Rogue River - Siskiyou National Forest |
Today's Fire Manager: | DIV-3 |
Comments: |
Project Name Unit Number Type |
Est. Date/Time of Ignition |
Planned Acres Tons per Acre |
Legal | Descriptive Location | Burn Boss | County | Comments | Updated |
---|---|---|---|---|---|---|---|---|
Wildhorse Prairie 1 Broadcast |
|
20 5 |
T. 36S R. 12W Sec. 7 | Wildhorse | TBD | Curry | 17-Jan-2024 13:21:48 | |
Wildhorse Prairie 2 Broadcast |
|
47 12 |
T. 36S R. 12W Sec. 7 | Wildhorse | TBD | Curry | 17-Jan-2024 13:22:03 | |
Wildhorse Prairie 3 Broadcast |
|
50 9 |
T. 36S R. 12W Sec. 18 | Wildhorse | TBD | Curry | 17-Jan-2024 13:22:16 | |
SOD Wheeler Creek 683 Piles |
12-11-24 1400 |
6 3 |
T 40S R 12W Sec 29 | Winchuck River area: Wheeler Creek N42º 3.779’ W124º 8.363’ | Curry | NON-WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of Sudden Oak Death (phytophthora ramorum) management activities. | 10-Dec-2024 16:47:23 | |
SOD Winchuck East 789 Piles |
12-11-24 1300 |
7 5 |
T40S R12W Sec 26 | Winchuck River N42º 3.827’ W124º 4.957' | Curry | NON-WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of Sudden Oak Death (phytophthora ramorum) management activities. | 10-Dec-2024 16:47:35 | |
Nook Piles |
12-11-24 1100 |
63 2.25 |
T39S R12W Sec. 29 | Chetco River Adjacent to Nook and Redwod Bar | Larrimore | Curry | 50 Acres Remain. Too Green to continue in 2024. Completed 1 Acre 12/12/24 Completed 12 Acres 12/11/24 N42° 08.777’ W124° 08.777’ Non-Harvest related fuels treatment. WUI. Completed 12 acres 12/11/2024 | 12-Dec-2024 16:31:15 |
Project Name Unit Number Type |
Est. Date/Time of Ignition |
Planned Acres Tons per Acre |
Legal | Descriptive Location | Burn Boss | County | Comments | Updated |
---|---|---|---|---|---|---|---|---|
Botanical unit 33 Piles |
11/10/2011 0800 |
5 100 |
T34S 12W sec15 | South waet of Brushy Mountain | Zerbeck P/I | Curry | MICC had to add this unit to REBOL and WildCAD. Not on the list submitted the day before. | 10-Nov-2011 8:12:43 |
Botanical Unit 24 Piles |
11-09-2011 0930 |
4.04 Acres |
T32S R11W Sec 17 | Delta creek | Dave Pacific Coast | Curry | Contract Burn with Clint Emerson as COR/PI Agency unit was completed on 11/09/11 | 9-Nov-2011 12:43:43 |
Botanical Unit 26 Piles |
11-09-2011 1100 |
1.6 Acres |
T34S R12W Sec 8 | South of Boulder Creek | Dave Pacific Coast | Curry | Contract Burn with Clint Emerson as COR/PI Agency unit completed on 11/09/11 | 9-Nov-2011 15:28:28 |
Nacindigo (Raspberry) 9 Piles |
12/14/11 1100 |
11 10 |
T35S R11W Sec 22&27 | Raspberry Mountain | Edwards | Curry | Completed 9 acres 11-14-11, 11 left | 14-Dec-2011 16:12:24 |
W-W 2 Piles |
12/12/11 1030 |
28 2 |
T40S R12W S7 | Near Mt. Emily | Edwards | Curry | Machine piles | 12-Dec-2011 15:13:43 |
W-W 1 Piles |
12/12/11 1000 |
6 5 |
T40S R12W S7 | Near Mt. Emily | Edwards | Machine piles | 12-Dec-2011 15:14:19 | |
W-W 4 Piles |
12/12/11 1130 |
18 2 |
T40S R12W S18 | Near Mt. Emily | Edwards | Curry | Machine piles | 12-Dec-2011 16:03:46 |
W-W 19 Piles |
12/14/11 1300 |
22 2 |
T40S R12W S32 | Near Mt. Emily | Edwards | Curry | Machine piles, completed 5 acres today 12/14/11 | 14-Dec-2011 10:23:56 |
W-W 14 Piles |
12/14/11 1200 |
34 2 |
T40S R12 W S29 | Near Mt. Emily | Edwards | Curry | Machine piles | 14-Dec-2011 16:13:39 |
Pebble Hill 2 Piles |
12/7/2011 1200 |
5 6 |
T33S R11W S36 | Lawson Creek Drainage | Edwards | Curry | Est 20 piles total | 7-Dec-2011 14:17:52 |
Pebble Hill 1 Piles |
12/7/2011 0900 |
9 6 |
T36S R12W S26&35 | Lawson Creek Drainage | Edwards | Curry | Est 45 Piles total | 7-Dec-2011 14:18:23 |
Southwest 13G Piles |
12/8/2011 1200 |
2 5 |
T37S R13W | Near Elko Camp | Edwards | Curry | A few machine piles in unit | 7-Dec-2011 15:5508 |
Southwest 13E Piles |
12/8/2011 1100 |
1 5 |
T37S R13W | Near Elko Camp | Edwards | Curry | A few machine piles in unit | 7-Dec-2011 15:56:13 |
Southwest 2 Piles |
12/8/2011 1200 |
43 1 |
T37S R13W | Near Elko Camp | Edwards | Curry | A few machine piles in unit | 8-Dec-2011 14:36:20 |
Southwest 2A Piles |
12/8/11 1230 |
1 7 |
T37S R13W | Near Elko Camp | Edwards | Curry | A few machine pile in unit | 8-Dec-2011 14:38:19 |
Southwest 10 Piles |
12/8/2011 1300 |
85 0.1 |
T37S R13W | Near Elko Camp | Edwards | Curry | A few machine piles in unit | 8-Dec-2011 14:48:19 |
Southwest 3 Piles |
12/8/2011 1100 |
11 5 |
T37S R13W | Near Elko Camp | Edwards | Curry | A few machine piles in unit | 8-Dec-2011 14:49:07 |
Southwest 13B Piles |
12/8/2011 1030 |
5 4 |
T37S R13W | Near Elko Camp | Edwards | Curry | A few machine piles in unit | 8-Dec-2011 14:51:04 |
Southwest 11 Piles |
12/8/2011 1400 |
4 5 |
T37S R13W | Near Elko Camp | Edwards | Curry | A few machine piles in unit | 8-Dec-2011 15:41:43 |
Upper Quail #3 Piles |
12/19/2011 0730 |
6 |
38S 12W Sec 23 | Quail Prarrie Long Ridge | Ponderosa | Curry | Tim Spenser project inspector | 19-Dec-2011 14:18:34 |
Upper Quail #2 Piles |
12/19/2011 0730 |
6 |
38S 12W Sec 22 | Upper Quail Prarrie | Ponderosa | Curry | Tim Spenser Project Inspector | 19-Dec-2011 14:17:13 |
Upper Quail #1 Piles |
12/19/2011 0730 |
38 |
38S 12W sec 27 | Quail Prarrie Long Ridge | Pondersosa | Curry | Tim Spensor Project Inspector | 19-Dec-2011 14:17:36 |
Upper Quail #4 Piles |
12/19/2011 0730 |
6 |
38S 12W Sec 27 | Quail Prarrie | Ponderosa | Curry | Tim Spenser Project Inspector | 19-Dec-2011 14:18:59 |
Upper Quail #6 Piles |
12/19/2011 0730 |
15 |
38S 12W Sec 23 | Quail Prarrie | Ponderosa | Curry | Tim Spenser Project Inspector | 19-Dec-2011 14:18:04 |
Long Ridge #15 Piles |
12/19/2011 0730 |
3 |
38S 12W Sec27 | Long Ridge Quail Prarrie | Ponderosa | Curry | Tim Spenser Project Inspector | 19-Dec-2011 14:19:21 |
Long Ridge #16 Piles |
12/19/2011 0730 |
8 |
38S 12W Sec 23 | Long Ridge Quail Prarrie | Ponderosa | Curry | Tim Spenser Project Inspector | 19-Dec-2011 14:19:45 |
High Prairie Broadcast |
10/18/2012 11:00a.m. |
104 12 |
38S-12W-sec3 | High Prairie | Hoffman | Curry | Contact for unit Info - Hoffman -541-646-2634 Contengency Forces are GrayBack 20 person crew 4 hours out from Medford. | 18-Oct-2012 16:12:31 |
UC Thin Unit 7 Piles |
10/29/12 1100 |
41.5 15 |
39s 12w section 7 | Panther Creek | Hoffman, Middleton (T) | Curry | Completed 10/30/12 | 30-Oct-2012 15:09:35 |
Botanical Restoration 22 Piles |
10/31/12 |
4 2 |
34S, 10W, SEC 31 | Burnt Ridge | Pacific Coast | Curry | Hoffman is Agency contact/PI completed 10/31/12 | 31-Oct-2012 11:04:53 |
Botanical Restoration 23 Piles |
10/31/12 |
2 2 |
35S, 10W, SEC 6 | Burnt Ridge | Pacific Coast | Curry | Hoffman is Agency contact/PI completed on 10/31/12 | 31-Oct-2012 11:06:09 |
Botanical Restoration 20 Piles |
10/31/12 |
2 2 |
36 S, 12W, SEC 24 | Wildhorse | Pacific Coast | Curry | Hoffman is Agency contact/PI completed on 10/31/12 | 31-Oct-2012 14:16:27 |
W-W Thin Unit 8 Piles |
11/06/12 1100 |
15.5 4 |
40S 12W S19&30 | Mill Creek | Edwards/Middleton(T) | Curry | Machine piles. completed 11/6/12 | 6-Nov-2012 15:16:19 |
W-W Thin Unit 40 Piles |
11/06/12 1100 |
33.6 4 |
40S 12W S 12 | Winchuck | Edwards/Middleton(T) | Curry | Completed 11/6/12 | 6-Nov-2012 15:18:02 |
W-W Thin 39 Piles |
11/06/12 1100 |
57 4 |
T40S R12W S12 | Near Mt. Emily | Edwards/Middleton(T) | Curry | Machine piles, completed 11/6/12 | 6-Nov-2012 15:20:03 |
Botanical Unit 44 Piles |
11/07/12 1100 |
2.43 2 |
34S 12W S 6 | Lobster Creek | Edwards/Geisler(T) | Curry | completed 11/7/12 | 7-Nov-2012 13:45:04 |
Botanical Unit 41 Piles |
11/07/12 1100 |
1.5 2 |
34S 12W S 5&6 | Lobster Creek | Edwards/Geisler(T) | Curry | completed on 11/7/12 | 7-Nov-2012 14:43:17 |
Botanical Unit 35 Piles |
05/23/13 1000 |
2 |
T35S R11W sec 28 | 3 miles South of Raspberry Mtn | Curry | completed 2.5ac on 5/22/13 rounded up to 3ac for sit report | 23-May-2013 8:18:18 | |
Botanical Unit 36 Piles |
05/23/13 1100 |
2.25 |
T36S R13W sec 30 | Near Frog Lake | Curry | accomplished 1/4ac on 5/21/13 completed 1.75 ac on 5/22/13 completed 2.25 acres on 5-23-13 | 23-May-2013 15:45:21 | |
Botanical Unit 45 Piles |
09/27/13 1100 |
2 10 |
T34S R11W sec 26 | 3 miles NE of Agness | Hoffman | Curry | completed 3ac on 9/26/13; Completed remaining 2ac 9/27/13 | 27-Sep-2013 15:33:24 |
Southwest t.s. 1,2,2a,3,9,13b,22 Piles |
9/30/12 1100 |
7 10 |
T35s,R13w,sec10,11,3 | Elko Camp area | Geisler/Hoffman | Curry | 30-Sep-2013 16:14:12 | |
East Fork Winchuck SOD Piles |
10/23/13 10930 |
2 15 |
T40S R12W S34 | Winchuck River | Hoffman | Curry | Hoffman +1 SOD Rx Contract Inspection..completed 5ac on 10/22/13 Completed remaining two acres. 10/23/2013 | 23-Oct-2013 14:55:24 |
Pine Grove Piles |
10/30/13 1230 |
10 47 |
T35S R12W S23/26 | Wild Horse Ridge Agness | Mason PI | Curry | Mason RXB2t 95ac total 10ac completed on 10/30/13 | 30-Oct-2013 16:16:52 |
Wheeler Creek SOD Piles |
11/1/13 |
7 15 |
T40S R12W S28 | Wheeler Creek | Contractor | Curry | Hoffman +3 and Culp on-site with contractor for inspection. 39ac total 4 acres completed 10-21-2013. 5ac completed on 10/29/13 24ac completed on 10/30/13 completed 5ac on 10/31/13 7 acres completed 11/1/13 | 1-Nov-2013 15:37:47 |
UC Thin UC 9,10 Piles |
11/13/13 0930 |
24 15 |
T 38S R 13W S 34, 35 | 10 miles NE of Brookings | Leonard | Curry | Leonard +2Completed 30 acres 11/13/13. completed 24 acres 11-14-2013 | 14-Nov-2013 14:09:31 |
Backbone 4, 6 & 10 Piles |
1/30/2014 0930 |
52 15 |
T39S R12W S29 31 &19 | Chetco River | Leonard | Curry | Units 6 and 10 complete 46ac. Unit 4 is planned for 1/30 52ac. Acomplished units 10&6 for 46ac on 1/29/14 accomplished 52 ac on unit 4 and unit is complete | 30-Jan-2014 13:16:17 |
W-W 25, 26 Piles |
1/31/2014 0930 |
16 10 |
T40S R12W S36 | E of Ludlum House | Mason/Leonard | Curry | two units 25 & 26 (12 and 4 acres respectively)Comp on 1/31/14 for 16 acres | 31-Jan-2014 15:18:16 |
Backbone Thin Unit 22A Piles |
2/4/2014 0900 |
4 10 |
39S 12W S 19 | Nook Creek | Leonard | Curry | 4-Feb-2014 13:43:27 | |
Backbone Thin Unit 22B and C Piles |
2/4/2014 0900 |
7 10 |
39S 12W S 19 | Nook Creek | Leonard | Curry | 4-Feb-2014 13:43:38 | |
W-W 14,15 Piles |
2/4/2014 1200 |
53 10 |
T40S R12W S29/30 | SSE of Mt. Emily | Spencer/Leonard | Curry | Two units 14 & 15 (34 and 19 acres respectively) | 4-Feb-2014 15:44:55 |
W-W 3 Piles |
2/6/2014 0930 |
24 10 |
T40S R12W S18 | S of Mt. Emily | Leonard | Curry | Single unit. completed on 2/6/14 | 6-Feb-2014 11:57:09 |
W-W 29 Piles |
2/06/2014 1400 |
10 6 |
T40S R12W S36 | ESE of Ludlum House | Leonard | Curry | Single unit 10 acres Completed 2/6/14. | 6-Feb-2014 15:01:17 |
W-W 9,10,11 Piles |
2/7/2014 0900 |
43 10 |
T40S R12W S30 | SSW of Mt. Emily | Mason/Leonard | Curry | three units 9, 10, 11 (17/14/12 respectively)Completed 43 acres 2/7/14 | 7-Feb-2014 15:00:05 |
Too Wild North Broadcast |
10/8/2014 1000 |
|
T36S R12W S18 | Wildhorse LO | Hackett | Curry | 10-8-14 burned 20 acres | 8-Oct-2014 16:11:25 |
Southwest 9 Broadcast |
10/8/2014 1000 |
24 6 |
T37S R13W S3 | Near Elko Camp | Hackett | Curry | Completed burn for 24 acres 10-8-14 | 8-Oct-2014 18:32:21 |
Botanical Unit 20 Piles |
10-17-11 |
1.4 |
T36S R12.5W Sec 24 | Fritsche Cabin | Dave Pacific Coast | Curry | Contract Burn with Clint Emerson as COR/PI Agency | 11-Oct-2014 9:20:19 |
Botanical Unit 21 Piles |
11-19-2013 0930 |
.8 |
T34 R11 Sec 23 | Helgate area | Leonard | Curry | 11-Oct-2014 9:20:49 | |
Botanical Unit 22 Piles |
11-19-2013 1000 |
3.1 |
T34S 10W Sec31 | SW of Squirl Peak | Leonard | Curry | Completed 1 acre of the 4.1 planned 11/19/13. | 11-Oct-2014 9:21:05 |
Botanical Unit 23 Piles |
11-10-2011 1000 |
1.26 |
T35S 10.5W Sec 6 | West of Grasss Flat area | Dave | Curry | Contract Burn with Clint Emerson as COR/PI Agency | 11-Oct-2014 9:21:30 |
Botanical Unit 25 Piles |
10/17/2011 |
1.6 |
T33S R12W Sec 36 | North Fork of Fosters Creek | Dave Pacific Coast | Curry | Contract Burn with Clint Emerson as COR/PI Agency | 11-Oct-2014 9:21:43 |
Botany Pile Burn Unit 45 Piles |
10/23/12 |
5 9 tons/acre |
T34s/R11w/sec 26 | Bear Camp Rd. | Hoffman | Curry | If unable to access Bear Camp area, we will move to Frog Lake area or Raspberry area. | 11-Oct-2014 9:22:29 |
Fish Hook Broadcast |
10/18/2012 11:00am |
15 12.5 |
35S-10W-Sec6 | Fish hook peak area | Dan Quinones | Curry | Contact for unit Info - Lilienthal-541-404-3239 Contingency Forces are GrayBack 20 person crew 4 hours out from Medford. 15 acres left to burn 10/18/12. | 11-Oct-2014 9:23:42 |
Wilson Creek SOD Piles |
2/11/13 0900 |
22 15 |
T39S R12W S19 | Near Loeb State Pk | Curry | "Green Burn" with 5 ac on FS and 17ac on ODF to treat SOD infection. | 11-Oct-2014 9:25:39 | |
Mineral Fork 12 Broadcast |
10/24/13 0930 |
6 3.5 |
T38S R13W S25 | Mineral Hill | Edwards | Curry | 11-Oct-2014 9:43:34 | |
Mineral Fork 13 Broadcast |
10/24/13 0930 |
6 3.5 |
T38S R13W S 24 | Mineral Hill | Edwards | Curry | 11-Oct-2014 9:43:42 | |
Potatoe Patch 2 and 3 Piles |
11/6/2013 1300 |
10 5 |
35 13 sec 35 | 4 miles West of Lobster Crk Bridge | Monty Edwards | Curry | 11-Oct-2014 9:44:25 | |
Southwest 21 Piles |
12/8/2011 1130 |
4 5 |
T37S R13W | Near Elko Camp | Edwards | Curry | A few machine piles in unit | 11-Oct-2014 9:44:39 |
Southwest 22 Piles |
12/8/2011 1230 |
2 5 |
T37S R13W | Near Elko Camp | Edwards | Curry | A few machine piles in unit | 11-Oct-2014 9:44:47 |
Woodruff Meadows Piles |
12/20/11 0730 |
22 |
38S 13W sec9 | Quail Prarrie Area | Ponderosa | Curry | Tim Spenser Project Inspector | 11-Oct-2014 9:45:47 |
Wildhorse: North 1 Broadcast |
10/27/2011 1000 |
10 6 |
T36S R12W S7 | Wildhorse Lookout | Edwards | Curry | Plan to burn only 10 of the 40 acres of whole project. Competed the 10ac on 10/27/11 | 11-Oct-2014 9:46 |
W-W 38 Piles |
12/14/11 1330 |
12 2 |
T40S R12W S12 | Near Mt. Emily | Edwards | Curry | Machine piles | 11-Oct-2014 9:46:44 |
Too Wild South Broadcast |
0930 |
21 4.5 |
T36S R12W S7 | Wildhorse CG | Hoffman | Curry | 56ac total 35ac completed on 10/29/13 | 11-Oct-2014 9:47:17 |
Botanical Unit 38 Piles |
10/14/14 1000 |
2.4 2.5 |
T36S R13W sec34 | on the Westside of Quosatana Butte | Leonard | Curry | AKA Quasatna Butte ARRA Piles | 14-Oct-2014 16:54:20 |
Pickle Ranch Piles |
10/15/14 1400 |
|
T37S R13W S9 | near 1503 and 1703 intersection | Geisler | Curry | Re-stack piles from defaulted contract. Unit completed for a total of 13 acres | 15-Oct-2014 16:12:43 |
Signal Butte Botanical Unit 31 Piles |
10/16/14 1000 |
15 1 |
T37S R13W Sec6 | South of Signal Butte | Geisler | Curry | RXB3 Burn; Old ARRA Piles. | 16-Oct-2014 15:19:51 |
UC Thin 4 Piles |
10/21/2014 1100 |
24 3 |
T38S R12W Sec33 | Chetco River | Geisler | Curry | Unit Complete | 22-Oct-2014 7:59:47 |
Long Ridge #2 3,3A Piles |
10/27/2014 1100 |
19 3 |
T38S R12W SEC 27 & 26 | Quail Creek Drainage | Leonard | Curry | burned 19 acres completed | 27-Oct-2014 16:35:10 |
Long Ridge #1 Unit 1,21 Piles |
10/27/2014 1100 |
31 12 |
T38S R12W SEC 27 & 34 | Quail Creek Drainage | Leonard | Curry | Accomplished 17ac unit 21 complete. | 27-Oct-2014 16:36:26 |
Long Ridge #4 14 Piles |
10/27/2014 1300 |
31 13 |
T38S R12W SEC 23 | Quail Creek Drainage | Leonard | Curry | burned 31 | 27-Oct-2014 16:37:15 |
Long Ridge #3 6,7,9,10,10A Piles |
10/27/2014 1300 |
4,2,2,3,1 6 |
T38S R12W SEC 22 & 23 | Quail Creek Drainage | Leonard | Curry | burned 12 acres units complete | 28-Oct-2014 9:00:50 |
W-W 5 Piles |
10/23/2014 1100 |
4 3 |
T40S R12W Sec20 | Willow Creek | Geisler | Curry | 10-23-14 completed burn for 2 acres, leaving 4 acres left. | 29-Oct-2014 12:12:29 |
Eqine Piles |
11/6/2013 1200 |
3 2 |
T36S R13W S 24, 13 | Wildhorse LO | Hoffman | Curry | Slash from Timber Sale right of way. | 29-Oct-2014 12:23:09 |
Pyramid Thin 1,2,5,7 Piles |
11/11/14 1000 |
20 4 |
37S 13W 17 & 20 | Pistol River | Geisler | Curry | Machine piles/ All units complete | 11-Nov-2014 14:30 |
Pyramid Thin 11A,11B,12,13 Piles |
11/11/14 1000 |
5 3 |
37S 13W 30 &31 | Pistol River | Geisler | Curry | Machine piles. 10-28-14 completed 25 acres.85-25=60acres left. 11-3-14 15 acres, leaving 45 acres left. 11-10-14 burned 40 acres. 11-11-14 Units complete. | 11-Nov-2014 14:30:44 |
Pyramid Thin Pile Burning 3 Piles |
11/11/2014 0900 |
122 .5 |
T37S R13W S20/ T38S R13W S6 | Pistol River | Leonard | Curry | Hand and Landing piles. | 11-Nov-2014 14:35:02 |
Pyramid Thin Pile Burning 3, 14 Piles |
11/11/2014 0900 |
122 .5 |
T37S R13W S20/ T38S R13W S6 | Pistol River | Leonard | Curry | Hand and Landing piles. | 11-Nov-2014 14:35:48 |
Potato Patch 231 Piles |
11/18/2014 0900 |
27 .5 |
35S 13W sec 35 | 4 miles West of Lobster Crk Bridge | Mason | Curry | Mason will be RXB3 and contact # is 541-771-0780 completed on 11/18/14 | 18-Nov-2014 13:12:01 |
SOD Rx Brookings Piles |
02/19/2015 1100 |
1 4 |
T39s R12w Sec20 SWNE | Near Wilderness Retreat | Cory Betz | Curry | Swamper burning green material.Completed 1 of the 3 acres 2/17/15. Completed 1ac on 2/18/15 completed remaining 1ac on 2/19/15 | 19-Feb-2015 14:02:39 |
Backbone Thin Unit 21 Piles |
11/13/12 0930 |
56 15 |
39S 12W S 19 | Wilson Creek | Edwards | Curry | Machine Piles,11-20-2013 burned 10 acres | 15-Oct-2015 17:51:51 |
Backbone Thin Unit 22A and C Piles |
11/14/12 1100 |
26 15 |
39S 12W S 19 | Nook Creek | Hoffman | Curry | 11-13-12 completed 16 acres. 10 acres left | 15-Oct-2015 18:23:05 |
UC Thin Unit 5 Piles |
10/26/15 1100 |
10 3 |
T38S R12W Sec32&33 | Chetco | Stiener | Curry | completed 10/26/15 | 26-Oct-2015 15:37:03 |
UC Thin Unit 6 Piles |
10/26/15 1200 |
26 3 |
T38S R12W Sec35&34 | Quail Prairie Creek | Stiener | Curry | completed 10/26/15 | 26-Oct-2015 15:49:15 |
UC Thin Unit 1 Piles |
10/26/15 1200 |
77 3 |
T38S R12W Sec24 | Chetco | Stiener | Curry | 11-12-14 completed 60 acres, 10-26-15 completed last 17 acres. | 26-Oct-2015 17:54:11 |
Backbone Thin Unit 5 Piles |
10/26/15 1200 |
42 3 |
T39S R12W Sec29 | Chetco | Stiener | Curry | completed 5 acres 10/26/2015 | 26-Oct-2015 18:12:40 |
W-W Unit 28 Piles |
10/27/15 1200 |
6 2 |
T41S R11W Sec7 | 4th of July Creek | Keen | Curry | Completed all 6 acres 10/27/2015 | 27-Oct-2015 16:10:56 |
W-W Unit 30,31 Piles |
10/27/15 1200 |
19/12 4/4 |
T41S R11W Sec17&18 | 4th of July Creek | Keen | Curry | Completed both 30 and 31 for 31 acres 10/27/2015 | 27-Oct-2015 16:11:33 |
Tooth Thin Unit 3 Piles |
10/27/15 1200 |
19 5 |
T40S R11W Sec29 | N. Fork Smith River | Keen | Curry | Completed all 19 acres 10/27/2015 | 27-Oct-2015 16:12:47 |
Tooth Thin Unit 8,9,10 Piles |
10/27/15 1200 |
29/11/12 1/2/3 |
T40S R12W Sec1&2 | Wheeler Creek | Keen | Curry | Completed all units for 52 acres 10/27/2015 | 27-Oct-2015 16:13:23 |
W-W Unit 27 Piles |
10/27/15 1200 |
10 2 |
T40S R12W Sec36 | 4th of July Creek | Keen | Curry | Completed all 10 acres 10/27/2015 | 27-Oct-2015 16:48:35 |
Mineral Fork Unit 14,15,16,17,18,23 Piles |
10/27/15 1200 |
5/7/4/35/15/9 6/8/12/4/2 |
38S 12W Sec7 | Mineral Hill Fork | Geisler | Curry | Old Landing Piles. Completed all units for 75 acres. | 27-Oct-2015 17:44:20 |
Backbone Thin Unit 1,11 Piles |
10/28/15 1200 |
48/42 2/2 |
T39S R12W Sec22&28 | Chetco | Stiener | Curry | Completed all 90 acres 10/27/2015. | 27-Oct-2015 18:20:17 |
Backbone Thin Unit 16,19 Piles |
10/28/15 1200 |
10/36 3/3 |
T39S R12W Sec23&24 | Chetco | Stiener | Curry | completed unit 19 for 36 acres 10/26/2015. completed unit 16 for 10 acres. | 27-Oct-2015 18:20:42 |
Backbone Thin Unit 2,2A,3A Piles |
10/28/15 1200 |
29/12/18 3.5/3.5/3.5 |
T39S R12W Sec28&29 | Chetco | Stiener | Curry | completed 3A for 18 acres 10/26/2015. Completed units 2 and 2A for 41 acres 10/27/2015. | 27-Oct-2015 18:21:35 |
UC Thin Unit 2 Piles |
10/27/15 1200 |
63 3 |
T38S R12W Sec15&22 | Chetco | Stiener | Curry | Completed all 63 acres for 10/27/2015. | 27-Oct-2015 18:22:09 |
UC Thin Unit 3 Piles |
10/27/15 1200 |
81 3 |
T38S R12W Sec22 | Chetco | Stiener | Curry | 11-12-14 burned 40 acres, 10-26-15 completed 3 acres. Completed remaining 38 acres 10/27/2015 | 27-Oct-2015 18:23:26 |
W-W Unit 12 Piles |
10/28/15 1200 |
9 5 |
T40S R12W Sec19&30 | Wheeler Creek | Keen | Curry | completed unit for 9 acres | 28-Oct-2015 15:41:17 |
W-W Unit 22,23 Piles |
10/28/15 1200 |
5/3 2/3 |
T41S R12W Sec4&10 | Wheeler Creek | Keen | Curry | completed units for total of 8 acres | 28-Oct-2015 15:43:36 |
W-W Unit 35,36,37 Piles |
10/28/15 1200 |
40/32/14 3/3/3 |
T40S R12W Sec13&14 | Wheeler Creek | Keen | Curry | 10-28-15:Completed Units 35,36,37 for a total of 76 acres. 86 total acres for the 3 units and 5ac completed 1/21/15 | 28-Oct-2015 15:44:28 |
W-W Unit 6 Piles |
10/28/15 1200 |
18 3 |
T40S R12W Sec15 | Wheeler Creek | Keen | Curry | completed unit for 18 acres | 28-Oct-2015 16:10:13 |
Punt Thin Unit 11 Piles |
10/29/15 1200 |
37 7 |
T36S R13W Sec22 | Quosatana Creek | Geisler | Curry | Completed all 37 acres 10/29/2015 | 29-Oct-2015 14:15:53 |
Punt Thin Unit 8 Piles |
10/29/15 1200 |
55 1 |
T36S R13W Sec22 | Quosatana Creek | Geisler | Curry | Completed all 55 acres 10/29/2015 | 29-Oct-2015 14:16:14 |
Punt Thin Unit 7 Piles |
10/29/15 1200 |
33 5 |
T36S R13W Sec33 | Quosatana Creek | Geisler | Curry | Completed 33 acres 10/29/2015. | 29-Oct-2015 15:56:04 |
Long Ridge/Sorrel Unit 18 Piles |
10/29/15 1200 |
15 3 |
T36S R12 1/2W Sec 13 | Quosatana Creek | Geisler | Curry | Completed 15 acres, 10/29/2015 | 29-Oct-2015 16:33:10 |
Wildhorse Woodcutting Unit 1,2,3,4 Piles |
10/29/15 1200 |
1.5/.75/.5/.5 2/1.5/.5/.5 |
T36S R12W Sec8&34 | Lawson Creek | Stiener | Curry | Completed all units for 3 acres 10/29/2015. | 29-Oct-2015 16:47:53 |
Hobby Thin Unit 25 Piles |
11/05/15 1200 |
25 5 |
T35S R12W Sec 7 | Bridge Creek | Geisler | Curry | 11-4-15: burned 28 acres. completd unit for 25 acres 11-5-15 | 5-Nov-2015 15:03:32 |
Nook SOD 568 Piles |
2/25/16 0830 |
3 15 |
39S 12W S30 | Chetco Drainage | Harryman | Curry | SOD Treatment Contract. *.25 ac completed 2/11/16 *.25 ac completed 2/16/2016. *.25 ac completed 2/22/16.*.25 completed 2/23/2016. *.25 of an acre completed 2/24/16. | 26-Feb-2016 7:35:06 |
W-W Unit 16,18 Piles |
10/28/15 1200 |
14/23 3/2 |
T40S R12W Sec5&32 | Winchuck River | Keen | Curry | completed units #16 & 18, for 37 acres | 9-Oct-2016 14:31 |
Backbone Thin 18 Piles |
10/11/16 1300 |
65 1 |
T 39S R 12W Sec 22 | Chetco River | TBD | Curry | Unit Complete 10/11/16 | 11-Oct-2016 17:43:50 |
Backbone Thin 20 Piles |
10/11/16 1100 |
6 1 |
T 39S R 12W Sec 14 | Chetco River | TBD | Curry | Unit Complete 10/11/16 | 11-Oct-2016 17:44:08 |
Backbone Thin 20A Piles |
10/11/16 1100 |
1 1 |
T 39S R 12W Sec 14 | Chetco River | TBD | Curry | Unit Complete 10/11/16 | 11-Oct-2016 17:44:27 |
Backbone Thin 6B Piles |
10/11/16 1100 |
18 2 |
T 39S R 12W Sec 31 | Chetco River | TBD | Curry | Complete 10/11/16 | 11-Oct-2016 17:44:47 |
Punt Thin 6 Piles |
10/18/16 1100 |
7 3 |
T37S R13W Sec 33 | Hunter Creek | Geisler | Curry | 10-18-19: burned total acres for 7acres | 18-Oct-2016 13:04:05 |
Wheeler SOD 2 Piles |
10/12/2016 0830 |
41 15 |
T40S R12W Sec33 | Wheeler Creek | James Scott | Curry | 10/11/2016 completed 15acres 10/12/2016 completed wheeler 2 | 28-Sep-2017 19:30:31 |
Hobby Thin Unit 24 Piles |
11/06/17 1000 |
51 2.5 |
T34S R12W Sec 32,33 | Lake of the Woods | Geisler | Curry | 6-Nov-2017 17:53:34 | |
W-W 21 Piles |
11/06/17 1300 |
35 1 |
T40S R12W Sec 5 | Winchuck River | Cisneros | Curry | 6-Nov-2017 17:53:51 | |
W-W 34 Piles |
11/06/17 1100 |
24 1 |
T40S R12W Sec 19 | South Bank Chetco | Cisneros | Curry | 6-Nov-2017 17:53:59 | |
W-W 7 Piles |
11/06/17 1200 |
25 1 |
T40S R12W Sec 19 | South Bank Chetco | Cisneros | Curry | 6-Nov-2017 17:57:53 | |
Punt Thin 5 Piles |
11/7/17 1530 |
29 5 |
T37S R13W Sec 4 | Hunter Creek | Geisler | Curry | Unit complete 11/7/17 for 29 acres | 8-Nov-2017 7:56:12 |
Punt Thin 12 Piles |
11/7/17 1100 |
72 3 |
T36S R13W Sec 17,20 | Hunter Creek | Geisler | Curry | Unit complete 11/7/17 for 72 acres | 8-Nov-2017 7:56:31 |
Equine Thin 13 Piles |
11-8-17 1100 |
32 1.5 |
T36S R12W Sec 8 | Wildhorse | Geisler | Curry | 11-8: completed unit for 32 acres | 8-Nov-2017 14:18:35 |
Equine Thin 1 Piles |
11/08/17 1100 |
2 2 |
T36S R12W Sec 18 | Wildhorse | Geisler | Curry | 11-8:completed unit for 2 acres | 8-Nov-2017 14:24:02 |
Equine Thin 36 Piles |
11/08/17 1400 |
7 1 |
T36S R12W Sec 18 | Wildhorse | Geisler | Curry | 11-8: completed unit for 7 acres | 8-Nov-2017 14:24:58 |
Equine Thin 4 Piles |
11/08/17 1400 |
20 1 |
T36S R12 W Sec 18 | Wildhorse | Geisler | Curry | 11-8:completed unit for 20 acres | 8-Nov-2017 14:28:26 |
Equine Thin 35 Piles |
11/09/17 1300 |
47 2 |
T36S R12W Sec 7 | Wildhorse | Geisler | Curry | 11-8: burned 27 acres. 11-9-17: Completed unit with 20 acres | 9-Nov-2017 16:48:43 |
Long Ridge/Sorrel 19, 20 Piles |
11/09/17 1300 |
37/3 .2/.2 |
T36S R12 1/2W Sec 24 | Wildhorse | Geisler | Curry | 11-9-17: completed unit for total of 40 acres | 9-Nov-2017 16:49:21 |
Equine Thin 14 Piles |
11/09/17 1300 |
9 3.5 |
T36S R12W Sec 7 | Wildhorse | Geisler | Curry | 9-Nov-2017 18:19:34 | |
Oak Flat Fuels Treatment Piles |
11/18/17 0900 |
19 .5 |
T35S R11W Sec 29 | Oak Flat | Geisler | Curry | 18-Nov-2017 15:58:52 | |
Equine Thin 3 Piles |
11/18/17 1000 |
13 1 |
T36S R12 1/2W Sec 13 | Wildhorse | Geisler | Curry | 18-Nov-2017 17:33:01 | |
Backbone Thin 17 Piles |
8/20/17 1200 |
24 1.5 |
T39S R12W Sec22 | Chetco | Curry | Burned in Chetco Bar Fire | 3-Sep-2018 11:04:59 | |
Backbone Thin 23 Piles |
8/20/17 1200 |
11 2.5 |
T39S R12W Sec35 | Chetco | Curry | Burned by Chetco Bar fire | 3-Sep-2018 11:05:46 | |
Backbone Thin 3B Piles |
8/20/17 1200 |
12 2 |
T39S R12W Sec29 | Chetco | Curry | Burned by Chetco Bar fire | 3-Sep-2018 11:06:15 | |
Long Ridge/Sorrel 1 Broadcast |
8/20/17 1000 |
59 11 |
T 38S R 12W Sec 23 | Long Ridge | Curry | Burned by Chetco Bar fire | 3-Sep-2018 11:08:04 | |
Long Ridge/Sorrel 14 Broadcast |
8/20/17 1100 |
26 21 |
T 38S R 12W Sec 23 | Packers Cabin | Curry | Burned by Chetco Bar fire | 3-Sep-2018 11:08:37 | |
Tooth Thin 12 Piles |
9/1/17 1200 |
12 1 |
T40S R12W Sec 2 | Wheeler Ck. | TBD | Curry | Burned by Chetco Bar fire | 3-Sep-2018 11:11:31 |
Tooth Thin 13 Piles |
9/1/17 1200 |
6 1 |
T40S R12W Sec 2 | Wheeler Ck. | TBD | Curry | Burned by Chetco Bar fire | 3-Sep-2018 11:12:11 |
Tooth Thin 14 Piles |
9/1/17 1200 |
63 1 |
T40S R12W Sec 11 | Wheeler Ck. | TBD | Curry | Burned by Chetco Bar fire | 3-Sep-2018 11:12:36 |
Nook SOD 573 Piles |
9/1/17 1000 |
35 15 |
39S 12W S30 | Chetco Drainage | Brooks | Curry | Completed 1.75ac on 10/27/2016 Unit completed by the Chetco Bar fire around 9/1/17 | 3-Sep-2018 11:16:26 |
Nook SOD 586 Piles |
9/1/2017 1000 |
5 15 |
T39S R12W Sec29 | Chetco River | Steiner | Curry | Total 5ac; completed .5ac 10/28/2016 Unit completed by the Chetco Bar fire around 9/1/17 | 3-Sep-2018 11:19:40 |
Nook SOD 613 Piles |
11/30/16 0900 |
3 15 |
T 39S R 12W Sec30 | Chetco River | Steiner | Curry | Burned 1ac 11/4/2016; 2ac remain Unit complete 11/30/16 | 3-Sep-2018 12:54:26 |
Euchre Thin 3 Piles |
12/2/18 1100 |
48 2.5 |
T34S R13W Sec 7&18 | Euchre Ck. | Geisler | Curry | 12-2-18: completed 48 acres | 2-Dec-2018 15:47:26 |
Euchre Thin 2 Piles |
12/2/18 1000 |
20 1 |
T34S R13W Sec 19 | Euchre Ck. | Geisler | Curry | 12-2-18:completed 20 acres | 2-Dec-2018 15:48:16 |
BLT Thin 2 Piles |
12/3/18 1000 |
43 2.5 |
T34S R13W Sec 20 | Euchre Ck. | Geisler | Curry | Complete for 43 acres 12/3. | 3-Dec-2018 17:25:37 |
BLT Thin 3 Piles |
12/3/18 1000 |
8 2 |
T34S R13W Sec 21 | Euchre Ck. | Geisler | Curry | Completed for 8 acrs 12/3. | 3-Dec-2018 17:27:46 |
Euchre Thin 1 Piles |
12/3/18 1100 |
28 1.5 |
T34S R13W Sec 19 | Euchre Ck. | Geisler | Curry | Completed U#1 for 28ac 12/3. | 3-Dec-2018 17:29:27 |
Euchre Thin 10 Piles |
12/3/18 1300 |
13 1 |
T34S R13W Sec 8 | Euchre Ck. | Geisler | Curry | Completed U#10 for 13ac 12/3. | 3-Dec-2018 17:30:40 |
Euchre Thin 5 Piles |
12/3/18 1400 |
36 2 |
T34S R13W Sec 5,7,8 | Euchre Ck. | Geisler | Curry | Completed U#5 for 36ac 12/3. | 3-Dec-2018 17:32:18 |
Euchre Thin 7 Piles |
12/3/18 1500 |
9 2 |
T34S R13W Sec 6 | Euchre Ck. | Geisler | Curry | Completed U#7 for 9ac 12/3. | 3-Dec-2018 17:33 |
BLT Thin 1 Piles |
12/3/18 1400 |
58 2 |
T34S R13W Sec 19&20 | Euchre Ck. | Geisler | Curry | Completed U#1 for 52ac 12/3. | 3-Dec-2018 17:35:24 |
Agness Guard Fuels Treatment Piles |
12/04/18 1200 |
5 1 |
T35S R11W Sec 7 | Agness Guard | Jensen | Curry | Unit Complete | 4-Dec-2018 18:35:24 |
Winriver ATV Piles |
12/04/18 1400 |
4.5 2 |
T36S R12W Sec 8 | Wildhorse | Jensen | Curry | Unit Complete | 4-Dec-2018 18:48:20 |
Equine Thin 6 Piles |
12/6/18 1400 |
60 .75 |
T36S R12 1/2W Sec 36 | Wildhorse | Geisler | Curry | 12-6-18: completed 60 acres | 6-Dec-2018 14:55:19 |
Equine Thin 6A Piles |
12/6/18 1500 |
9 2.5 |
T36S R12 1/2W Sec 36 | Wildhorse | Geisler | Curry | 12-6-18: completed unit for 9 acres. | 6-Dec-2018 14:58:47 |
Equine Thin 7 Piles |
12/6/18 1000 |
6 .5 |
T36S R12 1/2W Sec 36 | Wildhorse | Geisler | Curry | 12-6-18: completed 6acres | 6-Dec-2018 15:01 |
Equine Thin 8 Piles |
12/6/18 1000 |
6 3.5 |
T36S R12 1/2W Sec 36 | Wildhorse | Geisler | Curry | 12-6-18 completed for 8 acres | 6-Dec-2018 15:01:28 |
Equine Thin 7A Piles |
12/618 1000 |
2 1 |
T36S R12 1/2W Sec 36 | Wildhorse | Geisler | Curry | 12-6-18; completed for 2 acres | 6-Dec-2018 15:01:51 |
Equine Thin 10 Piles |
12/6/18 1100 |
34 .5 |
T36S R13W Sec 36 | Wildhorse | Geisler | Curry | 12-6-18: completed unit for 34acres | 6-Dec-2018 15:03:13 |
Equine Thin 9 Piles |
12/6/18 1000 |
18 .5 |
T36S R13W Sec 36 | Wildhorse | Geisler | Curry | 12-6-18: completed unit for 18acres | 6-Dec-2018 15:03:45 |
Equine Thin 38 Piles |
12/6/18 1600 |
31 2 |
T36S R12 1/2W Sec 13 | Wildhorse | Geisler | Curry | 12-6-18 completed 31 acres | 6-Dec-2018 15:44:33 |
Equine Thin 39 Piles |
12/6/18 1600 |
32 3 |
T36S R12 1/2W Sec 24 | Wildhorse | Geisler | Curry | 12-6-18: completed for 32 | 6-Dec-2018 15:45:20 |
Equine Thin 37 Piles |
12/6/18 1400 |
44 2.5 |
T36S R12 1/2W Sec 13 | Wildhorse | Geisler | Curry | 11-8:burned 4 acres. 12-6-18:completed unit for 44 acres | 6-Dec-2018 16:05:53 |
Equine Thin 5 Piles |
12/6/18 1000 |
11 2 |
T36S R12 1/2W Sec 25 | Wildhorse | Geisler | Curry | 12-6-18: completed unit for 11 acres | 6-Dec-2018 17:12:24 |
Equine Thin 12 Piles |
12/7/18 1000 |
18 1 |
T36S R12W Sec 30 | Wildhorse | Geisler | Curry | Unit Complete | 6-Dec-2018 19:10:12 |
Bullet Piles |
12/7/18 1200 |
5.5 2 |
T36S R12W Sec 7 | Wildhorse | Geisler | Curry | Unit Complete | 7-Dec-2018 19:13:42 |
Eohippus 2 Piles |
12/7/18 1200 |
6 2 |
T36S R12W Sec 7 | Wildhorse | Geisler | Curry | Unit Complete | 7-Dec-2018 19:13:56 |
Equine Thin 2 Piles |
12/7/18 1000 |
11 3 |
T36S R12W Sec 18 | Wildhorse | Geisler | Curry | Unit Complete | 7-Dec-2018 19:14:10 |
Equine Thin 20 Piles |
12/7/18 1000 |
4 1 |
T37S R13W Sec 1 | Wildhorse | Geisler | Curry | Unit Complete | 7-Dec-2018 19:14:26 |
Equine Thin 26 Piles |
12/7/18 1200 |
18 2 |
T36S R12W Sec 19 | Wildhorse | Geisler | Curry | Completed 5 acres on 12/6/18; Unit Complete 12/7/18 | 7-Dec-2018 19:15:02 |
Punt Thin 2 Piles |
12/7/18 1500 |
34 3 |
T37S R13W Sec 4 | Hunter Creek | Geisler | Curry | Unit Complete | 7-Dec-2018 19:19:35 |
Punt Thin 3 Piles |
12/7/18 1500 |
13 1 |
T37S R13W Sec 9 | Hunter Creek | Geisler | Curry | 33 acres total. 10/21/16, 20 acres burned. 12/7/18 13 acres burned, unit Complete | 7-Dec-2018 19:20:49 |
Punt Thin 4 Piles |
12/7/18 1500 |
41 4 |
T37S R13W Sec 9 | Hunter Creek | Geisler | Curry | Unit Complete | 7-Dec-2018 19:21:03 |
Taylor Ranch ATV Piles |
12/6/18 1000 |
9.5 2 |
T36S R12W Sec 7 | Wildhorse | Geisler | Curry | Completed 5 acres on 12/4/18; 4.5 acres burned 12/7/18, unit complete | 7-Dec-2018 19:22:13 |
Equine Thin 17 Piles |
12/7/18 1400 |
23 1 |
T36S R12W Sec 5 | Wildhorse | Geisler | Curry | 12/4/18 15ac completed of the 23ac w/8ac remaining. 12/7/18 8ac burned, unit complete | 7-Dec-2018 19:26 |
Chetco Bar Danger Tree Piles |
12/8/18 1000 |
85 2 |
T39S R12W Sec 20,29,30 | Chetco River | Geisler | Curry | Unit Complete | 8-Dec-2018 17:08:13 |
Corrals Meadow Piles |
11/01/18 1200 |
30 .5 |
T35S R10 1/2W Sec 7 | Burnt Ridge | TBD | Curry | This unit was burned in the Klondike Fire on 10/14/18 | 8-Dec-2018 17:09:04 |
Punt Thin 1 Piles |
12/7/18 1500 |
73 2 |
T37S R13W Sec 8,17 | Hunter Creek | Geisler | Curry | 11/9/17 burned 23 acres; 11/11/17 burned 15 acres; 12/7/18 burned 25 acres; 10 acres remaining; unit complete 12/13/18 | 13-Dec-2018 16:16:06 |
Hobby Thin 22 Piles |
11/06/17 1300 |
93 2 |
T35S R12W Sec 5,6,7 | Lake of the Woods | Geisler | Curry | 11/6/17 Unit complete for a total of 298 acres | 1-Oct-2019 7:34:30 |
Equine 6 Broadcast |
10/11/19 1000 |
54 18 |
T 36S R 12 1/2W Sec36 | Approx 3 mi South of Wildhorse Campground | Keith Smith | Curry | 10-11-2019: Burned 54 acres | 11-Oct-2019 16:53:06 |
Sorrel Meadow Broadcast |
10/12/19 1100 |
70 19 |
T 36S R 12 1/2W Sec13&24 | Approx .5 mi South of Wildhorse Campground | Cisneros | Curry | Completed 60 acres on 10/11/19. Completed the remaining 10 acres on 10/12/19 | 12-Oct-2019 19:07:15 |
Equine 17 Piles |
10/17/19 1000 |
10 .5 |
T36S R12W Sec 5 | Wildhorse | Geisler | Curry | Completed 10/17/19 | 17-Oct-2019 17:17:36 |
Equine 20 Piles |
10/17/19 1300 |
4 .5 |
T37S R13W Sec 1 | Wildhorse | Cisneros | Curry | Completed 10/17/19 | 21-Nov-2019 7:58:19 |
Packer Salvage Area #1 Piles |
11/23/19 1600 |
60 1.5 |
T38S R12W Sec 32,33 | Chetco River | Geisler | Curry | Competed all 60 acres | 23-Nov-2019 16:40:03 |
Mineral Salvage Area #6 Piles |
12/3/19 0900 |
4 6 |
T38S R13W Sec 35 | Chetco River | Geisler | Curry | Unit complete 12/3/19 | 3-Dec-2019 19:10:24 |
Mineral Salvage Area #1 Piles |
12/3/19 0900 |
8 7 |
T38S R12W Sec 21,28 | Chetco River | Jensen | Curry | Unit complete 12/3/19 | 3-Dec-2019 19:10:40 |
Mineral Salvage Area #2 Piles |
12/3/19 1000 |
29 7 |
T38S R12W Sec 9,10,16 | Chetco River | Jensen | Curry | Unit complete 12/3/19 | 3-Dec-2019 19:10:55 |
Mineral Salvage Area #3 Piles |
12/4/19 1000 |
20 7 |
T38S R12W Sec 2,3 | Chetco River | Jensen | Curry | Unit Complete 12/4/19 | 3-Dec-2019 19:49:48 |
Panther Salvage Area #1 Piles |
12/4/19 1000 |
37 2 |
T39S R12W Sec 7 | Chetco River | Jensen | Curry | Unit complete 12/4/19 | 4-Dec-2019 18:21:07 |
Mineral Salvage Area #4 Piles |
12/4/19 1200 |
11 2 |
T38S R12W Sec 6 | Chetco River | Geisler | Curry | Completed 12/4/19 | 4-Dec-2019 18:21:51 |
Mineral Salvage Area #5 Piles |
12/4/19 1200 |
3 9 |
T38S R13W Sec 14,24 | Chetco River | Geisler | Curry | Completed 12/4/19 | 4-Dec-2019 18:22:01 |
Stack Salvage Area #4 Piles |
12/4/19 1300 |
51 4 |
T38S R12W Sec 7,18 | Chetco River | Geisler | Curry | Completed 12/4/19 | 4-Dec-2019 18:22:48 |
Stack Salvage Area #5 Piles |
12/4/19 1000 |
30 6 |
T38S R13W Sec 14,15 | Chetco River | Geisler | Curry | Completed 32 acres of 62 on 12/3/19. Completed remaining acres 12/4/19. | 4-Dec-2019 18:23:22 |
Basin Salvage Area #3 Piles |
12/5/19 1300 |
139 2 |
T39S R12 1/2W Sec 14 | Chetco River | Jensen | Curry | Completed 12/5/19 | 5-Dec-2019 19:24:18 |
Basin Salvage Area #4 Piles |
12/5/19 1400 |
160 2 |
T39S R12 1/2W Sec 13 | Chetco River | Jensen | Curry | Completed 12/5/19 | 5-Dec-2019 19:24:35 |
Packer Salvage Area #2 Piles |
12/5/19 1000 |
58 .5 |
T38S R12W Sec 23,24 | Chetco River | Geisler | Curry | Completed 12/5/19 | 5-Dec-2019 19:24:49 |
Packer Salvage Area #3 Piles |
12/5/19 1000 |
10 1 |
T38S R11W Sec 30 | Chetco River | Geisler | Curry | 14 of 24 acres completed 11/23/19. Completed all acres 12/5/19. | 5-Dec-2019 19:25:51 |
Packer Salvage Area #4 Piles |
12/5/19 1200 |
48 1 |
T39S R11W Sec 6,7 | Chetco River | Geisler | Curry | 40 of 88 acres completed 11/2319. Completed all acres 12/5/19. | 5-Dec-2019 19:26:26 |
Packer Salvage Area #5 Piles |
12/5/19 1200 |
5 3 |
T39S R12W Sec 2,3,9 | Chetco River | Geisler | Curry | Completed 60 acres 11/22/19. 22 of 27 ac 11/23/19. Completed all acres 12/5/19. | 5-Dec-2019 19:27:22 |
Snaketooth Salvage Area #1 Piles |
12/5/19 1400 |
102 3 |
T39S R12W Sec 28 | Chetco River | Geisler | Curry | Completed 12/5/19 | 5-Dec-2019 19:27:39 |
Snaketooth Salvage Area #2 Piles |
12/6/19 0900 |
62 3 |
T39S R12W Sec 25 | Chetco River | Geisler | Curry | Unit complete 12/6/19. | 6-Dec-2019 14:28:44 |
Hobby Thin 29 Piles |
12/10/19 1300 |
40 2 |
T34S R12W Sec 23&24 | Lake of the Woods | Geisler | Curry | Unit complete 12/10/19 | 10-Dec-2019 16:44:46 |
Hobby Thin 30 Piles |
12/10/19 1500 |
6 2.5 |
T34S R12W Sec 24 | Lake of the Woods | Geisler | Curry | Unit complete 12/10/19 | 10-Dec-2019 16:45:08 |
Kimball Thin 1 Piles |
12/10/19 1000 |
24 1 |
T36S R13W Sec 8 | Rogue River | Geisler | Curry | Unit complete 12/10/19 | 10-Dec-2019 16:45:49 |
Kimball Thin 2 Piles |
12/10/19 1200 |
23 2 |
T36S R13W Sec 8 | Rogue River | Geisler | Curry | Unit complete 12/10/19 | 10-Dec-2019 16:46:11 |
Kimball Thin 3 Piles |
12/10/19 1200 |
14 2 |
T36S R13W Sec 8 | Rogue River | Geisler | Curry | Unit complete 12/10/19 | 10-Dec-2019 16:46:24 |
Kimball Thin 5 Piles |
12/10/19 1100 |
11 .5 |
T36S R13W Sec 8 | Rogue River | Geisler | Curry | Unit complete 12/10/19 | 10-Dec-2019 16:47:25 |
Kimball Thin 6 Piles |
12/10/19 1200 |
62 2 |
T36S R13W Sec 8 | Rogue River | Geisler | Curry | Unit complete 12/10/19 | 10-Dec-2019 16:47:39 |
Kimball Thin 7 Piles |
12/10/19 0900 |
29 1.5 |
T36S R13W Sec 8 | Rogue River | Geisler | Curry | Unit complete 12/10/19 | 10-Dec-2019 16:47:48 |
Hobby Thin 26 Piles |
12/11/19 0900 |
28 3 |
T34S R12W Sec 34 | Lake of the Woods | Geisler | Curry | Completed 12/11/19 | 11-Dec-2019 17:10:58 |
Spud Road Fuels Treatment Piles |
2/29/20 1000 |
56 5 |
T35S R11W Sec 18,19 | Agness | Geisler | Curry | Burned 10 acres 2/25/2020.Burned 90 acres 2/26/2020. Burned remaining 56 acres, unit completed on 2/29/2020 | 29-Feb-2020 18:13:43 |
Lobster ATV T5 Piles |
3/9/20 1300 |
10 5 |
T36S R12 W Sec 19 | Wildhorse | Bordelon | Curry | Unit Complete 3/9/2020 | 9-Mar-2020 16:29:14 |
Basin Salvage Area #2 Piles |
12/5/19 1000 |
38 3 |
T39S R12 1/2W Sec 15 | Chetco River | Jensen | Curry | 40 of 78 acres burned 11/24/19. Unit complete 12/5/19. | 28-Aug-2020 11:40:36 |
Nook SOD 610 Piles |
10/29/16 0900 |
10 15 |
T 39S R 12W Sec30 | Chetco River | Jensen | Curry | 1-Oct-2020 16:37:30 | |
Nook SOD West & East Piles |
11/4/2016 0900 |
4 6 |
T39S R12W Sec30 | Chetco Drainage | TBD | Curry | 1-Oct-2020 16:40:29 | |
Nook Bar Piles |
10/13/2016 0900 |
10 |
39S 12W Sec30 | Chetco Corridor | Wheeler trainee | Curry | 1-Oct-2020 16:41:19 | |
Wheeler SOD 579 Piles |
11/4/2017 0900 |
6 15 |
40S 12W S29 | Wheeler Creek | TBD | Curry | Burned .5ac 10/30/16; burned 1ac 11/1/16; burned 1.5ac 11/2/16; burned 1ac 11/3/16 | 1-Oct-2020 16:45:54 |
Wheeler SOD 3 Piles |
10/12/17 0830 |
7 15 |
T40S R12W Sec33 | Wheeler Creek | TBD | Curry | 1-Oct-2020 16:49:44 | |
Long Ridge GNA Salvage Area #1 Piles |
11/16/20 1000 |
90 2 |
T 38S R12W Sec 22 | Chetco River | Geisler | Curry | Completed all acres 11/16/2020 | 17-Nov-2020 9:20:45 |
Long Ridge GNA Salvage Area #2 Piles |
11/16/20 1200 |
89 1.5 |
T 38S R12W Sec 13 | Chetco River | Geisler | Curry | Completed all acres 11/16/2020 | 17-Nov-2020 9:21:11 |
Eohippus 5A Piles |
11/20/20 0900 |
28 5 |
T36S R12 W Sec 18 | Wildhorse | Geisler | Curry | Unit Complete 11/20/20 | 20-Nov-2020 17:31:48 |
Equine Thin 32 Piles |
11/20/20 1400 |
47 6 |
T 36S R 12W Sec 6 | Rogue River | Geisler | Curry | Unit Complete 11/20/20 | 20-Nov-2020 17:32:18 |
Too Wild FR 1 Piles |
11/20/20 1200 |
15 5 |
T36S R12 1/2W Sec 36 | Wildhorse | Geisler | Curry | Completed 60 acres on 11/19/20. Completed remaining 15 acres on 11/20/20. | 20-Nov-2020 17:33:36 |
Basin Salvage Area #1 Piles |
11/21/20 1000 |
60 2 |
T39S R12 1/2W Sec 22 | Chetco River | Geisler | Curry | Completed 70 of 130 acres 12/5/19.Completed remaining 60 acres on 11/21/20. | 21-Nov-2020 18:57:09 |
Snaketooth Salvage Area #3 Piles |
11/21/20 1000 |
84 .5 |
T40S R12W Sec 18 | Wheeler Creek | Geisler | Curry | Unit complete 11/21/20. | 21-Nov-2020 18:57:49 |
Packer FMZ 12 Piles |
11/22/20 1500 |
9 8 |
T 39S R 11W Sec 8 | Devils Backbone | Geisler | Curry | Unit complete on 11/22/20. | 22-Nov-2020 19:41:17 |
Packer FMZ 7 Piles |
11/22/20 1300 |
37 7 |
T 38S R 11W Sec 31 | Quail Prairie | Geisler | Curry | Unit complete on 11/22/20. | 22-Nov-2020 19:43:05 |
Hobby Thin 21 Piles |
11/23/20 1000 |
38 5 |
T 34S R 13W Sec 25 | Lobster Ck. | Geisler | Curry | Unit Complete 11/23/20. | 23-Nov-2020 17:33:33 |
Hobby Thin 23 Piles |
11/23/20 1100 |
24 6 |
T 35S R 12W Sec 5 | Lake of the Woods | Geisler | Curry | Unit Complete 11/23/20. | 23-Nov-2020 17:33:41 |
Hobby Thin 27 Piles |
11/23/20 1300 |
25 6 |
T 34S R 12W Sec 27 | Lobster Creek | Geisler | Curry | Unit Complete 11/23/20. | 23-Nov-2020 17:33:48 |
Hobby Thin 28 Piles |
11/23/20 1400 |
5 5 |
T 34S R 12W Sec 27 | Lobster Creek | Geisler | Curry | Unit Complete 11/23/20. | 23-Nov-2020 17:33:56 |
Tooth Thin 15 Piles |
11/23/20 1300 |
23 1 |
T 40S R 12W Sec 10 | Emily Ck. | Ernst | Curry | Unit Complete 11/23/20. | 23-Nov-2020 17:34:11 |
Tooth Thin 16 Piles |
11/23/20 1300 |
18 4 |
T 40S R 12W Sec 10 | Emily Ck. | Ernst | Curry | Unit Complete 11/23/20. | 23-Nov-2020 17:34:21 |
Sorrel Meadow 18 Piles |
11/24/20 1200 |
4 2 |
T36S R12 1/2W Sec 13 | Wildhorse | Geisler | Curry | Completed 13 acres on 11/20/20. Completed remaining 4 acres on 11/24/20. | 24-Nov-2020 15:21:32 |
Kimball Thin 4 Piles |
12/08/20 1000 |
10 1 |
T36S R13W Sec 8 | Rogue River | Ernst | Curry | Completed 47 of 57 acres 12/10/19. Completed remaining 10 acres on 12/8/2020. | 8-Dec-2020 10:21:21 |
Equine Thin 33 Piles |
12/08/20 1200 |
8 6 |
T 36S R 12W Sec 5 | Rogue River | Ernst | Curry | Unit Completed on 12/8/2020 | 8-Dec-2020 13:02:57 |
Equine Thin 31 Piles |
12/08/20 1500 |
12 10 |
T 35S R 12W Sec 31 | Rogue River | Ernst | Curry | Unit completed on 12/8/2020 | 8-Dec-2020 16:50:02 |
Equine Thin 34 Piles |
12/08/20 1200 |
32 6 |
T 35S R 12W Sec 33 | Rogue River | Ernst | Curry | Unit completed on 12/8/2020 | 8-Dec-2020 16:50:14 |
Foster Bar Fuels Treatment Piles |
12/9/20 1000 |
15 4 |
T 34S R 11W Sec 18 | Foster Bar | Geisler | Curry | Unit Completed 12/9/2020. | 9-Dec-2020 18:13:22 |
Big Bend Fuels Treatment Piles |
12/10/20 1000 |
34 4.5 |
T 34S R 11W Sec 7,18 | Big Bend | Geisler | Curry | Unit completed on 12/10/2020. | 10-Dec-2020 19:07:08 |
Illahe Fuels Treatment 2 Piles |
12/10/20 1200 |
15 3 |
T 34S R 11W Sec 8 | Big Bend | Geisler | Curry | Unit completed on 12/10/2020. | 10-Dec-2020 19:07:40 |
Illahe Fuels Treatment 3 Piles |
12/10/20 1500 |
7 6 |
T 34S R 11W Sec 8 | Big Bend | Geisler | Curry | Completed 10 acres on 12/9/2020. Completed remaining 7 acres on 12/10/2020. | 10-Dec-2020 19:08:52 |
Illahe Fuels Treatment 1 Piles |
12/11/20 0900 |
50 4 |
T 34S R 11W Sec 7 | Big Bend | Geisler | Curry | Unit completed on 12/11/2020. | 11-Dec-2020 17:12:50 |
Packer FMZ 1, 2 Piles |
3/24/21 1000 |
2, 0 7, 7 |
T 38S R 12W Sec 23,24 | Long Ridge | Dave Ernst | Curry | Completed unit 2 for 6 acres on 11/21/20. Completed 7 acres on unit 1 11/22/20. Completed 5 acres on unit 1 12/14/2020. Completed remaining 2 acres on 3/24/2021. | 25-Mar-2021 12:24:37 |
Packer FMZ 4, 4a Piles |
3/24/21 1200 |
10, 4 7, 7 |
T 38S R 11W Sec 30 | Quail Prairie | Dave Ernst | Curry | Completed 10 acres of unit 4 on 11/21/20.Completed 6 acres of unit 4 on 11/22/20. Completed 1 acre of unit 4a on 3/2/21. Completed remaining acres on both units 3/24/2021. | 25-Mar-2021 12:26:01 |
Kimball Fuels 2 Piles |
10/15/21 1000 |
59 2.5 |
T. 36S R. 13W Sec. 8 | Kimball Hill | Geisler | Curry | 15-Oct-2021 18:31:59 | |
Fairview Meadow Piles |
10/16/21 1000 |
8 2 |
T. 37S R. 12 1/2W Sec. 24 | Snow Camp | Geisler | Curry | 17-Oct-2021 7:39:30 | |
Kimball Fuels 3 Piles |
10/17/21 1000 |
16 7 |
T. 36S R. 13W Sec. 8 | Kimball Hill | Dave Ernst | Curry | 17-Oct-2021 18:36:45 | |
Snaketooth FMZ 4 Piles |
10/17/21 1400 |
21 1.5 |
T. 39S R. 12W Sec. 23, 26 | Chetco River | Geisler | Curry | 17-Oct-2021 18:37:29 | |
Snaketooth FMZ 6 Piles |
10/17/21 1300 |
3 1.5 |
T. 39S R. 12W Sec. 25 | Chetco River | Geisler | Curry | 17-Oct-2021 18:37:42 | |
Wildhorse Fuels 3 Piles |
10/17/21 1000 |
29 3 |
T. 36S R. 12W Sec. 18 | Wildhorse | Dave Smith | Curry | Completed 6 acres on 10/16/21. Unit complete on 10/17/21. | 17-Oct-2021 18:48:28 |
Green Knob 10 Piles |
10/18/21 1000 |
28 5.5 |
T. 34S R. 11W Sec. 28 | Bearcamp | Dave Smith | Curry | 18-Oct-2021 19:21:09 | |
Snaketooth FMZ 3 Piles |
10/18/21 1500 |
8 1 |
T. 39S R. 12W Sec. 22 | Chetco River | Geisler | Curry | 18-Oct-2021 19:24:31 | |
Snaketooth FMZ 5 Piles |
10/18/21 1400 |
3 1.5 |
T. 39S R. 12W Sec. 35 | Chetco River | Geisler | Curry | 18-Oct-2021 19:24:40 | |
Snaketooth FMZ 7 Piles |
10/18/21 1600 |
3 1 |
T. 39S R. 12W Sec. 21 | Chetco River | Geisler | Curry | 18-Oct-2021 19:24:47 | |
Snaketooth FMZ 8 Piles |
10/18/21 1030 |
5 1.5 |
T. 39S R. 12W Sec. 28 | Chetco River | Geisler | Curry | 18-Oct-2021 19:24:53 | |
Tooth Thin 4 Piles |
10/18/21 1000 |
12 8 |
T. 40S R. 11W Sec. 20 | Winchuck River | Dave Ernst | Curry | 18-Oct-2021 19:25:04 | |
Tooth Thin 7 Piles |
10/18/21 1300 |
26 5 |
T. 40S R. 11W Sec. 16 | Winchuck River | Dave Ernst | Curry | 18-Oct-2021 19:25:09 | |
Equine Thin 11 Piles |
10/19/21 1000 |
20 12.5 |
T. 37S R. 13W Sec. 2 | Hunter Creek | Dave Ernst | Curry | 20-Oct-2021 16:16:23 | |
Equine Thin 15 Piles |
10/20/21 1000 |
33 8.5 |
T. 37S R. 13W Sec. 2, 11 | Hunter Creek | Dave Ernst | Curry | 20-Oct-2021 16:16:30 | |
Equine Thin 16 South Piles |
10/20/21 1000 |
11 1 |
T. 37S R. 13W Sec. 2 | Hunter Creek | Dave Ernst | Curry | 20-Oct-2021 16:16:39 | |
Green Knob 5 Piles |
10/20/21 1000 |
14 2.5 |
T. 34S R. 11W Sec. 34 | Bearcamp | Geisler | Curry | 20-Oct-2021 16:16:46 | |
Green Knob 8 Piles |
10/20/21 1100 |
17 5.5 |
T. 34S R. 11W Sec. 28 | Bearcamp | Geisler | Curry | Completed 10 acres on 10/18/21. Completed remaining 7 acres on 10/20/21. | 20-Oct-2021 16:17:58 |
Oak Flat Fuels 1 Piles |
11/5/21 1000 |
61 5 |
T 35S R 11W Sec 20 | Agness | David Ernst | Curry | Completed 40 acres on 11/4/21. Remaining acres completed on 11/5/21. | 5-Nov-2021 16:11:44 |
Winchuck East SOD 692 Piles |
12/1/21 0900 |
39 8 |
T 40S R 12W Sec 34 | Winchuck River | Dave Ernst | Curry | Completed 2 acres on 11/22/21. Completed 6 acres on 11/23/21. Completed 12 acres on 11/24/21. Completed 15 acres on 11/29/21. Completed 3 acres on 11/30/21. Completed remaining acre on 12/1/21. | 1-Dec-2021 19:11:28 |
Chetco River SOD 756 Piles |
3/24/22 0900 |
13 7 |
T 39S R 12W Sec 31 | Chetco River | Dave Ernst | Curry | 24-Mar-2022 15:25:14 | |
Redwood SOD 803 Piles |
3/25/22 0900 |
5 4 |
T 40S R 13W Sec 13 | Chetco River | Dave Ernst | Curry | 25-Mar-2022 14:15:14 | |
Nook SOD 618 Piles |
10/28/16 |
4 15 |
T 39S R 12W Sec30 | Chetco River | Steiner | Curry | Total 4ac; completed 1.5ac 10/28/2016 | 31-Oct-2022 15:49 |
Equine TS Unit 11 Piles |
11-3-2022 1000 |
8 1.88 |
T37S R13W Sec 2 | Lower Rogue N42º 24.132’ W124º 13.082’ 3680 and 1503 Road | Geisler | Curry | Harvest Related Treatment. Fuels generated as a result of timber sale related activities including machine piled landing slash. | 3-Nov-2022 16:28:44 |
Equine TS Unit 15 Piles |
11-3-2022 1100 |
2 7.99 |
T37S R13W Sec 2 & 11 | Lower Rogue N42º 23.838’ W124º 13.005’ 3680 Rd & 1503 Rd | Geisler | Curry | Machine Piles. | 3-Nov-2022 16:29:48 |
Equine TS Unit 16N Piles |
11-3-2022 1100 |
22 4.4 |
T37S R13W Sec 2 | Lower Rogue N42º 23.892’ W124º 12.815’ 3680 & 1503 Rd | Geisler | Curry | Machine Piles. | 3-Nov-2022 16:32:46 |
Tooth TS Unit 2 Piles |
11/4/22 0930 |
11 4.2 |
T40S R11W Sec 29 | Winchuck River near Red Mountain | Geisler / Larrimore (T) | Curry | Completed 11-4-2022 All Acres. N42º 03.477’ W124º 01.535’ Harvest Related Treatment. Fuels generated as a result of timber sale related activities including machine piled landing slash and hand piles. | 4-Nov-2022 14:58:28 |
Tooth TS Unit 7 Piles |
11/4/22 0930 |
13 4.3 |
T40S R11W Sec 16 | Winchuck River near Red Mountain | Geisler / Larrimore (T) | Curry | Completed All Acres 11-4-2022 N42º 05.143’ W124º 00.702’ Harvest Related Treatment. Fuels generated as a result of timber sale related activities including machine piled landing slash. | 4-Nov-2022 14:58:51 |
Winchuck SOD 787 Piles |
11-9-2022 1000 |
8 5 |
T 41S R 12W Sec 10 | Winchuck River 1106 Road N42º 1.207’ W124º 6.505’ | Geisler / Larrimore (T) | Curry | NON-HARVEST RELATED TREATMENTS- Multiple Tan Oak trees have been identified as being infected with Sudden Oak Death (phytophthora ramorum) Map: https://ftp.wildfire.gov/public/incident_specific_data/Fuels/OR_RSF/Gold_Beach_RD/Mobile_Maps/ Non WUI | 9-Nov-2022 18:10:21 |
Chimney Camp SOD 769 Piles |
11-10-2022 0900 |
2 7 |
T40S R12W Sec 34 | Winchuck River Area: Chimney Camp South Trail N42º 2.675’ W124º 6.777’ | Geisler | Curry | NON-HARVEST RELATED TREATMENTS- Multiple Tan Oak trees have been identified as being infected with Sudden Oak Death (phytophthora ramorum) Map: https://ftp.wildfire.gov/public/incident_specific_data/Fuels/OR_RSF/Gold_Beach_RD/Mobile_Maps/ Non WUI Total unit acres 7. Completed 5 ac on 11/9/22. Completed 2 ac on 11/10/22 | 10-Nov-2022 17:57:55 |
Chimney Camp SOD 790 Piles |
11-11-2022 0900 |
21 6 |
T40S R12W Sec 28 & 33 | Winchuck River Area: N42º 3.115’ W124º 7.088’ Chimney Camp North Trail | Geisler/ Larrimore (T) | Curry | NON-HARVEST RELATED TREATMENTS- Multiple Tan Oak trees have been identified as being infected with Sudden Oak Death (phytophthora ramorum) Map: https://ftp.wildfire.gov/public/incident_specific_data/Fuels/OR_RSF/Gold_Beach_RD/Mobile_Maps/ Non WUI Total unit acres 56. Completed 35 ac on 11/10/22. Completed 21 ac on 11/11/22. | 11-Nov-2022 15:17:59 |
Punt Timber Sale Unit 9 Piles |
12/01/2022 0900 |
8 5 |
T36S R13W Sec 3, 10 | Lower Rogue 3313 Rd N42º 28.518’ W124º 14.065’ | Ernst | Curry | Non WUI. Harvest Related Treatment. Fuels generated as a result of timber sale related activities including machine piled landing slash and Hand Piles. 11-2-2022 Accomplished 45 Acres. 11-3-2022 Accomplished 50 Acres. Original Acres 103. Completed remaining 8 acres on 12/1/22. | 1-Dec-2022 15:39:23 |
Punt Timber Sale Unit 10 Piles |
12/02/2022 1000 |
6 2.7 |
T36S RT13W Sec 21 | 3313 Road. N42º 26.755’ W124º 14.827 Lower Rogue | Ernst/Larrimore Trainee | Curry | Non WUI. Harvest Related Treatment. Fuels generated as a result of timber sale related activities including machine piled landing slash and hand piles. Total unit acres 22. Completed 16 acres on 12/1/22. Completed final 6 acres 12/2/22 | 2-Dec-2022 14:16:15 |
Salmon Creek SOD 771 Piles |
12/5/2022 0900 |
25 6 |
T41S R12W Sec 10 | 1107 Rd Winchuck River N42º 0.857’ W124º 6.807’ | Geisler | Curry | WUI: Adjacent Landowners contacted. NON-HARVEST RELATED TREATMENTS- Multiple Tan Oak trees have been identified as being infected with Sudden Oak Death (phytophthora ramorum) within units 770, 771. Following National Forest System Invasive Management Policy FR Vol.76 No 233, 2011 the units will be treated to eradicate SOD from the area. | 5-Dec-2022 16:19:24 |
Deer Creek SOD 661 Piles |
12/7/22 1000 |
17 8 |
T 41S R 12W Sec 5 | 1107 Winchuck River Road N42º 1.547’ W124º 8.313’ | Geisler | Curry | WUI: Adjacent Landowners Contacted. NON-HARVEST RELATED TREATMENTS- Multiple Tan Oak trees have been identified as being infected with Sudden Oak Death (phytophthora ramorum) within unit 661. Following National Forest System Invasive Management Policy FR Vol.76 No 233, 2011 the units will be treated to eradicate SOD from the area. | 7-Dec-2022 17:24:33 |
Winchuck North SOD 650 Piles |
12/7/22 1200 |
21 4 |
T 41S R 12W Sec 9 | 1107 Winchuck River Road N42º 1.282’ W124º 8.016’ | Geisler | Curry | NON-HARVEST RELATED TREATMENTS- Multiple Tan Oak trees have been identified as being infected with Sudden Oak Death (phytophthora ramorum) Map: https://ftp.wildfire.gov/public/incident_specific_data/Fuels/OR_RSF/Gold_Beach_RD/Mobile_Maps/ | 7-Dec-2022 17:24:57 |
Elk Creek SOD 770 Piles |
12/7/2022 1445 |
12 5 |
T41S R12W Sec 5 | 1107 Road Winchuck River N42º 0.933’ W124º 7.310’ | Geisler | Curry | WUI: Adjacent Landowners Contacted. NON-HARVEST RELATED TREATMENTS- Multiple Tan Oak trees have been identified as being infected with Sudden Oak Death (phytophthora ramorum) within units 770, 771. Following National Forest System Invasive Management Policy FR Vol.76 No 233, 2011 the units will be treated to eradicate SOD from the area. Total acres 37. Completed 25 acres on 12/6/22. Completed remaining 12 acres on 12/7/22. | 7-Dec-2022 17:26:14 |
Myrtle Tree SOD 821 Piles |
12/11/22 0900 |
17 7 |
T 35S R 13W Sec 31 | Rogue River-Myrtle Tree Trail N42º 30.222’ W124º 17.193 | Geisler | Curry | NON-HARVEST RELATED TREATMENTS- Multiple Tan Oak trees have been identified as being infected with Sudden Oak Death (phytophthora ramorum) Non WUI. Total unit acres 21. Completed 4 acres on 12/2/21. Completed remaining 17 acres on 12/11/22. | 11-Dec-2022 17:43:53 |
Lower Rogue Oak Resiliency Unit 286 Piles |
1-27-2023 1000 |
6 8.57 |
T35S 11W Sec8 | 3 Miles East of Agness. 2308 Road to 3577 to 350 Spur. N42º 33.210’ W124º 02.682’ | Larrimore (T) Geisler (Actual) | Curry | WUI. NON-HARVEST RELATED TREATMENTS- Fuels to be treated were generated as a result of FMZ and landscape restoration. Generally, standing live vegetation (both conifer and hardwood) has been cut with chain saws, hand piled, and covered with plastic sheeting. | 27-Jan-2023 19:33:09 |
Lower Rogue Oak Resiliency Unit 211 Piles |
1-30-2023 1000 |
7 3.02 |
T35S 11W Sec21 | Raspberry Mountain 3.5 Miles East of Agness. 2308 Road to 3577 to 359 Spur. N42º 31.988’ W124º 01.257’ | Geisler | Curry | 31 Total Unit Acres. Completed 15 ac on 1/28/23. Completed 9 ac on 1/29/23. Completed the remaining 7 ac on 1/30/23. WUI. NON-HARVEST RELATED TREATMENTS- Fuels to be treated were generated as a result of FMZ and landscape restoration. Generally, standing live vegetation (both conifer and hardwood) has been cut with chain saws, hand piled, and covered with plastic sheeting. | 30-Jan-2023 18:09:49 |
Lower Rogue Oak Resiliency Unit 363 Piles |
1/27/23 1500 |
2 7 |
T35S 11W Sec18 | Agness | Smith | Curry | N42º 32.898’ W124º 02.530’ | 10-Feb-2023 16:16:21 |
Kimball Hill RX Underburn |
5/20/23 1000 |
192 15 |
T36 S R13 W SEC 8 | 9 Miles NE of Gold Beach | Rey Reyes | Curry | Completed 87 acres 5/19/23 Completed 41 acres 5/20/23. Ignitions to continue on 5/21/23. Remaining 64 acres completed 5/21/23 | 21-May-2023 19:16:03 |
Lower Rogue Oak Resiliency Unit 2 Piles |
10/25/23 1000 |
47 1.94 |
T35S 11W Sec29 | Oak Flat Illinios River 270 Rd N42º 31.475 W124º 02.460 | Andrew Larrimore | Curry | All acres completed on 10/25/23. WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 25-Oct-2023 17:23:34 |
Lower Rogue Oak Resiliency Unit 3 Piles |
10/25/23 1200 |
9 4.41 |
T35S 11W Sec29 | Oak Flat Illinios River N42º 31.247 W124º 02.418 | Andrew Larrimore | Curry | All acres completed on 10/25/23. WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 25-Oct-2023 17:24:12 |
Equine TS 11 Piles |
11/01/23 1100 |
10 6.9 |
37S 13W Sec 2 | Quosatans Butte | Larrimore | Curry | Unit completed on 11/1/23. N42° 24.132’, W124° 13.082’ Harvest Related Treatment. Fuels generated as a result of timber sale related activities, machine piled slash. Non WUI. | 1-Nov-2023 17:21:17 |
Lower Rogue Oak Resiliency Unit 291 Piles |
11/2/23 1000 |
21 7.93 |
T35S 11W Sec17 | 3 Miles East of Agness. 2308 Road to 3577 to 350 Spur. N42º 33.210’ W124º 02.682’ | Geisler | Curry | 31 Total Acres. Completed 10 ac on 1/27/23. Completed remaining 21 acres on 11/2/23. WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 2-Nov-2023 20:00:11 |
Lower Rogue Oak Resiliency Unit 74 Piles |
11/2/23 1000 |
47 7.5 |
T35S 11W Sec17 | Agness | Bordelon | Curry | Unit complete on 11/2/23. N42º 32.872’ W124º 02.447’ WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 2-Nov-2023 20:03:46 |
Green Knob TS Unit 1 Piles |
11/3/23 1000 |
22 6 |
T34S R11W Sec 27 | Lower Rogue 23Rd to 700 Spur | Larrimore | Curry | Accomplished All 22 acres 11-3-23 N42° 36.612' W123° 59.838' Harvest Related Treatment. Fuels generated as a result of timber sale related activities, machine piled slash. Non WUI. | 3-Nov-2023 18:05:53 |
Green Knob TS Unit 4 Piles |
11/3/23 1000 |
35 1.5 |
T34S R11W Sec 34 | Lower Rogue 23Rd to 842 Spur | Ernst | Curry | Completed All 35 Acres 11-3-23 N42° 36.622' W123° 59.757' Harvest Related Treatment. Fuels generated as a result of timber sale related activities, machine piled slash. Non WUI. | 3-Nov-2023 18:06:19 |
Green Knob TS Unit 6 Piles |
11/3/23 1200 |
61 5 |
T34S R11W Sec 27 and Sec 28 | Lower Rogue 23Rd to 700 Spur | Larrimore | Curry | Completed All 61 Acres 11-3-23 N42° 36.370' W124° 00.497' Harvest Related Treatment. Fuels generated as a result of timber sale related activities, machine piled slash. Non WUI. | 3-Nov-2023 18:06:44 |
Lower Rogue Oak Resiliency Unit 293 Piles |
11/3/23 1000 |
26 8.29 |
T35S 11W Sec9 | Raspberry Mountain | Geisler | Curry | Completed All 26 Acres 11-3-23 N42º 33.595 W124º 01.413 WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 3-Nov-2023 18:07:28 |
Lower Rogue Oak Resiliency Unit 285 Piles |
11/4/23 1200 |
20 7.14 |
T35S 11W Sec8 | Agness | Sandi Imlay | Curry | Completed 19 of 39 acres on 11/2/23. Completed remaining 20 acres on 11/4/23. N42º 33.368 W124º 02.565 WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 4-Nov-2023 18:45:03 |
Lower Rogue Oak Resiliency Unit 72 Piles |
11/4/23 1200 |
72 3.9 |
T35S 11W Sec8 | Agness | Sandi Imlay | Curry | Completed 30 of 102 Acres 11-3-23 Completed remaining 72 acres on 11/4/23. N42º 33.643 W124º 02.195 WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 4-Nov-2023 18:46:05 |
Shasta Oak Unit 1 Piles |
11-4-23 1200 |
34 5 |
T35S R11W Sec5 | Shasta Costa Creek | Larrimore | Curry | Completed 5 of 39 Acres 11-3-23 Completed remaining 34 acres on 11/4/23. N42º 34.475’ W124º 02.632’ WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 4-Nov-2023 18:52:53 |
Lower Rogue Oak Resiliency Unit 1 Piles |
11/5//23 1400 |
14 4.13 |
T35S 11W Sec20 | Oak Flat Illinios River | Sandi Imlay | Curry | Completed 8 of 22 acres on 10/25/23. Completed remaining 14 acres on 11/5/23. N42º 31.632 W124º 02.335 WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 5-Nov-2023 18:12:14 |
Lower Rogue Oak Resiliency Unit 260 Piles |
11/5/23 1100 |
3 10.8 |
T35S 11W Sec17 | Raspberry Mountain | Geisler | Curry | Completed on 11/5/23. N42º 32.555’ W124º 02.342’ WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 5-Nov-2023 18:22:31 |
Lower Rogue Oak Resiliency Unit 261 Piles |
11/5/23 1100 |
8 9.36 |
T35S 11W Sec17 | Raspberry Mountain | Geisler | Curry | Completed on 11/5/23. N42º 32.575’W124º 02.082’ WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 5-Nov-2023 18:22:58 |
Lower Rogue Oak Resiliency Unit 370 Piles |
11/5/23 1200 |
34 15 |
T35S 11W Sec17 | Raspberry Mountain | Geisler | Curry | Completed on 11/5/23. N42º 32.480 W124º 02.055 WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 5-Nov-2023 18:23:52 |
Chetco SOD 832 Piles |
11/6/23 1300 |
5 3 |
T 39S R 12W Sec 31 | Nook Bar | Sandi Imlay | Curry | Completed on 11/6/23. N42° 08.262’, W124° 10.117’ NON-WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of Sudden Oak Death (phytophthora ramorum) management activities. | 6-Nov-2023 17:36:26 |
Lower Rogue Oak Resiliency Unit 262 Piles |
11/6/23 1100 |
14 11.2 |
T35S 11W Sec17 | Raspberry Mountain | Geisler | Curry | Completed on 11/6/23. N42º 32.552’ W124º 01.883’ WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 6-Nov-2023 17:38:13 |
Lower Rogue Oak Resiliency Unit 6 Piles |
11/6/23 1200 |
73 4.9 |
T35S 11W Sec20 | Oak Flat Illinios River | Bordelon | Curry | Completed 72 of 145 acres on 11/5/23. Completed remaining 73 acres on 11/6/23. N42º 32.038 W124º 02.355 WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 6-Nov-2023 17:38:59 |
Miller Bar SOD 825 Piles |
11/6/23 1000 |
7 2.9 |
T 39S R 12W Sec 31 | Miller Bar | Sandi Imlay | Curry | Completed on 11/6/23. N42° 08.270’, W124° 10.570’ NON-WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of Sudden Oak Death (phytophthora ramorum) management activities. | 6-Nov-2023 17:39:35 |
Little Emily Creek SOD 694 Piles |
11/7/23 1200 |
8 7.5 |
T 40S R 12W Sec 7 | Emily Creek | Imlay | Curry | Completed on 11/7/23. N42º 06.534’ W124º 10.628’ NON-WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of Sudden Oak Death (phytophthora ramorum) management activities. | 7-Nov-2023 12:20:39 |
Shasta Oak Unit 10 Piles |
11/7/23 0900 |
73 7 |
T35S R11W Sec6 | Lower Rogue River 33Rd | Ernst | Curry | Completed on 11/7/23. N42º 34.878’ W124º 03.385’ WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 7-Nov-2023 14:16:28 |
Shasta Oak Unit 3 Piles |
11/7/23 1000 |
118 4 |
T35S R11W Sec5 & Sec6 | Lower Rogue River 33Rd/Bear Camp Junction | Larrimore | Curry | Completed on 11/7/23. N42º 34.573’ W124º 02.915’ WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 7-Nov-2023 15:57:09 |
Emily Creek SOD 651 Piles |
11/8/23 1100 |
9 7 |
T 39S R 12W Sec 32 | Emily Creek | Geisler | Curry | Completed on 11/8/23. N42º 07.722’ W124º 09.083’ NON-WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of Sudden Oak Death (phytophthora ramorum) management activities. | 8-Nov-2023 13:39:39 |
Shasta Oak Unit 2 Piles |
11/8/23 1200 |
30 4 |
T35S R11W Sec5 | Shasta Costa Creek | Larrimore | Curry | Completed 4 of 34 Acres 11-3-23 Completed remaining 30 acres on 11/8/23. N42º 34.503’ W124º 02.412’ WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restorastion. | 8-Nov-2023 13:41:11 |
Shasta Oak Unit 6 Piles |
11/8/23 1000 |
30 3 |
T35S R11W Sec4 & Sec5 | Shasta Costa Creek | Larrimore | Curry | Completed 7 of 45 Acres 11-3-23 Completed 8 acres on 11/4/23. Completed remaining 30 acres on 11/8/23. N42º 34.932’ W124º 01.778’ WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 8-Nov-2023 15:36:53 |
Deer Creek SOD 754 Piles |
11/9/23 1300 |
5 3 |
T41S R12W Sec 5 | Deer Creek | Imlay | Curry | Completed on 11/9/23. N42° 01.513’, W124° 08.128’ NON-WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of Sudden Oak Death (phytophthora ramorum) management activities. | 9-Nov-2023 17:55:44 |
Deer Creek SOD 831 Piles |
11/9/23 1500 |
7 3 |
T41S R12W Sec 5 | Deer Creek | Imlay | Curry | Completed on 11/9/23. N42° 01.707’, W124° 08.228’ NON-WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of Sudden Oak Death (phytophthora ramorum) management activities. | 9-Nov-2023 17:55:58 |
Robbins Rd SOD 797 Piles |
11/9/23 1100 |
6 3 |
T41S R12W Sec 9 | Winchuck River | Imlay | Curry | Completed on 11/9/23. N42° 01.147’, W124° 07.948’ NON-WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of Sudden Oak Death (phytophthora ramorum) management activities. | 9-Nov-2023 17:56:10 |
Winchuck SOD 829 Piles |
11/9/23 0900 |
7 3 |
T41S R12W Sec 9 | Winchuck River | Imlay | Curry | Completed on 11/9/23. N42° 01.373’, W124° 07.233’ NON-WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of Sudden Oak Death (phytophthora ramorum) management activities. | 9-Nov-2023 17:56:20 |
Lower Rogue Oak Resiliency Unit 361 Piles |
12/02/23 1000 |
14 6.66 |
T35S 11W Sec18 | 3 Miles East of Agness. 2308 Road to 3577 to 350 Spur. N42º 33.210’ W124º 02.682’ | Geisler | Curry | Total unit = 47 Acres. Completed 13 Acres 1/27/23. Completed 20 acres on 11/2/23. Completed remaining 14 acres on 12/2/23. WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 2-Dec-2023 13:49:40 |
Lower Rogue Oak Resiliency Unit 75 Piles |
12/02/23 1000 |
23 5.1 |
T35S 11W Sec8 & 18 | Agness | Larrimore | Curry | Completed all acres on 12/2/23. N42º 33.357 W124º 03.162 WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 2-Dec-2023 13:50:18 |
Lower Rogue Oak Resiliency Unit 77 Piles |
12/7/23 1400 |
22 6.34 |
T35S 11W Sec20 | Raspberry Mountain | Geisler | Curry | Completed 20 of 42 acres on 11/5/23. Completed remaining 22 acres on 12/7/23. N42º 32.258 W124º 01.855 WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 7-Dec-2023 19:13:30 |
Shasta Oak Unit 8 Piles |
12/8/23 1000 |
50 6 |
T35S R11W Sec5 | Shasta Costa Creek | Larrimore | Curry | Completed all remaining acres (50) 12/8/23 Completed 21 of 71 acres on 11/8/23. N42º 34.925’ W124º 02.160’ WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 8-Dec-2023 15:36:09 |
Lower Rogue Oak Resiliency Unit 263 Piles |
12/8/23 1000 |
2 7.94 |
T35S 11W Sec21 | Raspberry Mountain. 3 Miles East of Agness. 2308 Road to 3577 to 359 Spur. N42º 32.243’ W124º 01.410’ | Ernst | Curry | Total unit acres 39. Completed all remaining acres (2) 12/8/23 Completed 5 acres on 5/5/23. Completed 17 acres on 12/1/23. Completed 15 acres on 12/7/23. WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 8-Dec-2023 15:36:39 |
Lower Rogue Oak Resiliency Unit 287 Piles |
12/8/2023 1200 |
8 18.9 |
T35S 11W Sec17 | Raspberry Mountain. 3 Miles East of Agness. 2308 Road to 3577 to 350 Spur to 357 Spur. N42º 32.863’ W124º 02.493’ | Ernst | Curry | All acres completed 12/8/23 WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 8-Dec-2023 15:54:58 |
Pistol River SOD 717 Piles |
12/12/23 1000 |
17 1.5 |
T 38S R 13W Sec 8 | Pistol River | Larrimore | Curry | N42º 18.400’ W124º 15.985’ NON-WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of Sudden Oak Death (phytophthora ramorum) management activities. | 12-Dec-2023 15:56:23 |
Pistol River SOD 834 Piles |
12/13/23 1400 |
7 2.9 |
T 38S R 13W Sec 8 | Pistol River | Larrimore | Curry | All acres completed on 12/13/23. N42° 18.172’, W124° 16.548’ NON-WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of Sudden Oak Death (phytophthora ramorum) management activities. | 13-Dec-2023 11:12:03 |
Pistol River SOD 716 Piles |
12/13/23 1400 |
5 .5 |
T 38S R 13W Sec 19 | Pistol River | Bordelon | Curry | Completed all acres on 12/13/23. N42º 16.153’ W124º 16.897’ NON-WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of Sudden Oak Death (phytophthora ramorum) management activities. | 13-Dec-2023 13:06:49 |
Flat Fire Contingency 030 Road Piles |
11/5/24 1000 |
100 1.63 |
T37S 13W Sec16 | Hunter Creek Rd to 1503 Rd to 030 Spur | Geisler | Curry | N42° 22.30’ W124° 14.737’ 6.5 Miles of Roadside Contingency Prep from 2023 Flat Fire. Along the 030 Road. | 5-Nov-2024 17:24:35 |
Flat Fire Contingency 3680 Road Unit 1 Piles |
11/5/2024 1200 |
4 6.7 |
T37S R13W Sec 3 | Hunter Creek 3680/3313 Jnct to 280Spur | Geisler | Curry | Completed 10 of 14 acres on 10/23/23. Completed remaining acres on 11/5/24 N42° 24.610' W124° 13.575' Wildfire and Harvest Related Treatment. Fuels generated as a result of shaded fuel break related activities during the Flat Fire, machine piled slash. Non WUI. | 5-Nov-2024 17:25:08 |
Green Knob TS Unit 7 Piles |
11-14-24 1100 |
35 11.5 |
T34S R11W Sec 28 | Lower Rogue 23Rd to 700 Spur | Larrimore | Curry | Completed for all acres 11/14/2024 N42° 36.362' W124° 01.027' Harvest Related Treatment. Fuels generated as a result of timber sale related activities, machine piled slash. Non WUI. | 14-Nov-2024 18:48:43 |
Shasta Oak Unit 6a Piles |
11/14/24 1100 |
46 2.45 |
T35S 11W Sec4 | Shasta Costa Cr | Larrimore | Curry | Completed for all acres 11/14/2024 N42° 34.762’ W124° 01.775’ WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 14-Nov-2024 18:49:17 |
SOD Schrader Grove 840 Piles |
11-14-24 1100 |
38 0.8 |
T35S R13W Sec 31 | Lower Rogue N42° 29.863’ W124° 17.012’ | Bordelon | Curry | Completed for all acres 11/14/2024 NON-WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of Sudden Oak Death (phytophthora ramorum) management activities. | 14-Nov-2024 18:49:44 |
Shasta Oak Unit 11 Piles |
11/14/24 1100 |
55 2.85 |
T34S 11W Sec33 | Shasta Costa Cr | Bordelon | Curry | Completed for all acres 11/15/2024 N42° 35.072’ W124° 01.160’ WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of hazardous fuels reduction thinning and landscape restoration. | 15-Nov-2024 19:09:49 |
Adams Prairie Broadcast |
12-4-24 1100 |
225 3.0 |
T35S R12W Sec17 & Sec20 | Lower Rogue River confluence Tom East Creek | Brett Brown/Andrew Larrimore | Curry | 200 acres completed. No additional ignitions planned. N 42° 32.50’ W 124° 09.50’ | 4-Dec-2024 19:55:30 |
SOD Robins Road 830 Piles |
12/11/24 1100 |
11 1.7 |
T41S R12W Sec 9 | Winchuck River | Bordelon | Curry | N42° 01.161’ W124° 07.793’ NON-WUI hand piles. NON-HARVEST RELATED TREATMENTS- Fuels were generated as a result of Sudden Oak Death (phytophthora ramorum) management activities. Completed 12/11/24 | 11-Dec-2024 17:18:49 |
Smith River Complex Contingency 1106 Road Piles |
12/11/2024 1300 |
41 11.2 |
40S 12W Sec 32 | 1106 Rd Between South Bank of Chetco River and Winchuck River | Bordelon | Curry | All Acres Complete 12/12/24 N42° 02.750’ W124° 08.220’ Wildfire and Harvest Related Treatment. Fuels generated as a result of fuel break related activities during contingnency preperation for Smith River Complex in 2023, machine piled slash. Non WUI. | 12-Dec-2024 16:30:38 |