3 |
T33S R5W Sec 15 | Wolf Creek | Main | Josephine | Unit Completed: 11/14/2016 | 14-Nov-2016 16:46:19 |
Speaking Coyote 20-2 Piles |
11/14/2016 0800 |
7 2 |
T33S R5W Sec 20 | Wolf Creek | Main | Josephine | Unit Completed: 11/14/2016 | 14-Nov-2016 16:46:27 |
Speaking Coyote 21-2 Piles |
11/14/2016 1000 |
26 5 |
T33S R5W Sec 21 | Coyote Creek | Main | Josephine | Unit Completed: 11/14/2016 | 14-Nov-2016 16:46:36 |
Speaking Coyote 22-1 TS Piles |
11/14/16 1000 |
1 10 |
T33S, R5W, Sec. 22 | King Mtn | Main | Josephine | 12-05-15 Handpiles Unit Completed: 11/14/2016 | 14-Nov-2016 16:46:46 |
Speaking Coyote 23-3 TS Piles |
114/14/2016 1000 |
17 4 |
T33S, R5W, Sec. 23 | King Mtn | Main | Josephine | Unit Completed: 11/14/2016 | 14-Nov-2016 16:47 |
Speaking Coyote 23-4 TS Piles |
11/14/2016 1000 |
3 6 |
T33S, R5W, Sec. 23 | King Mtn | Main | Josephine | Unit Completed: 11/14/2016 | 14-Nov-2016 16:47:07 |
Speaking Coyote 23-5 Piles |
11/14/2016 1000 |
27 2 |
T33S R5W sec 23 | Coyote Creek | Main | Josephine | Unit Completed: 11/14/2016 | 14-Nov-2016 16:47:23 |
Speaking Coyote 24-1 Piles |
11/14/2016 0800 |
16 1 |
T33S R5W Sec 24 | Coyote Creek | Main | Josephine | Unit Completed: 11/14/2016 | 14-Nov-2016 16:47:30 |
Speaking Coyote 25-2 Piles |
11/14/2016 1000 |
14 1 |
T33S R5W Sec 25 | Coyote Creek | Main | Josephine | Unit Completed: 11/14/2016 | 14-Nov-2016 16:47:38 |
Speaking Coyote 27-2 Piles |
11/14/2016 1000 |
5 1.4 |
T33S R5W Sec 27 | Coyote Creek | Main | Josephine | Unit Completed: 11/14/2016 | 14-Nov-2016 16:47:45 |
Speaking Coyote 34-4-5 Piles |
11/14/2016 0800 |
4 11 |
T33S R4W Sec 31 | East of Wolf Creek | Main | Josephine | Unit Completed: 11/14/2016 | 14-Nov-2016 16:47:53 |
Speaking Coyote 34-5-26/33 Piles |
11/14/2016 1000 |
2 3 |
T33S R5W Sec 24 | Wolf Creek | Main | Josephine | Unit Completed: 11/14/2016 | 14-Nov-2016 16:48:02 |
Waldo Cemetery Piles |
12-6-2015 1100 |
1 2 |
T40S-R8W-S28 | Selma | Main | Josephine | 14-Nov-2016 16:48:28 | |
Rattlesnake 6-1R Piles |
10/27/2016 0730 |
41 5.5 |
T 33S R6W Sec 6/7 | Glendale | Wallace | Douglas | 41 Acres, 226 tons total. 10/27/16 all 41 acres completed. | 14-Nov-2016 16:48:49 |
Williams 12-1 Piles |
11/15/2016 08:00 |
30 13.2 |
T39S R5W Sec 1/12 | Williams | Wallace | Josephine | Completed all 30ac 11/15/16 | 15-Nov-2016 16:15:44 |
Williams 3-8 Piles |
11/16/2016 0800 |
42 4.8 |
T38S R5W Sec 3 | Williams | Wallace | Josephine | Completed all 42ac 11/16/2016 | 16-Nov-2016 16:46:56 |
Williams 3-6B Piles |
11-28-2016 0900 |
26 175 |
T38s R5W 3 | Williams | Mike Main | Josephine | All acres accomplished: 11/28/2016 | 29-Nov-2016 6:46:46 |
Tennessee Lime 1-3 Piles |
11/29/2016 0800 |
33 7.6 |
T39S R8W Sec 1 | Illinois Valley | Wallace | Josephine | Too Dry: 11/3/2016. 11-29-16 completed unit for 33 acres | 29-Nov-2016 16:02:26 |
Williams 1-11 Piles |
12/6/2016 0800 |
84 8.4 |
T39S R5W Sec 1 | Williams | Wallace | Josephine | Completed 15ac 11/15/16. completed 69 acres and unit | 6-Dec-2016 13:48:31 |
Williams 1-11C Piles |
12/6/2016 1300 |
19 5.2 |
T39S R5W Sec 1 | Williams | Wallace | Josephine | 12-6-16 completed 19 acres | 6-Dec-2016 13:48:57 |
Cheney Slate 7-1 Piles |
12/7/2016 0730 |
115 5.7 |
T37S R6W Sec 7 | Wilderville | Wallace | Josephine | 40 Acres Burned on 11/18/2016 40 Acres burned on 11/30/2016 20 acres burned on 12-2-16. 15 acres burned on 12-7-16 | 8-Dec-2016 12:20:49 |
Williams 1-11A Piles |
12/9/2016 0800 |
39 8.2 |
T39S R5W Sec 1 | Williams | Main | Josephine | 12-9-16 completed unit for 39 acres | 9-Dec-2016 16:07:45 |
Eastside 1-1A Piles |
11/10/2017 1200 |
31 219 |
T32S R5W Sec 1 | Glendale | Main | Josephine | 10-Nov-2017 14:32:11 | |
Tennessee Lime 1-4 Piles |
11/11/2017 0800 |
33 178 |
T39S R8W S1 | Cave Junction | Main | Josephine | 11-11-17: Completed unit for total acres 33. | 11-Nov-2017 14:07:45 |
Tennessee Lime 3-1 Piles |
11/112017 1200 |
89 438 |
T39S R8W Sec 3 | Cave Junction | Main | Josephine | Completed unit for total of 89 acres | 11-Nov-2017 14:10:57 |
Jumping Bean 31-1B Piles |
11/13/2017 1430 |
31 2.5 |
34-5-31 | Cherry Creek | Main | Josephine | 13-Nov-2017 15:34:36 | |
Jumping Bean TS 1-2 Piles |
11/13/2017 1330 |
19 3 |
35-6-1 | Red Mountain | Main | Josephine | 13-Nov-2017 15:34:50 | |
Jumping Bean TS 15-13 Piles |
11/13/2017 0930 |
8 3 |
35-5-15 | Morris Creek | Main | Josephine | 13-Nov-2017 15:35:02 | |
Jumping Bean TS 21-10 Piles |
11/13/2017 0830 |
8 3 |
35-5-21 | Morris Creek | Main | Josephine | 13-Nov-2017 15:35:16 | |
Jumping Bean TS 29-11 Piles |
11/13/2017 1130 |
11 2.5 |
34-5-29 | Jack Creek | Main | Josephine | 13-Nov-2017 15:35:28 | |
Jumping Bean TS 21-11 Piles |
11/13/2017 0730 |
11 6 |
35-5-21 | Morris Creek | Main | Josephine | 13-Nov-2017 15:39:42 | |
Jumping Bean TS 31-1A Piles |
11/13/2017 1330 |
5 3 |
34-5-31 | Red Mountain | Main | Josephine | 13-Nov-2017 15:40:01 | |
Jumping Bean TS 33-10 Piles |
11/13/2017 0930 |
17 3 |
35-5-33 | Granite Hill | Main | Josephine | 13-Nov-2017 15:40:12 | |
Jumping Bean TS 33-10A Piles |
11/13/2017 1000 |
3 2 |
35-5-33 | Granite Hill | Main | Josephine | 13-Nov-2017 15:40:22 | |
Jumping Bean TS Cove Creek Piles |
11/13/2017 1400 |
1 1 |
34-5-9 | Cove Creek | Main | Josephine | 13-Nov-2017 15:40:34 | |
Pickett Creek Roadside Piles |
11/16/2017 0800 |
10 10 |
T35S R7W Sec 29 | Pickett Creek | Wallace | Josephine | 17-Nov-2017 6:17 | |
Snow Creek 1 Piles |
11/17/2017 1000 |
10 12 |
32-3-19 | Snow Creek | Main | Josephine | 8 acres accomplished on 11/14/17 2 acres accomplished on 11/17/2017 | 17-Nov-2017 15:25:20 |
Williams 3-3 Piles |
11/20/17 0800 |
65 5.8 |
T38S R5W Sec 3 | Williams | Main | Josephine | 62 acres completed 11/16/2017 3 acres completed 11/20/2017 | 20-Nov-2017 15:09:44 |
Williams 9-7 Piles |
11/21/2017 0830 |
25 3.3 |
T39S R5W Sec 9 | Williams | Main | Josephine | 11-21-17: burned 25acres | 21-Nov-2017 16:58:31 |
Williams 9-9 Piles |
11/21/17 0830 |
67 5.1 |
T39S R5W Sec 9 | Williams | Main | Josephine | 11-15-17: burned 26 acres 11-21-17: burned 41 acres | 21-Nov-2017 17:14:03 |
Flanagan Slough Piles |
11/28/2017 1300 |
1 5 |
T36S R7W Sec 3 | Riverbanks Road | Wallace | Josephine | 2 roadside piles Completed 11/28/2017 | 28-Nov-2017 15:54 |
Williams 9-10 Piles |
11/28/17 0800 |
97 5.4 |
T39S R5W Sec 9 | Williams | Main | Josephine | 11-21-17:burned 11 acres 11/22/2017 burned 45 acres 11-28-17: burned 39 acres. Unit completed | 28-Nov-2017 16:02:50 |
Speaking Coyote 17-2 Piles |
11/29/2017 1100 |
25 7 |
T33S R5W Sec 17 | Wolf Creek | Wallace | Josephine | Completed 11/29/2017 | 29-Nov-2017 15:55:37 |
Speaking Coyote 21-1 Piles |
12/1/2017 1000 |
37 1 |
T33S R5W Sec 21 | King Mtn | Wallace | Josephine | 12-1-17 completed unit for 37 acres. | 1-Dec-2017 12:00:23 |
Snow Creek 2 Piles |
12/1/2017 1200 |
1 12 |
32-3-19 | Snow Creek | Main | Josephine | 12-1-17 completed unit for 1 acre | 1-Dec-2017 15:31:04 |
Snow Creek 3 Piles |
12/1/2017 1200 |
1 16 |
32-3-19 | Snow Creek | Main | Josephine | 12-1-17 completed unit for 1 acres | 1-Dec-2017 15:31:30 |
East West 13-14 Piles |
12/2/2017 0800 |
44 3.7 |
39-8-13 | Cave Junction | M.Main | Josephine | 2-Dec-2017 14:56:31 | |
Tennessee Lime 1-1 Piles |
12/08/2017 1000 |
8 10 |
T39S R8W Sec 1 | East of Kerby | Main | Josephine | 7 Acres completed on 12/7/2017. 12-8-17 completed unit for 1 acre | 8-Dec-2017 13:02:16 |
Williams 12-8 Piles |
1/12/2018 0800 |
22 8.4 |
T39S R5W Sec 12 | Williams | Wallace | Josephine | 11-28-17; burned 10 acres. Completed 1/12/18 | 12-Jan-2018 15:43:45 |
Williams 3-4 Piles |
1/16/18 0900 |
57 7.8 |
T38S R5W Sec 3 | Williams | Osipovich | Josephine | 39 acres completed on 11/20/2017 Completed remaining 18 ac. On 1/16/18 | 16-Jan-2018 20:15:20 |
Cheney Slate TS 14-3 Piles |
1-31-18 0830 |
25 4.3 |
T37S R7W Sec 14 | South Grants Pass | Osipovich | Josephine | 1-Feb-2018 6:53:25 | |
Cathedral Hills Piles |
02/21/2018 0800 |
1 1 |
36s-5w-31 | Grants Pass | Osipovich | Josephine | 20-Feb-2018 15:52:04 | |
Cathedral Hills SFP Piles |
02/21/2018 0800 |
1 1 |
36s-5w-31 | Grants Pass | Osipovich | Josephine | 22-Feb-2018 8:41:05 | |
Rogue River Ranch Piles |
04/26/2018 0900 |
1 1 |
T33S R10W Sec 9 | Rogue River Ranch | Keen | Josephine | 1 Pile at the Rogue River Ranch | 27-Apr-2018 8:08:29 |
Eastside 25-1B Piles |
11/28/2018 0800 |
46 8.1 |
T32S R4W Sec 30 | Glendale | Osipovich | Douglas | 11-1-16 burned 20 acres Completed on 11/28/2018 | 29-Nov-2018 16:03:42 |
Williams 22-2 Piles |
11/29/2018 |
11 9.5 |
T39S-R5W-Sec 22 | Williams | Osipovich | Josephine | Completed on 11/29/2018 | 29-Nov-2018 16:04:14 |
Williams 22-6 Piles |
11/29/2018 |
23 5 |
T39S-R5W-Sec 22 | Osipovich | Josephine | Completed on 11/29/2018 | 29-Nov-2018 16:06:21 | |
Williams 22-1 Piles |
11/29/2018 |
42 8.3 |
T39S-R5W-Sec 22 | Josephine | 11/30 Completed 42 Ac | 30-Nov-2018 15:48:42 | ||
Williams 22-3 Piles |
11/29/2018 |
34 11.3 |
T39S-R5W-Sec 22 | Williams | Josephine | 11/30 Completed 34 AC | 30-Nov-2018 15:49:03 | |
Snow Creek 7 Piles |
12-13-18 0900 |
4 14.5 |
32-3-19 | Snow Creek | Osipovich | Josephine | Completed 12/13 for 4 ac. | 13-Dec-2018 15:21:12 |
Snow Creek 6 Piles |
12-13-18 0900 |
1 15 |
32-3-19 | Snow Creek | Osipovich | Josephine | Completed 12/13 for 1 ac. | 13-Dec-2018 15:21:33 |
Snow Creek 8 Piles |
12-13-18 0800 |
2 13 |
32-3-17 | Snow Creek | Osipovich | Josephine | Completed 12/13 2ac. | 13-Dec-2018 17:21:36 |
East West 13-3A Piles |
02/02/2019 0800 |
46 5.2 |
39-8-13 | Cave Junction | Osipovich | Josephine | Crawford RXB3(T) | 2-Feb-2019 14:55:14 |
Williams 9-6 Piles |
2/8/19 0800 |
28 6 |
T39S R5W Sec 9 | South of Williams | Osipovich | Josephine | Fukuda RXB3 T | 8-Feb-2019 16:51:10 |
Pilot Thompson Underburn |
|
|
Josephine | oops, mistake | 28-Apr-2019 11:30:14 | |||
Jumping Bean 21N-2 Underburn |
05/02/2019 1000 |
95 6.7 |
T34S R5W Sec 21 | Hugo | Wallace | Josephine | Completed 45 acres 5/1 | 3-May-2019 7:12:24 |
Provolt Seed Orchard 1 Piles |
5/29/2019 1100 |
0 0 |
T38s R4w Sec 6 SWSW | Provolt | BC 71 | Josephine | Lighting 1 small pile. Completed | 30-May-2019 8:04:18 |
Rand Ranger Station 1 Piles |
5/29/2019 1100 |
0 0 |
T34s R8w Sec24 SESE | Josephine County | BC 71 | Josephine | Lighting one small pile. Completed | 30-May-2019 8:04:39 |
Williams 11-3 Piles |
12/02/19 1100 |
8 3.75 |
T39S R5W Sec 11 | Williams | Wallace | Josephine | 8ac completed 12/02/19 | 2-Dec-2019 16:53:37 |
Williams 11-2c Piles |
12/03/19 1100 |
8 4.5 |
T39S R5W Sec 11 | Williams | Wallace | Josephine | 12/3 Completed 8 Ac | 4-Dec-2019 8:35:34 |
Dads Piles |
11-21-14 1530 |
1 20 |
T32S, R7W, sec 15 | West of Grayback | Gallimore | Douglas | 1 acre unit completed 11/21/14 | 6-Dec-2019 8:28:26 |
Skull Creek Campground Piles |
12/6/2019 1200 |
3 17 |
T32 R7W Sec19 | Glendale | Wallace | Josephine | 12/6: Completed Unit 3 Ac | 6-Dec-2019 16:33:37 |
Spencer Creek Hazard Piles |
12/09/2019 1000 |
33 1 |
T38S R6W Sec 23 | Wallace | Josephine | Unit complete 12/9/19 | 9-Dec-2019 15:51:04 | |
East West 13-3C Piles |
12/10/2019 0800 |
72 5.6 |
39-8-13 | Cave Junction | Osipovich | Josephine | 10-Dec-2019 15:56:31 | |
Snow Creek 4 Piles |
2-2-18 0900 |
2 13 |
32-3-19 | Snow Creek | Wallace | Josephine | 10-Dec-2019 16:29:52 | |
Snow Creek 5 Piles |
2-2-18 0900 |
1 14 |
32-3-19 | Snow Creek | Wallace | Josephine | 10-Dec-2019 16:30:06 | |
Williams 15-3 Piles |
12/12/2019 1200 |
18 5.7 |
T39S R5W Sec 15 | South of Williams | Wallace | Josephine | unit completed 12/12/19. | 12-Dec-2019 16:57:50 |
Jumping Bean 15-22 Piles |
12/12/19 0800 |
104 7.4 |
T34S-R5W Sec 15 | Hugo | Osipovich | Josephine | 12-Dec-2019 17:51:26 | |
Jumping Bean 21-3 Piles |
12/17/2019 0800 |
33 7.4 |
T34S-R5W Sec 21 | Hugo | Wallace | Josephine | 17-Dec-2019 15:57:28 | |
Jumping Bean 33-10B Piles |
12/18/2019 0800 |
45 7.4 |
T35S-R5W Sec 33 | Hugo | Osipovich | Josephine | 18-Dec-2019 15:22:54 | |
Wee Willy TS 12 a,b Piles |
01-08-2020 1100 |
34 4.3 |
T39s R5w Sec 12 | Williams | Osipovich | Josephine | 12/3: completed 5 Ac | 8-Jan-2020 17:34:29 |
Williams 14-5 Piles |
1/9/20 0800 |
110 9 |
T39S R5W Sec 14 | South of Williams | Wallace | Josephine | Completed 40 ac on 2-8-19 Completed 30 ac on 12/11/19 | 9-Jan-2020 18:05:11 |
French Flat 10 Piles |
01-10-2020 0900 |
10 5.7 |
T40S-R8W-22 | Cave Junction | Osipovich | Josephine | 10-Jan-2020 18:09:45 | |
French Flat 5a Piles |
01-10-2020 0900 |
8 5.7 |
T40S-R8W-15 | Cave Junction | Osipovich | Josephine | 10-Jan-2020 18:09:54 | |
French Flat 9b Piles |
01-10-2020 0900 |
2 5.7 |
T40S-R8W-15 | Cave Junction | Osipovich | Josephine | 10-Jan-2020 18:10:07 | |
French Flat 5c Piles |
01-10-2020 0900 |
4 5.7 |
T40S-R8W-15 | Cave Junction | Osipovich | Josephine | 10-Jan-2020 18:10:15 | |
Cheney Slate 13-1 Piles |
1/13/2020 1000 |
45 6.6 |
T37S R7W Sec 13 | Wilderville | Wallace | Josephine | Completed 11/17/2016 SFP area (5 Acres)on 1/13/2020 | 14-Jan-2020 9:31:26 |
Williams 3-6A Piles |
11/16/16 11:30 |
42 6 |
T38S R5W Sec3 | Williams | Wallace | Josephine | Completed all 42ac on 11/16/2016 | 16-Mar-2020 10:55:54 |
Upper Cow TS 23-6 Piles |
01-19-21 1100 |
1 7 |
31-4-23 | Galesville Reservoir | Osipovich | Josephine | Completed LP .5 AC 12/13/19 Completed HP .5 AC 01-19-21 | 19-Jan-2021 17:50:25 |
Upper Cow TS 25-12 Piles |
01-19-21 1100 |
5 2.8 |
32-4-25 | Galesville Reservoir | Osipovich | Josephine | Completed LP 3 AC 12/13/19 Completed HP 9 AC 01/19/21 | 19-Jan-2021 17:53:35 |
Upper Cow TS 25-7 Piles |
01-19-21 1100 |
5 3 |
31-4-25 | Galesville Reservoir | Osipovich | Josephine | Completed LP 2 AC 12/13/19 Completed HP 3 AC 01/19/21 | 19-Jan-2021 17:54:36 |
Upper Cow TS 26-3 Piles |
01-19-21 1100 |
1 6.5 |
31-4-26 | Galesville Reservoir | Osipovich | Josephine | Completed HP on 01/19/21 | 19-Jan-2021 17:57:28 |
Upper Cow TS 24-3 Piles |
01-21-21 1100 |
1 2.6 |
31-4-24 | Galesville Reservoir | Osipovich | Josephine | 21-Jan-2021 14:05:46 | |
Upper Cow TS 27-12 Piles |
01-21-21 1100 |
9 6 |
31-4-27 | Galesville Reservoir | Osipovich | Josephine | Completed LP 3 AC 12/13/19 Completed HP 1-21-21 | 21-Jan-2021 14:06:18 |
Upper Cow TS 23-1 Piles |
01-21-21 1100 |
15 2 |
32-4-23 | Galesville Reservoir | Osipovich | Josephine | Completed LP 3 AC 12/13/19 Completed HP 1-21-21 | 21-Jan-2021 14:06:45 |
Upper Cow TS 23-2 Piles |
01-21-21 1100 |
6 2.9 |
31-4-23 | Galesville Reservoir | Osipovich | Josephine | Completed LP 2 AC 12/13/19 Completed HP 1-21-21 | 21-Jan-2021 14:07:13 |
Upper Cow TS 23-2B Piles |
01-22-21 1100 |
5 6 |
31S 4W Sec 23 | Galesville Reservoir | Osipovich | Douglas | Completed LP 2 AC 12/13/19 Completed HP 01-22-21 | 22-Jan-2021 10:13:40 |
Upper Cow TS 23-3N Piles |
01-22-21 1100 |
14 2 |
31S 4W Sec 23 | Galesville Reservoir | Osipovich | Douglas | Completed LP 4 AC 12/13/19 Completed HP 01-22-21 | 22-Jan-2021 10:14:03 |
Upper Cow TS 31-2 Piles |
01-22-21 1100 |
4 4 |
31S 4W Sec 31 | Galesville Reservoir | Osipovich | Douglas | Completed HP/LP on 01-22-21 | 22-Jan-2021 12:49:49 |
Upper Cow TS 31-3 Piles |
01-22-21 1100 |
8 4 |
31S 4W Sec 31 | Galesville Reservoir | Osipovich | Douglas | Completed HP/LP 01-22-21 | 22-Jan-2021 12:50:24 |
Upper Cow TS 30-2 Piles |
01-22-21 1100 |
2 5 |
31S 4W Sec 30 | Galesville Reservoir | Osipovich | Douglas | Completed HP/LP 01-22-21 | 22-Jan-2021 12:50:58 |
Upper Cow TS 32-4 Piles |
01-22-21 1000 |
7 3 |
31S 4W Sec 32 | Galesville Reservoir | Osipovich | Douglas | Completed HP/LP 1-22-21 | 22-Jan-2021 14:22:43 |
Upper Cow TS 32-7S Piles |
01-22-21 1000 |
2 9 |
31S 4W Sec 32 | Galesville Reservoir | Osipovich | Douglas | Completed HP/LP 1-22-21 | 22-Jan-2021 14:23:10 |
Upper Cow TS 32-7 Piles |
01-22-21 1000 |
1 3 |
31S 4W Sec 32 | Galesville Reservoir | Osipovich | Douglas | Completed HP/LP 1-22-21 | 22-Jan-2021 14:23:36 |
Upper Cow TS 1-1C Piles |
01-23-21 1330 |
1 5 |
32S 5W Sec 1 | Galesville Reservoir | Osipovich | Douglas | 1 LP | 23-Jan-2021 17:22:13 |
Upper Cow TS 5-4 Piles |
01-23-21 1000 |
31 4 |
32S 4W Sec 5 | Galesville Reservoir | Osipovich | Douglas | Completed 11 AC HP/LP 1-22-21 Completed 20AC HP 1-23-21 | 23-Jan-2021 17:22:55 |
Upper Cow TS 1-1 Piles |
02-10-21 0800 |
39 5 |
32S 5W Sec 1 | Galesville Reservoir | Osipovich | Douglas | Completed all HP/LP | 10-Feb-2021 18:12:55 |
Upper Cow TS 1-1B Piles |
02-10-21 0800 |
20 4 |
32S 5W Sec 1 | Galesville Reservoir | Osipovich | Douglas | Completed 19 AC Handpiles, 6 LP Remain, Completed Remaining LP | 10-Feb-2021 18:13:44 |
Upper Cow TS 21-2 Piles |
02-10-21 1300 |
7 10 |
31S 4W Sec 21 | Galesville Reservoir | Osipovich | Douglas | Completed All LP/HP | 10-Feb-2021 18:15:15 |
Upper Cow TS 26-1 Piles |
02-10-21 1400 |
22 7 |
31S 4W Sec 26 | Galesville Reservoir | Osipovich | Douglas | Completed all LP/MP | 10-Feb-2021 18:15:52 |
Upper Cow TS 35-1F Piles |
02-10-21 1300 |
3 3 |
31S 4W Sec 35 | Galesville Reservoir | Osipovich | Douglas | Completed all HP/LP | 10-Feb-2021 18:17:34 |
Upper Cow TS 14-3 Piles |
02-11-21 1145 |
4 4 |
32S 4W Sec 14 | Galesville Reservoir | Osipovich | Douglas | 11-Feb-2021 15:02:11 | |
Upper Cow TS 3-1 Piles |
02-11-21 1145 |
2 4 |
32S 4W Sec 3 | Galesville Reservoir | Osipovich | Douglas | Completed all HP/LP | 11-Feb-2021 15:02:41 |
Upper Cow TS 31-6 Piles |
02-11-21 0830 |
15 8 |
31S 4W Sec 31 | Galesville Reservoir | Osipovich | Douglas | Completed all HP/LP | 11-Feb-2021 15:03:07 |
Upper Cow TS 34-1 Piles |
02-11-21 1300 |
2 4 |
31S 4W Sec 34 | Galesville Reservoir | Osipovich | Douglas | Completed all HP/LP | 11-Feb-2021 15:04:01 |
Upper Cow TS 9-1 Piles |
02-11-21 1100 |
5 4 |
32S 4W Sec 9 | Galesville Reservoir | Osipovich | Douglas | Completed all HP/LP | 11-Feb-2021 15:04:31 |
Upper Cow TS 9-26 Piles |
02-11-21 1100 |
3 5 |
32S 4W Sec 9 | Galesville Reservoir | Osipovich | Douglas | Completed all HP/LP | 11-Feb-2021 15:04:54 |
Upper Cow TS 11-25 Piles |
02-11-21 1100 |
5 2.6 |
32S 4W Sec 11 | Galesville Reservoir | Osipovich | Douglas | Completed HP, LP Burned | 11-Feb-2021 15:06:19 |
Jumping Bean 35-23 Piles |
2/12/2021 1000 |
24 7.5 |
T35S-R5W Sec 35 | Merlin | Osipovich | Josephine | 13-Feb-2021 8:21:10 | |
Jumping Bean 25-7 Piles |
2/12/2021 1400 |
42 7.4 |
T35S-R5W Sec 25 | Merlin | Osipovich | Josephine | 13-Feb-2021 8:21:36 | |
Williams 1-11B Piles |
2/16/21 0900 |
12 6 |
T39S R5W Sec 1 | Williams | Osipovich | Josephine | Completed on 2/16 | 16-Feb-2021 17:40:11 |
Williams 15-1 Piles |
2/4/21 1100 |
28 5.2 |
T39S R5W Sec 15 | South of Williams | Osipovich | Josephine | Completed on 2/16 | 16-Feb-2021 17:40:31 |
Williams 15-5 Piles |
2/17/21 0830 |
40 5.7 |
T39S R5W Sec 15 | South of Williams | Osipovich | Josephine | 10 Acres completed on 2/16. Unit complete 2/17 | 17-Feb-2021 16:44:20 |
Jumping Bean 33-6 Piles |
2/18/2021 1000 |
48 7.5 |
T35S-R5W Sec 33 | Merlin | Osipovich | Josephine | 18-Feb-2021 17:20:36 | |
Upper Cow TS 1-2 Piles |
11-03-21 1000 |
3 4 |
32S 4W Sec 1 | Galesville Reservoir | Osipovich | Douglas | LP remaining on temp spur completed 11/3/21 | 3-Nov-2021 15:17:10 |
Upper Cow TS 19-3 Piles |
11-03-21 1200 |
20 2 |
31S-3W Sec19 | Galesville Reservoir | Osipovich | Douglas | 3-Nov-2021 15:17:45 | |
Upper Cow TS 19-9 Piles |
11-03-21 0900 |
13 9.5 |
31S-3W Sec19 | Galesville Reservoir | Osipovich | Douglas | 3-Nov-2021 15:18:10 | |
Upper Cow TS 19-4 Piles |
11-03-21 0900 |
3 7 |
31S-3W Sec19 | Galesville Reservoir | Osipovich | Douglas | 3-Nov-2021 15:18:36 | |
Upper Cow TS 33-4 Piles |
11-03-21 1100 |
3 4 |
31S 4W Sec 33 | Galesville Reservoir | Crawford | Douglas | Eagle Restriction Jan-Jun | 3-Nov-2021 15:18:59 |
Upper Cow TS 13-37 Piles |
11-03-21 1100 |
23 4 |
32S 4W Sec 13 | Galesville Reservoir | Osipovich | Douglas | 3-Nov-2021 15:19:12 | |
Upper Cow TS 13-4 Piles |
11-03-21 1100 |
4 4.5 |
32S 4W Sec 13 | Galesville Reservoir | Osipovich | Douglas | 3-Nov-2021 15:19:23 | |
Upper Cow TS 11-1 Piles |
11-04-21 1000 |
16 2 |
32S 4W Sec 11 | Galesville Reservoir | Crawford | Douglas | 4-Nov-2021 16:14:52 | |
Upper Cow TS 11-26 Piles |
11-04-21 1145 |
20 6.75 |
32S 4W Sec 11 | Galesville Reservoir | Crawford | Douglas | Completed 2ac HP next to 14-3 Completed Unit 11/4/21 | 4-Nov-2021 16:15:41 |
Upper Cow TS 24-1 Piles |
11-04-21 1030 |
69 1 |
31-4-24 | Galesville Reservoir | Osipovich | Douglas | Burned 4 LP adjacent to 23-1 12/13/19 Completed 60AC HP 5AC Remain recently logged Completed all 11/4/21 | 4-Nov-2021 16:16:40 |
Upper Cow TS 25-1B Piles |
11-04-21 1100 |
4 7.5 |
31S 4W Sec 25 | Galesville Reservoir | Osipovich | Douglas | Completed 11/4/21 | 4-Nov-2021 16:17 |
Upper Cow TS 25-37 Piles |
11-04-21 1300 |
12 3 |
31S 4W Sec 25 | Galesville Reservoir | Osipovich | Douglas | Completed 11/4/21 | 4-Nov-2021 16:18:14 |
Upper Cow TS 26-1B Piles |
11-04-21 1100 |
13 4 |
31S 4W Sec 26 | Galesville Reservoir | Osipovich | Douglas | Completed 11/4/21 | 4-Nov-2021 16:18:38 |
Upper Cow TS 27-4S Piles |
11-04-21 1500 |
17 11 |
32S 4W Sec 27 | Galesville Reservoir | Osipovich | Douglas | Completed 11/4/21 | 4-Nov-2021 16:19:01 |
Upper Cow TS 35-15 Piles |
11-04-21 1100 |
23 3.2 |
31-4-35 | Galesville Reservoir | Osipovich | Douglas | Completed all 11/4/21 | 4-Nov-2021 16:19:18 |
Upper Cow TS 35-2 Piles |
11-04-21 1200 |
6 4.5 |
31-4-35 | Galesville Reservoir | Osipovich | Douglas | Completed all 11/4/21 | 4-Nov-2021 16:19:37 |
Upper Cow TS 35-3 Piles |
11-04-21 1200 |
5 6 |
31S-4W-35 | Galesville Reservoir | Osipovich | Douglas | Completed all 11/4/21 | 4-Nov-2021 16:19:55 |
Upper Cow TS 35-5 Piles |
11-04-21 1200 |
7 2.2 |
31S-4W Sec35 | Galesville Reservoir | Osipovich | Douglas | Completed LP 1 AC 12/13/19 Completed all 11/4/21 | 4-Nov-2021 16:20:12 |
Jumping Bean 23-1A Piles |
11/08/2021 0900 |
41 7.4 |
T35S-R5W Sec 23 | Hugo | Osipovich | Josephine | Completed 30 ac on 11/05/21 Completed 11 ac on 11/8/21 | 8-Nov-2021 16:38:26 |
Jumping Bean 27-3 Piles |
11/09/2021 0900 |
107 7.4 |
T35S-R5W Sec 27 | Hugo | Osipovich | Josephine | Completed 11/9/21 | 9-Nov-2021 17:53:40 |
Jumping Bean 27-4 Piles |
11/09/2021 1130 |
33 7.4 |
T35S-R5W Sec 27 | Hugo | Osipovich | Josephine | Completed 11/9/21 | 9-Nov-2021 17:54 |
Jumping Bean 23-4A Piles |
11/10/2021 0800 |
44 7.4 |
T35S-R5W Sec 23 | Hugo | Osipovich | Josephine | 11/9/21 completed 20 ac Completed 24ac on 11/10/21 | 10-Nov-2021 13:58:54 |
Pickett Scab 1 Piles |
11-15-2021 0900 |
20 20 |
T35S R7W Sec 22/27/29 | Merlin | Engleson | Josephine | Completed 15ac on 11/10/21 Completed unit on 11/15/21 | 15-Nov-2021 13:41:25 |
Pickett Scab 8 Piles |
11-16-2021 11:00 |
20 20 |
T35S R7W Sec 31 | Merlin | Engleson | Josephine | area that was forgotten of 10 landing piles still in picket scab TS | 16-Nov-2021 10:25:11 |
Williams 13-1 Piles |
11/16/2021 0830 |
100 5.9 |
T39S R5W Sec 17 | Williams | Osipovich | Josephine | Completed 11/16/21 | 16-Nov-2021 17:55:28 |
Elk Stew 31-11a Piles |
11/17/21 1000 |
28 1 |
T31S R8W Sec 31 | Glendale | Engelson | Douglas | 17-Nov-2021 17:20:23 | |
Elk Stew 31-20 Piles |
11/17/21 1000 |
13 4.1 |
T31S R8W Sec 31 | Glendale | Engelson | Douglas | 17-Nov-2021 17:20:56 | |
Elk Stew 31-4b Piles |
11/17/21 1000 |
4 4.5 |
T31S R8W Sec 31 | Glendale | Engelson | Douglas | 17-Nov-2021 17:21:26 | |
Elk Stew 31-4d Piles |
11/17/21 1000 |
7 2.7 |
T31S R8W Sec 31 | Glendale | Engelson | Douglas | 17-Nov-2021 17:21:55 | |
Elk Stew 31-11b Piles |
11/17/21 1000 |
26 1.8 |
T31S R8W Sec 31 | Glendale | Engelson | Douglas | 17-Nov-2021 17:22:16 | |
Elk Stew 31-4c Piles |
11/17/21 1000 |
4 3 |
T31S R8W Sec 31 | Glendale | Engelson | Douglas | 17-Nov-2021 17:22:33 | |
French Flat Title 2 Piles |
11/18/21 1000 |
125 5.1 |
T40S R8W Sec 15 | South of Cave Junction | Osipovich | Josephine | M. Crawford RXB3(t) completed 20 acres on 03/15/19; completed 45 acres on 3/26/19. Completed 7 acres on 01/24/2020. Completed 15 ac 11/17/21 Completed 5 Ac 11/18/21 | 18-Nov-2021 16:26:12 |
Williams Thin 12-3 Piles |
12/07/2021 0930 |
22 1 |
T39S R6W Sec 12 | Williams | Engleson | Josephine | Completed 10 ac handpiles on 10/26/21 | 7-Dec-2021 12:20:21 |
Williams Thin 3-17a Piles |
12/07/2021 0930 |
14 1 |
T39S R6W Sec 3 | Williams | Engleson | Josephine | Completed 4ac handpiles on 10/26/21 | 7-Dec-2021 12:20:54 |
Williams Thin 3-17b Piles |
12/07/2021 0930 |
21 .5 |
T39S R6W Sec 3 | Williams | Engleson | Josephine | Completed 11ac handpiles on 10/26/21 | 7-Dec-2021 12:21:11 |
Williams Thin 1-4 Piles |
12/07/2021 0930 |
6 .5 |
T39S R6W Sec 1 | Williams | Engleson | Josephine | Completed 3ac handpiles on 10/26/21 | 7-Dec-2021 12:22:15 |
Williams Thin 23-4 Piles |
12/08/2021 0930 |
12 6 |
T39S R6W Sec 23 | Williams | Engleson | Josephine | Completed 2ac handpiles on 10/26/21 | 8-Dec-2021 11:43:12 |
Williams Thin 26-1a Piles |
12/08/2021 0930 |
16 7 |
T39S R6W Sec 26 | Williams | Engleson | Josephine | 8-Dec-2021 11:43:40 | |
Williams Thin 26-1b Piles |
12/08/2021 0930 |
33 6 |
T39S R6W Sec 26 | Williams | Engleson | Josephine | 8-Dec-2021 11:45:43 | |
Williams Thin 25-13 Piles |
12/08/2021 0930 |
25 6 |
T39S R6W Sec 25 | Williams | Engleson | Josephine | 8-Dec-2021 12:43:27 | |
East West 9-12a Piles |
11/20/21 0900 |
12 4.3 |
T40S R8W Sec 9 | Cave Junction | Engleson | Josephine | 9-Dec-2021 15:01:31 | |
East West 9-12b Piles |
11/20/21 0900 |
8 4.5 |
T40S R8W Sec 9 | Cave Junction | Engleson | Josephine | 9-Dec-2021 15:01:49 | |
East West 3-3 Piles |
11/20/21 0900 |
10 4.2 |
T40S R8W Sec 3 | Cave Junction | Engleson | Josephine | 9-Dec-2021 15:02:10 | |
East West 5-9 Piles |
11/20/21 0900 |
4 5.3 |
T40S R8W Sec 5 | Cave Junction | Engleson | Josephine | completed 12-9 for all acres | 9-Dec-2021 15:24:25 |
East West 20-1 Piles |
12-10-21 0900 |
10 2.4 |
T39S R7W Sec 20 | Cave Junction | Engleson | Josephine | 10-Dec-2021 15:15:39 | |
East West 8-2 Piles |
12-10-21 0900 |
29 1.4 |
T39S R7W Sec 8 | Cave Junction | Engleson | Josephine | 10-Dec-2021 15:16:07 | |
East West 34-2 Piles |
12-10-21 0900 |
23 5.2 |
T39S R8W Sec 34 | Cave Junction | Engleson | Josephine | 10-Dec-2021 15:16:28 | |
Bear Creek 15-1 Piles |
12/11/21 0900 |
70 5 |
T39S R7W Sec 15 | Cave Junction | Engleson | Josephine | 11-Dec-2021 12:49:33 | |
East West 21-6 Piles |
12-10-21 0900 |
9 2.6 |
T39S R7W Sec 21 | Cave Junction | Engleson | Josephine | 11-Dec-2021 12:50:09 | |
Provolt Piles |
2/28/21 0930 |
40 Ac. |
T38S 5W S1 | Provolt | Engleson | Josephine | 40 Acres completed 2/28/22 | 28-Feb-2022 16:50:56 |
Great cats SFP 1 Piles |
|
1 5 |
39-8W-33 | Cave junction | Josephine | 7 Handpiles | 2-Mar-2022 14:35:41 | |
Mt Bluey TS 1 Piles |
|
5 5 |
35-5W-3 | Josephine ct | Josephine | 3-Mar-2022 13:43:41 | ||
East West 13-18 Piles |
11/8/22 1200 |
65 330 |
39-8W-13 | Cave Junction | Engleson | Josephine | 8-Nov-2022 18:16:02 | |
East West 19-1 Piles |
11/8/22 0700 |
92 460 |
39-7W-19 | cave junction | Engleson/Fukuda | Josephine | 8-Nov-2022 18:16:17 | |
Jumping Bean 14-10 Piles |
11/28/22 0800 |
20 160 |
34-5W-14 | Graves Cr | George Trosi | Josephine | 28-Nov-2022 16:46:54 | |
Jumping Bean 23-10 Piles |
11/28/22 0800 |
21 155 |
34-5W-23 | Graves Cr | George Trosi | Josephine | 28-Nov-2022 16:47:35 | |
jumping Bean 14-5 Piles |
11/29/22 0800 |
42 336 |
34-5W-14 | Graves Cr | Engleson | Josephine | 29-Nov-2022 18:16:42 | |
Jumping Bean 33-1 Piles |
11/29/22 |
32 236 |
34-5W-33 | Jack Cr/Hugo | Keen | Josephine | 29-Nov-2022 18:21:26 | |
Jumping Bean 33-14 Piles |
11/29/22 1315 |
15 120 |
34-5W-33 | Jack Cr/Hugo | Keen | Josephine | 29-Nov-2022 18:22:30 | |
Elk Stew T.S. 33-7 Piles |
|
2 50 |
31-8W-33 | Ken Fukuda | Douglas | 29-Nov-2022 18:30:04 | ||
Elk Stew TS 33-8 Piles |
|
2 50 |
31-8W-33 | West Fork Cow Cr | Ken Fukuda | Douglas | 29-Nov-2022 18:30:31 | |
Half & Half TS 1 Piles |
11/04/22 1200 |
3 75 |
32-5W-3 | Glendale | Engleson | Douglas | 30-Nov-2022 18:07:27 | |
Jumping Bean 33-15 Piles |
11/30/22 0800 |
19 8 |
34-5W-33 | Jack Cr/Hugo | Keen | Josephine | 30-Nov-2022 18:10:23 | |
Jumping Bean 33N-11 Piles |
11/30/22 0900 |
27 8 |
34-5W-33 | Jack Cr/Hugo | Keen | Josephine | 30-Nov-2022 18:11:32 | |
Elk Stew T.S. 31-2a Piles |
11/30/22 0900 |
9 8 |
T31S R8W Sec 31 | West Fork Cow Cr | Ken Fukuda | Douglas | 30-Nov-2022 18:15:28 | |
Jumping Bean 21-S4 Piles |
11/30/22 1100 |
89 8 |
35-5W-21 | Granite Hill | Keen | Josephine | Burned 49 acres on 11/30/22 will finish on 12/1/22. Finished the remaining 40 acres on 12/1/22 | 1-Dec-2022 12:25:37 |
Blown Fortune TS 1 Piles |
12/1/22 1300 |
2 10 |
32-5W3 | Buckhorn mtn | Engleson | Josephine | 2-Dec-2022 6:11:17 | |
Eakin Road Hazard salvage 1 Piles |
12/1/22 0800 |
1 12 |
32-5W-23 | Eakin Road | Stephens | Josephine | 2-Dec-2022 6:11:54 | |
Milk Dudds T.S. Too many to list Piles |
11/28/22 0900 |
50 8 |
31-8&9W-7,9,11,13,15,19,25 | West Fork Cow Cr | Ken Fukuda/Stephens | Douglas | Multiple days due to multiple units and miles between units should finish up sale 12/1/22. Approximately 10ac. remaining on 11/30/22 | 2-Dec-2022 6:15:38 |
Milk Dudds T.S. Piles |
12/6/22 0900 |
10 8 |
31-8&9W-7,9,11,13,15,19,25 | West Fork Cow Cr | Engleson/ Stephens | Douglas | A few units left, snow blocked access, Completed on 12/7/22 | 7-Dec-2022 14:53:03 |
Pink Panther TS Piles |
12/7/22 0800 |
10 8 |
33-6W-2,7,15,17,19 | Glendale | Keen | Douglas | Burning Landings completed on 12/7/22 | 7-Dec-2022 14:53:58 |
Cheney Slate 31 Piles |
12/07/22 1000 |
246 8 |
T37-4W-31 | GPFO Kubli Rd | Engleson | Josephine | Burned 50 acres on 12/7 Burned 200 on 12/8 | 9-Dec-2022 9:23:34 |
Sis-Q Comm. site Piles |
12/9/22 1030 |
3 50 |
35-5W-33 | Granite Hill | Engleson | Josephine | 12-Dec-2022 13:05:57 | |
Williams 17-4/17-4A Piles |
2/1/2023 1000 |
80 4.5 |
T39S R5W Sec 17 | Williams | Fukuda | Josephine | Burned 3 acres on 1/9/23 too wet Completed all acres om 2/1/23 | 1-Feb-2023 17:14:22 |
Williams 17-4 Piles |
11/16/2021 0900 |
100 4.5 |
T39S R5W Sec 17 | Williams | Josephine | completed on 2/1/23 | 13-Feb-2023 9:26:13 | |
Rockydale Title 2 Piles |
11/01/2023 1100 |
23 5 |
T40s R08w section 15 | Rockydale Road in Cave Junction | T. Hawkins | Josephine | All acres completed on 11/01/2023 | 1-Nov-2023 17:32:03 |
East West 3-4 Piles |
11/6/2023 08:30 |
69 5 |
40S 8W S3 | 3 Mi South of Cave Junction | Fukuda | Josephine | Completed all acres on 11/6/23 | 6-Nov-2023 15:59:43 |
Jumping Bean 14-8 Piles |
11/6/2023 08:30 |
41 7 |
34S-5W-S14 | East of Sunny Valley | Engleson | Josephine | Completed all acres on 11/6/23 | 6-Nov-2023 16:00:51 |
Jumping Bean 14-8A Piles |
11/6/2023 08:30 |
11 7 |
34-5-14 | East of Sunny Valley | Schuh | Josephine | Completed 5 acres on 11/6/23. 6 acres remaining. Completed 11/7/23 | 7-Nov-2023 15:43:50 |
East West 9-8 Piles |
11/7/23 08:30 |
19 5.7 |
40S 8W S9 | 4 miles south of Cave Junction | Hawkins | Josephine | Completed all acres 11/7/23 | 7-Nov-2023 15:44:31 |
Jumping Bean 13-3 Piles |
11/7/2023 08:30 |
31 7 |
34S 5W S13 | East of Sunny Valley | Schuh | Josephine | Completed all acres | 7-Nov-2023 15:47:59 |
Williams 21-16 Piles |
11/8/23 1000 |
8 5 |
T39S R5W Sec 21 | Williams | Fukuda | Josephine | completed 11/8/23 | 8-Nov-2023 16:30:36 |
East West 7-S Piles |
11/9/23 1000 |
31 5 |
40S 8W S7 | 5 Mi SW of Cave Junction | B. Hawkins/Chandler (t) | Josephine | 26 acres burned 11/8/23 . All remaining acres completed on 11/9/2023 | 9-Nov-2023 15:30:12 |
East West 8-3 Piles |
11/16/2023 10:00 |
31 5 |
39S 7W S8 | 4 miles east of Cave Junction | Fukuda | Josephine | Completed 11/16/23 | 16-Nov-2023 16:22:16 |
East West 17-1 Piles |
11/17/2023 10:00 |
77 5 |
39S 7W S17 | 4 miles east of Cave Junction | Fukuda | Josephine | 16 acres completed 11/16/23 77 Acres complete 11/17/23 | 17-Nov-2023 16:02:12 |
Williams 17-2 Piles |
11/18/2023 1000 |
46 5 |
39S-5W-S17 | Lone Creek/4 miles SW of Williams | Hawkins | Josephine | 82 Acres Completed 11/17/23. Unit completed 11/18/23 | 18-Nov-2023 14:55:01 |
Rock Creek SFP Piles |
11/30/2023 1100 |
1 3 |
39S 5W S22 | 4 miles south of Williams | Fukuda | Josephine | Completed on 11/30/2023 Lizio RXB3 (T) | 30-Nov-2023 16:53:18 |
East Fork Williams SFP Piles |
11/30/2023 1000 |
1 3 |
39S 5W S14/23 | Rock Creek, Williams | Fukuda | Josephine | Completed on 11/30/2023 Lizio RXB3 (T) | 30-Nov-2023 16:54:07 |
Snow Creek ROW Piles |
12/4/23 1000 |
5 55 |
32S 3W S8 | 5mi SE of Galesville Reservoir | Hawkins | Douglas | Completed 12/4/23 | 4-Dec-2023 15:29:06 |
Jo Rummy 21-3 Piles |
12/5/23 0800 |
1 13.5 |
34S 7W S21 | 2 mi east of Rand | Hawkins | Josephine | 29 ac completed 12/4/23 Completed remaining acres on 12/5/23 | 5-Dec-2023 15:09:26 |
Jo Rummy 33-1 Piles |
12/5/2023 0900 |
3 3.5 |
34S 7W S33 | 2.5mi south of Rand | Hawkins | Josephine | Completed all acres on 12/5/23 | 5-Dec-2023 15:11:05 |
Morris Creek SFP Piles |
12/6/2023 10;00 |
2 6 |
T35S-R5W-21 | 4 miles North of Grants Pass | Hawkins | Josephine | Completed 12/6/2023 | 6-Dec-2023 15:15:14 |
Speaking Coyote 20-1 Piles |
12/6/2023 13:00 |
1 10 |
T33S-R5W-20 | 4 miles East of Wolf Creek | Hawkins | Josephine | Completed 12/6/23 | 6-Dec-2023 15:16:22 |
Bull Run ROW Section 25 Piles |
12/6/2023 13:00 |
32 15 |
T32S-R5W-25 | 2.5 miles se of Azalea | Fukuda | Douglas | Completed 12/6/23 | 6-Dec-2023 15:16:37 |
Williams 17-1 Piles |
12/8/2023 11:00 |
1 3 |
39-5-17 | Lone Creek/4 mi SW of Williams | Hawkins | Josephine | 39 acres completed 11/18/23 37 acres completed 11/20/23 All remaining acres (94) completed on 11/21/23. Will cleanup 1 acre skipped piles 12/8/23 | 8-Dec-2023 14:35:38 |
Bull Run ROW Section 30 Piles |
12/6/2023 13:00 |
14 15 |
T32S-R4W-30 | 2.5 miles se of Azalea | Fukuda | Douglas | Completed 12/6/23 | 11-Dec-2023 7:46:37 |
Beef Stew Handpiles SFP Piles |
12/11/2023 14:00 |
1 1 |
T32S-R4W-21 | 4 miles E/SE of Azalea | Fukuda | Douglas | Completed all acres on 12/11/2023 | 11-Dec-2023 15:28:56 |
Bull Run ROW Sec 19 Piles |
12/11/2023 09:30 |
57 15 |
32S 4W sec19 | 2.5 mi se of Azalea | Fukuda | Douglas | Completed all acres on 12/11/2023 | 11-Dec-2023 15:29:18 |
Thompson Creek SFP Piles |
12/12/2023 11:00 |
1 2 |
T39S-R5W-25 | 5 miles S/SE of Williams | Fukuda | Josephine | Completed on 12/12/23 Haley RXB3(T) | 12-Dec-2023 16:04:26 |
Vanlandingham Piles |
12/12/2023 11:00 |
1 1 |
T38S-R5W-15 | 3 miles North of Williams | Hawkins | Josephine | All acres completed 12/12/23 | 12-Dec-2023 16:05:11 |
Jo Rummy ROW Piles |
1/19/2024 1100 |
2 12.5 |
34-7-33, 35-7-5 | Stratton Creek | Hawkins | Josephine | Completed 1/19/24 | 19-Jan-2024 16:23:05 |
Sprague Admin Piles 2023 Piles |
1/22/2024 10:00 |
5 10 |
35-6-5 | Sprague Seed Orchard | Fukuda | Josephine | Completed all acres on 1/22/2024 | 22-Jan-2024 15:38:52 |
Jo Rummy 5-2 Piles |
1/19/2024 1100 |
5 12 |
35S 7W S5 | 3mi SE of Rand | Hawkins | Josephine | Completed 5 acres 1/18/24 Completed 4 Acres 1/19/24 | 22-Jan-2024 15:41:26 |
Savage Creek ROW Piles |
2/1/2024 |
5 7 |
37-5-13 | 37-5-1 Road | Fukuda | Josephine | Completed 2/1/24 | 1-Feb-2024 15:44:59 |
Savage Murph 17-5 Piles |
2/1/2024 1100 |
1 25 |
37-4-17 | Birdseye Creek | Fukuda | Josephine | Completed 2/1/24 | 1-Feb-2024 15:45:19 |
Savage Murph 21-13 Piles |
2/1/2024 1200 |
1 22 |
37-4-21 | Foots Creek | Fukuda | Josephine | completed 2/1/24 | 1-Feb-2024 15:45:31 |
Savage Murph T.S. 14-5 Piles |
2/1/2024 1000 |
2 40 |
37-5-14 | Savage Creek | Fukuda | Josephine | completed 2/1/24 | 1-Feb-2024 15:45:44 |
Rand Admin Piles |
2/2/24 1000 |
1 5 |
34S 8W Sec 24 | Rand admin site | Hawkins | Josephine | Completed 2/2/24 | 2-Feb-2024 15:30:31 |
Cathedral Hills West Piles |
2/13/2024 1100 |
1 4 |
36S 5W Sec 31 | Cathedral Hills | Fukuda | Josephine | completed 2/13/24 | 13-Feb-2024 16:31:30 |
Provolt Admin Piles Piles |
2/14/2024 11:00 |
1 13 |
38S 5W Sec 12 | Provolt | Hawkins | Josephine | 2 acres completed 2/8/2024 1 acre completed 2/14/2024 | 14-Feb-2024 15:39:47 |
Provolt 1 Underburn |
05/09/2024 12:00 |
2 2 |
38S 5W S1 | 10 Mile SSE of Grants Pass | ken Fukuda | Josephine | Beau Lee RXB2 (t) All acres completed on 5/9/24 | 9-May-2024 19:59:11 |
Stratton Hog 1-5 Underburn |
5/14/2024 10:00am |
42 6 |
T35S-R7W-Sec.1 | 11 miles NW of Grants Pass | Fukuda | Josephine | All Acres completed on 5/14/2024 | 14-May-2024 19:53:12 |
Provolt Unit 2 Underburn |
6/7/2024 08:00am |
12 1 |
T38S-R5W-12 | 9 miles SE of Grants Pass | Fukuda, Lee RXB2T | Josephine | Completed on 6/7/2024 all acres | 7-Jun-2024 21:37:52 |
Grants Pass Fuels EA Peco Piles |
11/19/24 0730 |
81 5 |
T35S-R6W-Sec33 | 4 miles NW of Grants Pass | Fukuda | Josephine | Full Service Grayback burn | 19-Nov-2024 16:08:07 |
Rand Powerline Piles Piles |
11/19/2024 1100 |
1 5 |
34S-8W-24 | Rand | Hawkins | Josephine | Completed 11/19/24 | 19-Nov-2024 16:35:35 |
Rock Creek Repair Piles Piles |
11/19/24 1100 |
1 3 |
T33S-R7W-Sec32 | 2 miles East of Grave Creek boat ramp | Hawkins | Josephine | Completed 11/19/2024 | 19-Nov-2024 16:35:57 |
Crow Road Piles |
11/20/24 1200 |
1 5 |
T35S-R6W-Sec.19 | Merlin | Fukuda | Josephine | Completed 11/20/2024 | 20-Nov-2024 16:25:06 |
Sprague Seed Orchard Piles |
11/20/24 0900 |
1 10 |
T35S-R6W-Sec.5 | Sprague Seed Orchard Merlin | Fukuda | Josephine | Completed 11/20/2024 | 20-Nov-2024 16:25:21 |
Stratton Hog Access Piles Piles |
11/20/24 1400 |
1 5 |
T35S-R7W-Sec.1 | Merlin | Fukuda | Josephine | Completed 11/20/2024 | 20-Nov-2024 16:25:33 |
Griffin Park Piles Piles |
11/21/2024 1300 |
1 4 |
T36S-R7W-Sec.11 | 8 miles W of Grants Pass | Fukuda | Josephine | Completed on 11/21/24 | 21-Nov-2024 17:14:02 |
Sloan Mountain Access Piles |
11/21/24 1400 |
1 5 |
T36S-R7W-Sec.25 | 8 miles W of Grants Pass | Fukuda | Josephine | Completed on 11/21/24 | 21-Nov-2024 17:14:26 |
Westside Road Piles |
11/21/24 1000 |
1 3 |
T39S-R8W-Sec.17 | 2 miles NW of Kirby | Fukuda | Josephine | completed on 11/21/24 | 21-Nov-2024 17:15:12 |
Beef Stew Beef Stew T.S. Piles |
12/02/2024 11:00AM |
61 3 |
T32S-R4W-Sec. 08,09,17,21 | 23 miles N/NE of Grants Pass | Fukuda | Douglas | Completed 36 of 61 acres in 32s-4w-17 on 11/18/24. Completed all remaining acres on 12/2/2024 | 2-Dec-2024 17:42:13 |
McGinnis ROW Units 2 and 3 Piles |
12/3/2024 11:00 |
8 8 |
T32S-R4W-Sec.29 | 21 miles N of Grants Pass SSRA | Fukuda | Douglas | completed 12/3/24 | 3-Dec-2024 16:52:31 |
Woodford Quarry ROW Piles |
12/3/2024 1300 |
12 1.3 |
T32S-R5W-Sec.33 | 19 miles N of Grants Pass SSRA | Fukuda | Douglas | completed 12/3/2024 | 3-Dec-2024 16:52:58 |
Milk Dudds Sec. 15 Piles |
12/4/2024 |
12.5 8 |
T31S-R9W-Sec.15 | 36 miles NW of Grants Pass SSRA | Fukuda | Douglas | Completed 12/4/24 | 4-Dec-2024 16:40:42 |
McGinnis ROW Unit 1 Piles |
12/9/2024 11:00 |
3 15 |
T31S-R4W-Sec.27 | 28 Miles N of Grants Pass SSRA | Hawkins | Douglas | 2 acres accomplished 12/3/24 1 acre completed 12/9/2024 | 9-Dec-2024 16:25:55 |
Snow Creek ROW Piles |
12/9/2024 1200 |
2 1.5 |
T32S-R3W-Sec.8 | 26 miles N/NE of Grants Pass SSRA | Hawkins | Douglas | Completed 12/9/2024 | 9-Dec-2024 16:26:18 |
Rocky Riffle T.S. Piles |
12/10/2024 1100 |
1 3 |
34S 8W Sec 25 | Galice | T. Hawkins | Josephine | Completed 3 acres 2/21/24, Completed 3 Acres 11/19/24, Completed 12/10/24 | 11-Dec-2024 8:57:15 |
Blown Fortune Handpiles Piles |
12/12/2024 0800 |
36 4 |
T32S-R5W-Sec.3 | 24 miles N of Grants Pass SSRA | K. Fukuda | Douglas | All 36 Acres completed on 12/12/2024 | 12-Dec-2024 17:33:10 |
Savage Murph TS Piles |
12/18/2024 1000 |
34 5 |
37S 5W Sec 23 | Savage Creek | T. Hawkins | Josephine | Completed 12/18/24 | 18-Dec-2024 16:01:41 |